Jobs that follow AI data centers
Jobs come from where the money gathers
Railways made steelworks and engine drivers; power stations made electricians. Today the largest sums go to AI data centers. This page follows where that money flows and what work it creates.
The text on this page was written with AI assistance. AI disclosure
United States · AI data centers
How much money, since when, and whereMoney and power: since when, how much
- Capital spending, five big tech companies
- Estimated capital spending (in proportion to planned power additions) — ACW estimate, not a company figure
- Next-quarter guidance range (four companies' annual guidance less actuals, ACW calculation)
- Estimate for the same four companies — ACW estimate, not a company figure
- Data center construction spending (drawn at 10×)
- AI data center facility power capacity (right axis; Epoch AI estimate, dashed = planned)
View as a table
| Quarter | Capital spending, five big tech companies (US$ billion) | Estimated capital spending (in proportion to planned power additions) — ACW estimate, not a company figure | Data center construction spending (drawn at 10×) (US$ bn) | AI data center facility power capacity (right axis; Epoch AI estimate, dashed = planned) (GW) |
|---|---|---|---|---|
| 2019Q1 | 14.8 | – | 1.9 | 0.0 |
| 2019Q2 | 17.8 | – | 2.2 | 0.0 |
| 2019Q3 | 18.7 | – | 2.2 | 0.0 |
| 2019Q4 | 19.4 | – | 2.2 | 0.0 |
| 2020Q1 | 20.5 | – | 2.2 | 0.0 |
| 2020Q2 | 21.3 | – | 2.3 | 0.0 |
| 2020Q3 | 25.5 | – | 2.4 | 0.0 |
| 2020Q4 | 29.7 | – | 2.3 | 0.0 |
| 2021Q1 | 27.8 | – | 2.3 | 0.1 |
| 2021Q2 | 31.6 | – | 2.4 | 0.1 |
| 2021Q3 | 33.8 | – | 2.7 | 0.1 |
| 2021Q4 | 37.5 | – | 2.6 | 0.1 |
| 2022Q1 | 36.6 | – | 2.6 | 0.1 |
| 2022Q2 | 38.4 | – | 3.1 | 0.1 |
| 2022Q3 | 41.0 | – | 3.5 | 0.1 |
| 2022Q4 | 41.7 | – | 3.3 | 0.1 |
| 2023Q1 | 36.6 | – | 4.1 | 0.2 |
| 2023Q2 | 35.3 | – | 4.6 | 0.3 |
| 2023Q3 | 38.3 | – | 5.4 | 0.4 |
| 2023Q4 | 44.0 | – | 5.9 | 0.4 |
| 2024Q1 | 46.0 | – | 6.7 | 0.6 |
| 2024Q2 | 55.7 | – | 8.1 | 1.1 |
| 2024Q3 | 61.2 | – | 9.6 | 1.7 |
| 2024Q4 | 76.3 | – | 10.3 | 2.3 |
| 2025Q1 | 77.8 | – | 10.9 | 3.0 |
| 2025Q2 | 97.3 | – | 12.5 | 4.3 |
| 2025Q3 | 105.8 | – | 12.9 | 4.9 |
| 2025Q4 | 130.7 | – | 13.4 | 7.3 |
| 2026Q1 | 148.4 | – | 13.7 | 8.8 |
| 2026Q2 | 181.5 | – | 17.1 | 13.3 |
| 2026Q3 | 230.4 | – | 23.4 | 15.5 |
| 2026Q4 | – | 235.4 | – | 18.1 |
| 2027Q1 | – | 270.1 | – | 21.2 |
| 2027Q2 | – | 198.9 | – | 22.5 |
| 2027Q3 | – | 186.6 | – | 24.0 |
| 2027Q4 | – | 195.7 | – | 27.1 |
| 2028Q1 | – | 250.2 | – | 32.7 |
| 2028Q2 | – | 274.8 | – | 35.1 |
| 2028Q3 | – | 262.0 | – | 36.1 |
| 2028Q4 | – | 345.0 | – | 43.0 |
As of Q3 2026 · construction 2026Q3 · power capacity from Epoch's timelines file updated 2026-11-19
Bars are cash purchases of property and equipment by Amazon, Microsoft, Alphabet, Meta and Oracle (SEC filings, whole company). Assets acquired through finance leases are excluded, and Oracle's quarter ends in August. The teal line is U.S. Census private data center construction spending (buildings only), drawn at ten times its size so it is visible on the same scale. Where the line is above the bar, construction exceeds 10% of capital spending. SEC EDGAR · U.S. Census C30 · Epoch AI
Year-on-year growth in construction spending moved ahead of capital spending. Correlation is 0.61–0.91 at lags of four to eight quarters and no peak was established (ACW calculation). With only 19–23 quarters, read the direction only.
The blue line is the total power capacity of 77 U.S. sites as estimated by Epoch AI; the dashed part is each site's plan. The amber dashed line is an ACW estimate. It assumes capital spending moves in proportion to the power capacity added over the previous four quarters (last actual quarter: $230.4 billion ÷ 10.6 GW). It is not a company figure, and it may be low because future projects Epoch has not captured are missing.
The vertical bar is the guidance range of four companies ($223.3 billion to $243.3 billion): annual guidance less actual spending in the first three quarters. Oracle is not included and some guidance counts finance leases. The next-quarter estimate of $235.4 billion covers five companies and cannot be compared directly with this range. The same formula for the four companies without Oracle ($201.9 billion ÷ 10.6 GW × 10.8 GW) gives about $206.3 billion, shown as a hollow diamond. The range leans high because two companies' guidance includes finance leases. The added power capacity is Epoch's total and cannot be split between companies. We found no amounts for 2027 or later in the filings collected. Guidance sources: Amazon · Microsoft · Alphabet · Meta
AI data center power capacity in this chart and in the site table below is facility power (the whole facility, cooling included), not IT power. The line adds up site timelines (ACW sum); on the same basis the total as of 2026-11-21 is 16.2 GW.
Where they are being built
- Filled circle: 77 AI data centers, Epoch AI estimate (size = planned maximum facility power)
- Filled square: new or expanded power plant (size = announced capacity)
- Hollow square: contract with a plant already running (1 of them not yet checked against source)
- Blue background: sitting governor is a Democrat (24 states, as of 2026-11-28)
- Red background: sitting governor is a Republican (26 states, as of 2026-11-28)
As of site list 2026-11-18, power timelines 2026-11-19 (Epoch update date of each file) · current facility power computed to 2026-11-21 · power contracts 2026-11-27 · governors 2026-11-28
Party of the sitting governor (National Governors Association roster, as of 2026-11-28). The reason for using governors, and how states differ, are given below. The colours do not imply any causal link or judgement about parties and data center locations. NGA
| Site | Sites | Current facility power (Epoch estimate, to 2026-11-21) | Planned maximum facility power (Epoch estimate) |
|---|---|---|---|
| All 77 sites tracked by Epoch (ACW sum) | 77 | 16.2 GW | 43.4 GW |
| Microsoft Fairwater (Wisconsin) | 1 | 0.4 GW | 2.7 GW |
| OpenAI Stargate (New Mexico) | 1 | 0.0 GW | 2.5 GW |
| Anthropic–Amazon (Indiana) | 1 | 1.2 GW | 2.3 GW |
| Meta Hyperion (Louisiana) | 1 | 0.0 GW | 2.2 GW |
Source: Epoch AI data center dataset (site list updated 2026-11-18, power timelines updated 2026-11-19, CC BY 4.0). These are estimates from satellite imagery and permits. Epoch estimates that its database, which covers sites worldwide, captures 43% of global deployed AI computing capacity (as of 2026-11-21; 90% CI: 29% to 77%). This is a share of computing capacity, not of power or of the United States; do not read the total of 77 sites as all U.S. capacity. All values in the table are facility power. Coordinates mix address-level and city-level precision. The Meta Hyperion value is Epoch's estimate (to early 2028); the company's announced target is 5 GW. State boundaries are from U.S. Census boundary data (us-atlas).
Blue squares are power plants in contracts for data centers. Of 39 contracts (1 of them not yet checked against source), only those located to a plant, city or county are drawn (13 frameworks or undisclosed sites and 4 known only by state are left out). In 4 contracts one capacity figure covers several plants; each plant is drawn at the full contract size, so it looks larger than it is. Not drawn for lack of a stated capacity: 1.
39 power contracts and their sources (1 of them not yet checked against source)
| Announced | Buyer | Supplier | MW |
|---|---|---|---|
| 2023-05-10 | Microsoft | Helion Energy | 50 |
| 2024-05-01 | Microsoft | Brookfield (Brookfield Renewable) | 10,500 |
| 2024-06-11 | NV Energy · Fervo Energy | 115 | |
| 2024-09-20 | Microsoft | Constellation | 835 |
| 2024-10-14 | Kairos Power | 500 | |
| 2024-10-16 | Amazon | Energy Northwest · X-energy | 320 |
| 2024-10-16 | Amazon | Dominion Energy | 300 |
| 2024-12-05 | Meta | Entergy Louisiana | 2,260 |
| 2024-12-18 | Switch | Oklo | 12,000 |
| 2025-01-28 | Not named in the source | Engine No. 1 · Chevron · GE Vernova | 4,000 |
| 2025-02-11 | Vantage Data Centers | VoltaGrid | 1,000 |
| 2025-03-06 | Not named in the source | Williams (Will-Power) | 400 |
| 2025-04-02 | Homer City Energy Campus | Homer City Redevelopment · GE Vernova · Kiewit | 4,500 |
| 2025-05-07 | Elementl Power | 1,800 | |
| 2025-06-03 | Meta | Constellation | 1,121 |
| 2025-06-11 | Amazon (AWS) [not yet checked against source] | Talen Energy | 1,920 |
| 2025-06-26 | Meta | XGS Energy | 150 |
| 2025-06-30 | Commonwealth Fusion Systems | 200 | |
| 2025-07-15 | Brookfield | 670 | |
| 2025-07-24 | Crusoe | GE Vernova | 1,000 |
| 2025-08-18 | Kairos Power · TVA | 50 | |
| 2025-10-15 | Oracle (OCI) | VoltaGrid | 2,300 |
| 2025-10-27 | NextEra Energy | 615 | |
| 2025-10-27 | Meta | ENGIE North America | 600 |
| 2025-11-06 | Amazon (AWS) | Vistra | 1,200 |
| 2025-12-01 | Meta | Entergy Louisiana | 1,500 |
| 2025-12-22 | Alphabet (Google) | Intersect | – |
| 2026-01-09 | Meta | Vistra | 2,176 |
| 2026-01-09 | Meta | Vistra | 433 |
| 2026-01-09 | Meta | TerraPower | 690 |
| 2026-01-09 | Meta | Oklo | 1,200 |
| 2026-02-24 | CyrusOne | Calpine | 380 |
| 2026-04-13 | Oracle | Bloom Energy | 1,200 |
| 2026-06-30 | Brookfield | Bloom Energy | – |
| 2026-09-30 | Amazon | Constellation | 190 |
| 2026-09-30 | Amazon | Constellation | 500 |
| 2026-10-06 | Constellation | 890 | |
| 2026-10-19 | Amazon | X-energy · AEP | 960 |
| 2026-11-05 | NTT DATA (NTT Global Data Centers) | Bloom Energy | 900 |
The governor is used because in many states (35 by ACW's count, 28 of them confirmed in state government, commission or statutory sources) the governor appoints the utility commissioners who set power rates and certify plants, and signs data center tax incentive bills. In 10 states voters elect the commissioners. Only who selects the commissioners was checked, not the number of seats or terms. [not yet checked against source] 7 of 51 entries (50 states and Washington, D.C.) on selection methods have not yet been checked against the source.
How each state selects utility commissioners, with sources
As of 2026-11-28, the sitting governor's party differs from that of the winner of the November 2026 election in 6 states: Alaska, Georgia, Iowa, Nevada, Ohio, Texas (per the NGA elections page; not yet certified by state election authorities). Inaugurations: Alaska in December 2026, the others in January 2027. Map colours are changed after inauguration, when the roster is retrieved again.
United States · Power
How much is needed, what supplies it, and when it falls shortAll power: when it falls short
- Existing resources (forecast)
- With planned additions (planned, ACW sum)
- Required capacity (demand + reference margin) — ACW calculation, not a source value
- Demand (forecast)
View as a table
| Year | Existing resources (forecast) (GW) | With planned additions (planned, ACW sum) (GW) | Required capacity (demand + reference margin) — ACW calculation, not a source value (GW) | Demand (forecast) (GW) |
|---|---|---|---|---|
| 2026 | 189.7 | 195.6 | 178.8 | 150.8 |
| 2027 | 189.6 | 199.8 | 187.1 | 155.7 |
| 2028 | 186.0 | 200.5 | 196.6 | 161.3 |
| 2029 | 184.0 | 198.7 | 207.0 | 167.1 |
| 2030 | 184.0 | 198.7 | 220.4 | 174.5 |
| 2031 | 184.0 | 198.7 | 235.6 | 182.8 |
| 2032 | 184.0 | 198.7 | 248.9 | 190.3 |
| 2033 | 184.0 | 198.7 | 257.7 | 193.8 |
| 2034 | 184.0 | 198.7 | 265.8 | 196.7 |
| 2035 | 184.0 | 198.7 | 269.2 | 199.3 |
As of NERC 2025 Long-Term Reliability Assessment (2026-01)
Source: North American Electric Reliability Corporation (NERC), 2025 Long-Term Reliability Assessment. PJM is the largest U.S. grid and includes Virginia. NERC writes that PJM's reserve margin falls below its reference level in 2029 (margin 18.9%, reference 23.9%). The same document gives 2030 for MISO and 2032 for SPP. No official document states a year in which the United States as a whole falls short, so one area is drawn. "Required capacity" is an ACW calculation (NERC net demand × reference margin), and "with planned additions" adds two rows of the source. Resources are flat after 2030 because NERC counts only confirmed additions. The vertical axis does not start at zero. NERC
| Area or state | What the official document says | Source |
|---|---|---|
| PJM (13 eastern states) | Margin below reference in 2029 (forecast). The 2027/28 capacity auction fell 6.5 GW short of the requirement. Summer peak load +65.7 GW over ten years (forecast) | NERC · PJM · PJM load forecast |
| Texas (ERCOT) | High risk from 2029 (forecast). About 410 GW of large loads waiting for connection (requested capacity), about 87% of it data centers [not yet checked against source] | NERC · ERCOT (2026-04) |
| MISO (Midwest) | Resource deficit possible from summer 2030 (forecast) | NERC |
| SPP (south central) | Margin below the 19% reference in 2032 (forecast) | NERC |
| Virginia | Contracted data center capacity rose from 7.8 GW in 2023 to 16.9 GW in 2025; 47.0 GW including requests under review | Dominion integrated resource plan (2025-10) |
| Georgia | 10.0 GW of new generation certified, about 80% for data centers | Georgia Public Service Commission |
| North America | Summer peak demand up more than 224 GW over ten years (forecast). 13 of 23 areas at risk of shortfall. More than 105 GW of confirmed or announced retirements over ten years | NERC (2026-01) |
Areas are grid operators; states are regulator or utility plans. Only Virginia and Georgia plans have been collected so far.
Data centers within that: how much they use and what supplies it
- On-site gas11.2 GW · 50%
- Grid gas1.5 GW · 7%
- Fuel cells2.1 GW · 9%
- Small modular reactors3.5 GW · 16%
- Nuclear uprates1.5 GW · 7%
- Nuclear restarts1.5 GW · 6%
- Geothermal, solar, fusion1.1 GW · 5%
As of contract sample 2026-11-27
Use: U.S. Department of Energy and Lawrence Berkeley National Laboratory (2024-12). The 2028 value is a forecast range of 325–580 TWh. Fuel mix: a sample confirmed from company releases and filings, not a full count. Of 22.3 GW, 0 GW is confirmed by a source as running, 19.6 GW is announced and 2.7 GW is under construction or deployment. Contracts buying 6.9 GW (1 of them not yet checked against source) from nuclear plants already running are not new supply and are left out. The total adds 22 new builds, uprates and restarts, and still contains 0.9 GW in contracts that include sites outside the United States and 10.4 GW that the source states as "up to". This bar is a sample of data center contracts, so its scope differs from the national generation mix on other sheets (see "Indicators defined differently by country" below). U.S. DOE
Timeline: AI data centers and power side by side
- 2026-11
- 2026-10
- 2026-09
- 2026-07
- 2026-06
- 2026-04
- 2026-01
- 2025-12
- 2025-11
- 2025-10AI data centers
- 2025-09AI data centers
- 2025-07
- 2025-06
- 2025-04
- 2025-01AI data centers
- 2024-12AI data centers
- 2024-10
- 2024-09
- 2024-05
- 2024-03AI data centers
- 2023-05
- 2022-11AI data centers
- 2022-10
Selected from 76 collected events (25 on power), newest first. Events on one row fall in the same month; a blank side means no event was selected for that side that month. Grey bands are policy or outlooks. Titles link to the source. The first $5 billion month and the quarterly capital spending total are calculated from the data behind this page; for the total, each company name links to that company's filing.
Common · How to read this
Indicators that share a name but differ by sheetIndicators defined differently by country
The sheets place charts with the same names in the same positions, but the available data differ by country and so do the definitions. Comparisons between sheets (the United States is about 8 times South Korea and 44 times Japan in 2026Q3; ACW calculation) carry these differences.
| Indicator | United States | South Korea | China | Japan |
|---|---|---|---|---|
| ① Capital spending bars (scope and accounting) | Five hyperscalers. Cash purchases of property and equipment in filings, excluding finance leases. Oracle's quarter runs June–August. Whole company | Property and equipment purchases in eight companies' consolidated cash flow statements. Two chip makers are 94% of 2026Q3. KT includes investment property. Whole company | Tencent (annual bars, includes intangibles and land use rights) and Alibaba (fiscal-year line, includes logistics and offices). Not quarterly. Whole company | "Capital investment" disclosed by four telecom and internet companies. KDDI on a payment basis, SoftBank on an acceptance basis (including lease accounting and rental handsets), IIJ cash payments plus finance leases. Whole company |
| ① Construction line | Private data center construction spending (dollars, work done that month). Quarterly sum drawn at 10× | New floor area started in "broadcasting and telecommunications facilities" (public included, stations and studios included, whole area counted at start). 4-quarter average | No line (no data center construction series was found) | Floor area started for buildings used by the information and communications industry (exchanges, stations and offices included). 4-quarter average |
| ① Power line | Facility power capacity estimated by Epoch (77 sites, cumulative, GW) | Data center peak power in the 11th Basic Plan (national, demand, GW), inside baseline demand before demand management | Computing center electricity use (TWh): two points, 2025 actual and 2030 forecast | Forecast peak power added by new and expanded sites (the added part only, GW) |
| ③ Test for the year of shortfall | One area, PJM: the year the anticipated margin falls below the reference (2029). Summer peak; the required line is an ACW calculation | National: the year confirmed capacity falls below target (2031). The plan fills it with new construction. Summer peak | No official document states a year of shortfall (within what was collected). Only nameplate capacity and peak load are drawn | Years in which expected unserved energy exceeds the target (from FY2028). The national test uses values read from a published chart. Demand is the August three-day peak average |
| ④ Fuel mix | Announced capacity in a sample of data center contracts (GW), not the national mix | National generation (TWh), utilities only, excluding self-generation | National generation (TWh, 2025 preliminary). Thermal includes biomass. The source states no scope | National generation (TWh), utilities plus self-generation |
Common · Companies and occupations
Wherever they are built, the same supply chain and occupations followWhere the $37.9 billion for a 1 GW data center goes
Annual operating cost of a 1 GW data center (Epoch AI model estimate; bar lengths are an ACW calculation)
Bar lengths show only the relative size of annual operating cost items in the same model (a different basis from the upfront cost above). The largest is electricity. Epoch AI
As of 2026-05-14 (Epoch AI publication)
Source: Epoch AI, cost model of a 1 GW AI data center (CC BY 4.0). A stylized model, not any specific facility; 1 GW here is IT nameplate capacity, a different basis from the facility power on the sheets above. Percentages are ACW calculations, not source values. Dashed chips are roles not found as a separate occupation in official classifications (searched: O*NET, apprenticeship bulletin titles, the Korean Standard Classification of Occupations handbook). This model is Epoch AI's estimate, not an official statistic. According to the source, its inputs include a BCG analysis for staffing, Glassdoor for wages, SemiAnalysis estimates for server and network costs, and a Turner & Townsend index for facility costs. Epoch AI
Related companies
How the 33 companies were chosen: their filings or company materials describe products, demand or business related to AI, data center or cloud infrastructure (see the evidence link on each row). For 12 of them (§) we found no separate data center figure in the results documents we looked at. Rows marked as not yet checked against the source have not been confirmed. Selection is not an assessment. Rows are ordered by supply chain type.
| Type | Company | Market cap (mixed definitions and dates) | Operating income | Net income | Evidence |
|---|---|---|---|---|---|
| Chips and servers | NVIDIA | 4,000.0† | 130.4 | 120.1 | Source |
| Chips and servers | AMD | 232.3† | 3.7 | 4.3 | Source |
| Chips and servers | Broadcom | 939.2† | 25.5 | 23.1 | Source |
| Chips and servers | Marvell | 64.1† | 1.3 | 2.7 | Source |
| Chips and servers | Super Micro Computer § | 15.1† | 2.8 | 2.2 | Source |
| Chips and servers | Dell Technologies | 39.2† | 8.1 | 5.9 | Source |
| Chips and servers | Foxconn | 106.0 | 8.3 | 6.0 | Source |
| Foundry and equipment | TSMC | 1,885.8 | 61.7 | 54.8 | Source [not yet checked against source] |
| Foundry and equipment | ASML § | 612.2 | 13.3 | 11.3 | Source |
| Memory | SK hynix § | 287.4‡ | 32.7 | 29.7 | Source |
| Memory | Samsung Electronics | 492.2‡ | 30.2 | 30.7 | Source |
| Memory | Micron | 368.1† | 99.3 | 85.0 | Source |
| Networking and optics | Arista Networks § | 105.6† | 3.9 | 3.5 | Source |
| Networking and optics | Amphenol | 106.0† | 5.9 | 4.3 | Source |
| Networking and optics | Lumentum § | 16.5† | 0.5 | −6.9 | Source |
| Networking and optics | Coherent | 34.5† | – | 0.8 | Source |
| Networking and optics | Corning | 45.0† | 2.3 | 1.6 | Source |
| Electrical equipment | Vertiv § | 48.2† | 1.8 | 1.3 | Source |
| Electrical equipment | Eaton | 139.0† | – | 4.1 | Source |
| Electrical equipment | Schneider Electric § | 160.0 | – | 4.9 | Source |
| Electrical equipment | ABB | 134.0 | 6.0 | 4.7 | Source |
| Electrical equipment | Hitachi | 146.7 | – | 5.0 | Source |
| Electrical equipment | HD Hyundai Electric | 20.2‡ | 0.7 | 0.5 | Source |
| Electrical equipment | Hyosung Heavy Industries | 12.1‡ | 0.5 | 0.4 | Source |
| Electrical equipment | LS ELECTRIC | 10.0‡ | 0.3 | 0.2 | Source |
| Power generation | Siemens Energy § | – | – | 4.3 | Source |
| Power generation | GE Vernova | 144.0† | 1.4 | 4.9 | Source |
| Power generation | Bloom Energy § | 3.9† | 0.1 | −0.1 | Source |
| Power generation | Caterpillar | 180.9† | 11.2 | 8.9 | Source |
| Power generation | Cummins | 45.1† | 4.0 | 2.8 | Source |
| Cooling | Mitsubishi Heavy Industries § | 73.1 | – | 2.1 | Source |
| Cooling | Trane Technologies § | 97.2† | 4.0 | 2.9 | Source |
| Construction | Quanta Services § | 55.8† | 1.6 | 1.0 | Source |
As of fiscal years ending 2025-11-02 to 2026-09-30 · market cap 2024-06-28 to 2026-10-30
This table shows where AI data center spending goes. It is not a recommendation to buy or sell any company's shares and is not a basis for investment decisions. Figures are taken from company filings and exchange statistics and differ in fiscal year, definition and date.
US$ billion. Operating and net income are the latest annual results; other currencies are converted at Federal Reserve rates (ACW conversion). Shading in the operating and net income columns uses one colour and shows only larger or smaller within the column (log scale), not better or worse. The market cap column mixes definitions and is not shaded. "−" in red marks a loss and is not shaded. For the 6 companies with "–", we found no operating income line in the filings we checked.
Market values use official routes only, not quote sites, so definitions and dates are mixed. † is the market value held by non-affiliates on the cover of U.S. annual reports, smaller than total market cap (20 companies). ‡ marks 5 Korean companies: shares outstanding times the average price for December 2025 in the same annual report (ACW calculation). The 7 unmarked values are exchange statistics or company reports. Siemens Energy (1): blank because no official value was obtained.
Which occupations
Jobs supported by the same $1 million (United States, 2025)
BLS employment requirements. Applies only to what is produced in the United States; industry averages. BLS
56% of the money goes to servers, but the same amount supports 1.6 times as many jobs in construction as in semiconductors (ACW calculation). Chips and memory made outside the United States do not appear in U.S. employment statistics.
According to an industry statement, one building takes 12 to 18 months and about 1,500 people work at the peak of construction. Once built, about 50 remain, roughly half of them direct employees.
Industry statement reported by the Virginia legislature's audit body (JLARC), 2024. JLARC
| Occupation | Main industry | Employment 2025 | 2025→2035 (BLS projection) |
|---|---|---|---|
| Electricians | Electrical contractors | 545,000 | +11.4% |
| HVAC and refrigeration mechanics | Plumbing and HVAC contractors | 298,800 | +13.5% |
| Plumbers, pipefitters and steamfitters | Plumbing and HVAC contractors | 332,300 | +8.1% |
| Power-line installers | Electric power industry | 62,900 | +15.3% |
| Powerhouse, substation and relay repairers | Electric power industry | 13,000 | +12.9% |
| Semiconductor processing technicians | Semiconductor manufacturing | 27,700 | +8.9% |
| Power plant operators | Electric power industry | 19,800 | −6.4% |
BLS Employment Projections 2025–35, United States. Employment within that industry; not the data center share alone. Each occupation links to its page. BLS
Emerging roles
| Role | Current status |
|---|---|
| Data center technician | Listed as an apprenticeable occupation by the U.S. Labor Department on 2026-11-18. Installs servers and cables and checks redundant power |
| Commissioning engineer | Not found as a separate occupation (searched: O*NET 31.0, apprenticeship bulletin titles). Listed as one title of energy engineers |
| Liquid cooling maintenance | Not found within the search (O*NET, apprenticeship bulletin titles, Korean Standard Classification of Occupations handbook) |
| Critical facilities operation | Not found within the search (O*NET, apprenticeship bulletin titles, Korean Standard Classification of Occupations handbook) |
| Status in South Korea | "Data center" has 0 hits in classification and unit names on the official NCS site (control word "cloud" in classification names: 115). Not in the 2024 and 2025 announcements of new Dictionary of Occupations entries either (within the search). Adjacent units cover server and storage management and internet service infrastructure NCS · Ministry of Employment and Labor (2024-06) · Ministry of Employment and Labor (2025-07) |
As of searched 2026-11-26
How many jobs one gigawatt supports
ACW calculation, not a source value
| Where the money goes | Amount (Epoch model) | U.S. production share (ACW calculation) | Job-years (ACW calculation) | Calculable |
|---|---|---|---|---|
| Facility (construction) | $11.4B | 100% | 65,900 | Yes (upper bound) |
| Servers | $21.2B | 5~42% | 3,200~26,200 | 8× range |
| Network | $4.9B | 36~42% | 4,000~4,800 | Partly |
| Utility works | $0.16B | 52~100% | 400~900 | Partly |
| Land | $0.17B | – | – | Not applicable |
| Total (excluding land) | $37.7B | 73,500~97,800 |
As of cost model 2026-05 · employment coefficients 2025
Calculated by ACW; not a value from the sources. 1 GW is IT nameplate capacity. Epoch AI cost items × import shares of investment goods in BEA input-output tables × BLS employment requirements (2025). A job-year is one job supported for one year across the supply chain. Servers receive 56% of the money but support only 4–27% of the jobs, while the facility receives 30% and supports 67–90%. No official source gives the current U.S. production share of AI servers (BEA tables end in 2023), so read the server range as an order of magnitude only. Jobs outside the United States are not in this calculation.
Occupations on the power supply side
| Occupation (United States) | 2025→2035 (BLS projection) |
|---|---|
| Solar photovoltaic installers | +36.5% |
| Wind turbine technicians | +29.5% |
| Power-line installers (all industries) | +10.3% |
| Electrical engineers | +9.9% |
| Substation and relay repairers | +9.7% |
| Power plant operators (all industries) | −5.1% |
| Nuclear reactor operators | −5.9% |
| Source | Permanent on-site jobs per GW |
|---|---|
| Large nuclear | about 500 |
| Small modular reactor (estimate) | 237 |
| Coal | 107 |
| Wind | 80 |
| Solar | 36 |
| Gas | 30 |
As of BLS 2025–35 · U.S. DOE 2024-10
Left: BLS Employment Projections 2025–35, all industries. Right: U.S. Department of Energy (2024), a single source. All are figures for the whole power sector; no official source separating data center supply was found (within what was collected). The two agencies point in different directions on nuclear: BLS projects −5.2% employment in nuclear generation (operation) to 2035, while DOE sees about 375,000 more workers needed for 200 GW of new plants by 2050 (about 275,000 of them in construction and manufacturing). Periods and scopes differ, so they cannot be set against each other directly. DOE states that data centers are causing shortages in skilled electrical trades, and 36% of transmission and distribution companies named line workers as the hardest job to fill. The Labor Department issued seven power apprenticeship bulletins (eight occupational standards) in 2025–26. South Korea aims to train 4,500 nuclear specialists by 2030; no NCS unit for small modular reactors was found (within the search). U.S. DOE · BLS · Industry ministry (2023-05)