Solar Photovoltaic Installers
Construction and Extraction Occupations- Code O*NET-SOC
- 47-2231.00
Assemble, install, or maintain solar photovoltaic (PV) systems on roofs or other structures in compliance with site assessment and schematics. May include measuring, cutting, assembling, and bolting structural framing and solar modules. May perform minor electrical work such as current checks.
- Source des données: BLSPublié: 2026-08
Modérée· relative
FaibleQuatre bandes relativesTrès élevéeValeur par groupe professionnel
Échelle, base et source
Quatre bandes relatives (Faible / Modérée / Élevée / Très élevée)
831 métiers détaillés du tableau des projections d'emploi du BLS. La valeur est attribuée par code de la National Employment Matrix (NEM), si bien que les métiers partageant un code NEM reçoivent la même bande
- Source des données: AnthropicPublié: 2026-03
0,000
0,000Étendue des valeurs présentées ici0,745Échelle, base et source
Indice d'exposition observée, 0–1 tel que publié
Rapporté aux tâches O*NET
Publié par profession SOC 2018 ; chaque profession O*NET ayant le même code SOC 2018 reçoit cette valeur
- Source des données: ILOPublié: 2025
0,09–0,19· 2 groupes ISCO-08
Échelle, base et source
Indice d'exposition à l'IA générative, 0–1 tel que publié
Publié par groupe de base ISCO-08. Relié à ce métier, en tout ou en partie, en appliquant tels que publiés les tableaux de correspondance du U.S. Bureau of Labor Statistics (ISCO-08 vers SOC 2010, SOC 2010 vers SOC 2018)
Quelle est la nature de la valeur publiée par cette source
La catégorie BLS est un rang relatif et non un niveau absolu, et ce n'est pas une mesure de première main : elle regroupe en quatre bandes les rangs centiles du métier dans plusieurs études publiées. Ce n'est ni une prévision d'emploi ou de salaire, ni une probabilité d'adoption, et elle ne distingue pas automatisation et augmentation.
Valeur ILO pour chaque groupe ISCO-08 relié
- ISCO-08 7119Building Frame and Related Trades Workers Not Elsewhere Classified0,09
- ISCO-08 7411Building and Related Electricians0,19
Task-level exposure
Tâches exposées uniquement26 tâches évaluées · 6 tâches avec β ≥ 0,5 (23,1%)
β = exposition directe (E1) + 0,5 × exposition lorsque des outils sont disponibles (E2), selon la définition du dépôt source.
- Unité source : tâches O*NET 27.2 → code de métier O*NET 31.0
- Toutes les tâches notées figurent dans la liste des tâches O*NET 31.0.
- Source
- OpenAI "GPTs are GPTs" exposure rubric
- Version
- gh-main-0471612
- Licence
- MIT License, Copyright (c) 2024 OpenAI
| Task (O*NET 20.1) | Claude.aiRaw / share % |
|---|---|
Measure and analyze system performance and operating parameters to assess operating condition of systems or equipment.47-2231.00 | 0.039349.6 |
Check electrical installation for proper wiring, polarity, grounding, or integrity of terminations.47-2231.00 | 0.011114.0 |
Determine connection interfaces for additional subpanels or for connecting photovoltaic (PV) systems with utility services or other power generation sources.47-2231.00 | 0.00789.9 |
Identify installation locations with proper orientation, area, solar access, or structural integrity for photovoltaic (PV) arrays.47-2231.00 | 0.00688.5 |
Demonstrate system functionality and performance, including start-up, shut-down, normal operation, and emergency or bypass operations.47-2231.00 | 0.00364.6 |
Compile or maintain records of system operation, performance, and maintenance.47-2231.00 | 0.00354.4 |
Determine appropriate sizes, ratings, and locations for all system overcurrent devices, disconnect devices, grounding equipment, and surge suppression equipment.47-2231.00 | 0.00273.4 |
Determine materials, equipment, and installation sequences necessary to maximize installation efficiency.47-2231.00 | 0.00253.1 |
Program, adjust, or configure inverters and controls for desired set points and operating modes.47-2231.00 | 0.00202.5 |
| Not observed on any surface — 17 task(s) — These tasks have no row in the source for this release. The 0 in the share row is a display-stage composition ratio; absence is what the — in the raw row states. | |
Assemble solar modules, panels, or support structures, as specified. | —0 |
Install active solar systems, including solar collectors, concentrators, pumps, or fans. | —0 |
Install photovoltaic (PV) systems in accordance with codes and standards using drawings, schematics, and instructions. | —0 |
Perform routine photovoltaic (PV) system maintenance on modules, arrays, batteries, power conditioning equipment, safety systems, structural systems, weather sealing, or balance of systems equipment. | —0 |
Activate photovoltaic (PV) systems to verify system functionality and conformity to performance expectations. | —0 |
Apply weather sealing to array, building, or support mechanisms. | —0 |
Determine photovoltaic (PV) system designs or configurations based on factors such as customer needs, expectations, and site conditions. | —0 |
Examine designs to determine current requirements for all parts of the photovoltaic (PV) system electrical circuit. | —0 |
Identify and resolve any deficiencies in photovoltaic (PV) system installation or materials. | —0 |
Identify electrical, environmental, and safety hazards associated with photovoltaic (PV) installations. | —0 |
Identify methods for laying out, orienting, and mounting modules or arrays to ensure efficient installation, electrical configuration, or system maintenance. | —0 |
Install module array interconnect wiring, implementing measures to disable arrays during installation. | —0 |
Install required labels on solar system components and hardware. | —0 |
Test operating voltages to ensure operation within acceptable limits for power conditioning equipment, such as inverters and controllers. | —0 |
Visually inspect and test photovoltaic (PV) modules or systems. | —0 |
Diagram layouts and locations for photovoltaic (PV) arrays and equipment, including existing building or site features. | —0 |
Select mechanical designs, installation equipment, or installation plans that conform to environmental, architectural, structural, site, and code requirements. | —0 |
Values in this tab are predicted labels, not observations. Eloundou et al. (2023) published two rating regimes — human raters and GPT-4 — and the β shown here is derived from the GPT-4 rater basis alone; the same task can take a different value under the other regime. The unit and the meaning differ from the observed shares (%) in the other tabs, so do not place them on the same axis.
| Task (O*NET 27.2) | βE1 + 0.5 × E2 |
|---|---|
Determine photovoltaic (PV) system designs or configurations based on factors such as customer needs, expectations, and site conditions.O*NET Task ID 17749 | 0.5 |
Diagram layouts and locations for photovoltaic (PV) arrays and equipment, including existing building or site features.O*NET Task ID 17750 | 0.5 |
Identify installation locations with proper orientation, area, solar access, or structural integrity for photovoltaic (PV) arrays.O*NET Task ID 17754 | 0.5 |
Visually inspect and test photovoltaic (PV) modules or systems.O*NET Task ID 17762 | 0.5 |
Compile or maintain records of system operation, performance, and maintenance.O*NET Task ID 17763 | 0.5 |
Determine materials, equipment, and installation sequences necessary to maximize installation efficiency.O*NET Task ID 17765 | 0.5 |
Assemble solar modules, panels, or support structures, as specified.O*NET Task ID 17740 | 0.0 |
Install active solar systems, including solar collectors, concentrators, pumps, or fans.O*NET Task ID 17741 | 0.0 |
Install photovoltaic (PV) systems in accordance with codes and standards, using drawings, schematics, and instructions.O*NET Task ID 17742 | 0.0 |
Perform routine photovoltaic (PV) system maintenance on modules, arrays, batteries, power conditioning equipment, safety systems, structural systems, weather sealing, or balance of systems equipment.O*NET Task ID 17743 | 0.0 |
Activate photovoltaic (PV) systems to verify system functionality and conformity to performance expectations.O*NET Task ID 17744 | 0.0 |
Apply weather sealing to array, building, or support mechanisms.O*NET Task ID 17745 | 0.0 |
Check electrical installation for proper wiring, polarity, grounding, or integrity of terminations.O*NET Task ID 17746 | 0.0 |
Determine appropriate sizes, ratings, and locations for all system overcurrent devices, disconnect devices, grounding equipment, and surge suppression equipment.O*NET Task ID 17747 | 0.0 |
Determine connection interfaces for additional subpanels or for connecting photovoltaic (PV) systems with utility services or other power generation sources.O*NET Task ID 17748 | 0.0 |
Examine designs to determine current requirements for all parts of the photovoltaic (PV) system electrical circuit.O*NET Task ID 17751 | 0.0 |
Identify and resolve any deficiencies in photovoltaic (PV) system installation or materials.O*NET Task ID 17752 | 0.0 |
Identify electrical, environmental, and safety hazards associated with photovoltaic (PV) installations.O*NET Task ID 17753 | 0.0 |
Identify methods for laying out, orienting, and mounting modules or arrays to ensure efficient installation, electrical configuration, or system maintenance.O*NET Task ID 17755 | 0.0 |
Install module array interconnect wiring, implementing measures to disable arrays during installation.O*NET Task ID 17756 | 0.0 |
Install required labels on solar system components and hardware.O*NET Task ID 17757 | 0.0 |
Measure and analyze system performance and operating parameters to assess operating condition of systems or equipment.O*NET Task ID 17758 | 0.0 |
Program, adjust, or configure inverters and controls for desired set points and operating modes.O*NET Task ID 17759 | 0.0 |
Select mechanical designs, installation equipment, or installation plans that conform to environmental, architectural, structural, site, and code requirements.O*NET Task ID 17760 | 0.0 |
Test operating voltages to ensure operation within acceptable limits for power conditioning equipment, such as inverters and controllers.O*NET Task ID 17761 | 0.0 |
Demonstrate system functionality and performance, including start-up, shut-down, normal operation, and emergency or bypass operations.O*NET Task ID 17764 | 0.0 |
β = E1 + 0.5 × E2 · E1 = tasks where direct LLM access alone cuts time by at least 50%, E2 = tasks where software built on top of an LLM cuts time by at least 50%. Values take only 0 / 0.5 / 1.0.
Data sources & licenses — O*NET®, Anthropic Economic Index, Eloundou et al. (2023): see full notices on the Credits page
Toutes les tâches O*NET 31.0 (26)
Toutes les tâches O*NET 31.0 de ce métier (en anglais, telles que publiées ; type de tâche principale ou complémentaire). Les valeurs d'exposition ne figurent pas dans cette liste ; elles sont dans le tableau ci-dessus, à côté de chaque tâche dans la formulation de la version O*NET utilisée par chaque source.
| Tâche (O*NET 31.0) | Type |
|---|---|
| Assemble solar modules, panels, or support structures, as specified. | Principale |
| Install photovoltaic (PV) systems in accordance with codes and standards, using drawings, schematics, and instructions. | Principale |
| Perform routine photovoltaic (PV) system maintenance on modules, arrays, batteries, power conditioning equipment, safety systems, structural systems, weather sealing, or balance of systems equipment. | Principale |
| Activate photovoltaic (PV) systems to verify system functionality and conformity to performance expectations. | Principale |
| Apply weather sealing to array, building, or support mechanisms. | Principale |
| Check electrical installation for proper wiring, polarity, grounding, or integrity of terminations. | Principale |
| Determine appropriate sizes, ratings, and locations for all system overcurrent devices, disconnect devices, grounding equipment, and surge suppression equipment. | Principale |
| Determine connection interfaces for additional subpanels or for connecting photovoltaic (PV) systems with utility services or other power generation sources. | Principale |
| Determine photovoltaic (PV) system designs or configurations based on factors such as customer needs, expectations, and site conditions. | Principale |
| Diagram layouts and locations for photovoltaic (PV) arrays and equipment, including existing building or site features. | Principale |
| Examine designs to determine current requirements for all parts of the photovoltaic (PV) system electrical circuit. | Principale |
| Identify and resolve any deficiencies in photovoltaic (PV) system installation or materials. | Principale |
| Identify electrical, environmental, and safety hazards associated with photovoltaic (PV) installations. | Principale |
| Identify installation locations with proper orientation, area, solar access, or structural integrity for photovoltaic (PV) arrays. | Principale |
| Identify methods for laying out, orienting, and mounting modules or arrays to ensure efficient installation, electrical configuration, or system maintenance. | Principale |
| Install module array interconnect wiring, implementing measures to disable arrays during installation. | Principale |
| Install required labels on solar system components and hardware. | Principale |
| Measure and analyze system performance and operating parameters to assess operating condition of systems or equipment. | Principale |
| Program, adjust, or configure inverters and controls for desired set points and operating modes. | Principale |
| Select mechanical designs, installation equipment, or installation plans that conform to environmental, architectural, structural, site, and code requirements. | Principale |
| Test operating voltages to ensure operation within acceptable limits for power conditioning equipment, such as inverters and controllers. | Principale |
| Visually inspect and test photovoltaic (PV) modules or systems. | Principale |
| Compile or maintain records of system operation, performance, and maintenance. | Principale |
| Demonstrate system functionality and performance, including start-up, shut-down, normal operation, and emergency or bypass operations. | Principale |
| Determine materials, equipment, and installation sequences necessary to maximize installation efficiency. | Principale |
| Install active solar systems, including solar collectors, concentrators, pumps, or fans. | Complémentaire |
0,53/ 3· Indice d'exposition aux robots
Échelle, base et source
Chaque tâche physique reçoit une note de 0 à 3 selon l'environnement dans lequel des robots déjà déployés, vendus ou présentés en démonstration pourraient l'accomplir (0 aucun · 1 environnements conçus pour les robots, comme une cellule robotisée grillagée ou une ligne d'embouteillage · 2 installations structurées, comme une pharmacie hospitalière ou un port à conteneurs · 3 environnements non structurés, comme un domicile privé ou un chantier de construction), puis les notes sont moyennées selon la part du temps de travail
Tâches physiques parmi les tâches O*NET 29.3 de ce métier
Anthropic a estimé les notes et les parts de temps avec Claude Opus 5 à l'aide de la recherche web (situation en 2026).
L'indice d'exposition aux robots est une mesure différente des chiffres d'exposition à l'IA de ce site : il ne peut ni s'y ajouter ni leur être comparé. Il ne mesure ni l'adoption réelle ni le coût, et 0 couvre aussi les métiers sans tâche physique.
Note de chaque tâche physique
Niveaux d'environnement robotique (E0–E3)
E0 aucunDétails
Jugée non réalisable par des robots déployés, vendus ou présentés en démonstration, même dans un environnement conçu pour les robots
E1 environnements conçus pour les robotsDétails
Jugée réalisable dans un environnement construit autour de la machine, comme une cellule robotisée grillagée ou une ligne d'embouteillage
E2 installations structuréesDétails
Jugée réalisable dans un lieu de travail humain qu'une institution maintient selon une norme de travail, comme une pharmacie hospitalière ou un port à conteneurs
E3 environnements non structurésDétails
Jugée réalisable dans un environnement qu'aucune institution ne maintient selon une norme de travail, comme un domicile privé ou un chantier de construction
Seules les tâches classées comme physiques sont listées ; les autres tâches n'ont pas de niveau dans la source.
| Tâche (O*NET 29.3) | Niveau d'environnement robotique |
|---|---|
| Assemble solar modules, panels, or support structures, as specified. | E1 environnements conçus pour les robots |
| Install photovoltaic (PV) systems in accordance with codes and standards, using drawings, schematics, and instructions. | E0 aucun |
| Perform routine photovoltaic (PV) system maintenance on modules, arrays, batteries, power conditioning equipment, safety systems, structural systems, weather sealing, or balance of systems equipment. | E0 aucun |
| Activate photovoltaic (PV) systems to verify system functionality and conformity to performance expectations. | E1 environnements conçus pour les robots |
| Apply weather sealing to array, building, or support mechanisms. | E0 aucun |
| Check electrical installation for proper wiring, polarity, grounding, or integrity of terminations. | E1 environnements conçus pour les robots |
| Identify and resolve any deficiencies in photovoltaic (PV) system installation or materials. | E0 aucun |
| Identify installation locations with proper orientation, area, solar access, or structural integrity for photovoltaic (PV) arrays. | E3 environnements non structurés |
| Install module array interconnect wiring, implementing measures to disable arrays during installation. | E1 environnements conçus pour les robots |
| Install required labels on solar system components and hardware. | E1 environnements conçus pour les robots |
| Measure and analyze system performance and operating parameters to assess operating condition of systems or equipment. | E1 environnements conçus pour les robots |
| Test operating voltages to ensure operation within acceptable limits for power conditioning equipment, such as inverters and controllers. | E1 environnements conçus pour les robots |
| Visually inspect and test photovoltaic (PV) modules or systems. | E1 environnements conçus pour les robots |
| Demonstrate system functionality and performance, including start-up, shut-down, normal operation, and emergency or bypass operations. | E1 environnements conçus pour les robots |
| Install active solar systems, including solar collectors, concentrators, pumps, or fans. | E1 environnements conçus pour les robots |
Informations professionnelles
Perspectives d’emploi (BLS)
- Emploi, 2025
- 31K
- Emploi projeté, 2035
- 42K
- Variation (2025–35)
- +36,5%
- Salaire annuel médian, 2025
- $53 140
- Niveau d’études habituel à l’entrée
- High school diploma or equivalent
Liens avec la classification coréenne (KSCO)
Liens de la version en vigueur de Korea Occupation Direct Crosswalk v1.1, établi par AI Changing Work. Les valeurs de relation se lisent du côté du métier O*NET-SOC.
| Code KSCO | Intitulé KSCO | Relation | Statut |
|---|---|---|---|
| 76225 | 전기기기 설치 및 정비원 | Cette profession est plus étroite | confirmé |
| 23750 | 신재생에너지 시험원 | Lié, sans correspondance | confirmé |
Définitions des relations et des statuts(kr-direct v1.1)
Description professionnelle de l’OIT
AI Changing Work relie à cette profession les groupes de base ISCO-08 ci-dessous en appliquant, telles que publiées, les tables de correspondance du Bureau of Labor Statistics des États-Unis (BLS) (SOC 2018 vers SOC 2010, SOC 2010 vers ISCO-08), sans sélection au cas par cas ; chaque lien peut être total ou partiel.
- ISCO-08 7119Building Frame and Related Trades Workers Not Elsewhere Classified
Métiers qualifiés du bâtiment (gros oeuvre) et assimilés non classés ailleurs
- ISCO-08 7411Building and Related Electricians
Electriciens du bâtiment et assimilés
Sources: ILO ISCO-08 — details: Credits
Vocabulaire professionnel ESCO
Chaque entrée ci-dessous est mise en correspondance avec cette profession dans le ESCO-O*NET Crosswalk publié (version 1, 2022). Les types de correspondance sont ceux de cette table ; la formulation est celle d'AI Changing Work.
- électricien photovoltaïque/électricienne photovoltaïqueESCO 7411.1.4Même périmètre
Les électriciens/électriciennes photovoltaïque installent et entretiennent des systèmes qui collectent l’énergie solaire. Ils/Elles préparent les fixations nécessaires, souvent sur des toits, installent les panneaux solaires et les raccordent à un système électronique, comprenant notamment un onduleur, permettant de relier le système photovoltaïque au réseau électrique.
Source: European Commission, DG EMPL — ESCO API 2026-08-08 (bridge v1.2.1)
Licence: CC BY 4.0 (EU Reuse Notice)
ESCO reuse terms and the modification notice are in Credits.
Liens avec la classification française (ROME)
Liens établis par AI Changing Work, à l’aide de modèles d’IA, entre ce métier et des fiches ROME 4.0. Les relations se lisent du point de vue de ce métier. Les liens marqués « provisoire » ont été retenus sur la seule base des jugements de deux évaluateurs de la même famille de modèles (Claude), ou par une règle de l'exploitant appliquée à ces jugements, et reposent donc sur des éléments plus faibles que les liens confirmés.
| Code ROME | Intitulé ROME (français) | Relation |
|---|---|---|
| F1610 | Installateur mainteneur / Installatrice mainteneuse en systèmes solaires, thermiques et photovoltaïques | Cette profession est plus étroite |
| F1602 | Electricien / Electricienne du bâtiment | Lié, sans correspondance |
Source: France Travail — Répertoire Opérationnel des Métiers et des Emplois (ROME 4.0), version 61, last updated 15 June 2026 (https://www.data.gouv.fr/datasets/repertoire-operationnel-des-metiers-et-des-emplois-rome). Licence Ouverte 2.0.
ROME codes and titles are reproduced unchanged; the links to O*NET-SOC occupations are AI Changing Work's own judgment and are not a France Travail correspondence.
(AI Changing Work link release: fr-direct v1)
Liens avec la classification espagnole (CNO-11)
Liens établis par AI Changing Work, à l’aide de modèles d’IA, entre ce métier et des professions CNO-11. Les relations se lisent du point de vue de ce métier.
| Code CNO-11 | Intitulé CNO-11 (espagnol) | Relation |
|---|---|---|
| 7294 | Montadores-instaladores de placas de energía solar | Cette profession est plus étroite |
| 7510 | Electricistas de la construcción y afines | Lié, sans correspondance |
Source: Instituto Nacional de Estadística (INE), National Classification of Occupations 2011 (CNO-11, Royal Decree 1591/2010) — www.ine.es · Licensed CC BY 4.0. CNO-11 codes and Spanish titles are reproduced unchanged; the links to O*NET occupations are AI Changing Work's own judgment and are not an INE correspondence.
(AI Changing Work link release: es-direct v1)
Liens avec la classification allemande (KldB)
Liens établis par AI Changing Work, à l’aide de modèles d’IA, entre ce métier et des professions KldB. Les relations se lisent du point de vue de ce métier.
| Code KldB | Intitulé KldB (allemand) | Relation |
|---|---|---|
| 26242 | Berufe in der regenerativen Energietechnik - fachlich ausgerichtete Tätigkeiten | Chevauchement, pas identiqueprovisoire |
| 26212 | Berufe in der Bauelektrik - fachlich ausgerichtete Tätigkeiten | Lié, sans correspondanceprovisoire |
Source: © Statistik der Bundesagentur für Arbeit — Klassifikation der Berufe 2010 – überarbeitete Fassung 2020, https://statistik.arbeitsagentur.de. KldB codes and titles are reproduced unchanged; the links to O*NET occupations are AI Changing Work's own mapping (eigene Zuordnung) and are not a Bundesagentur für Arbeit correspondence.
(AI Changing Work link release: de-direct v1)
Liens avec la classification japonaise (JSCO)
Liens établis par AI Changing Work, à l’aide de modèles d’IA, entre ce métier et des professions JSCO. Les relations se lisent du point de vue de ce métier.
| Code JSCO | Intitulé JSCO (japonais) | Relation |
|---|---|---|
| 679 | その他の電気工事従事者 | Lié, sans correspondance |
Source: Ministry of Internal Affairs and Communications (MIC), Japan Standard Occupational Classification (Dec. 2009, MIC Notification No. 555). JSCO codes and Japanese titles are reproduced unchanged; the links to O*NET occupations are AI Changing Work's own judgment and are not a MIC correspondence.
(AI Changing Work link release: jp-direct v1)
Sources des données et licences de cette page, et avis de modification et de traduction d'AI Changing Work : Crédits et sources