Cost Estimators

Business & Financial Operations

AI exposure

  • Data source: BLSPublished: 2026-08

    High· relative

    LowFour relative bandsVery high

    Group-level value

    Scale, basis and source

    Four relative bands (Low / Moderate / High / Very high)

    831 detailed occupations in the BLS Employment Projections table. Assigned per National Employment Matrix (NEM) code, so occupations sharing a NEM code carry the same band

    Source dataset (XLSX download)

  • Data source: AnthropicPublished: 2026-03

    0.000

    0.000Range of values carried here0.745
    Scale, basis and source

    Observed exposure index, 0–1 as published

    Mapped onto O*NET tasks

    Source dataset

  • Data source: ILOPublished: 2025

    0.44

    0.09Range of values carried here0.70

    Group-level value

    Scale, basis and source

    Generative AI exposure index, 0–1 as published

    ISCO-08 unit group — every occupation sharing the code gets this value

    Computed by this site, not published by the ILO: of the 1,012 occupations this site links to the ILO dataset, 28% score at or above this value.

    Source dataset

What kind of figure this source publishes

The BLS category is a relative rank, not an absolute level, and it is not a first-hand measurement: it groups an occupation's percentile ranks across several published studies into four bands. It is not an employment or wage forecast, not a probability of adoption, and it does not separate automation from augmentation.

Task-level exposure

Exposed tasks only
TaskClaude.aiRaw / share %APIRaw / share %
Assess cost effectiveness of products, projects or services, tracking actual costs relative to bids as the project develops.

13-1051

0.006045.70.001716.5
Consult with clients, vendors, personnel in other departments or construction foremen to discuss and formulate estimates and resolve issues.

13-1051

0.004332.30.005553.6
Prepare estimates used by management for purposes such as planning, organizing, and scheduling work.

13-1051

0.002922.0—0
Prepare and maintain a directory of suppliers, contractors and subcontractors.
—00.003129.9
Not observed on any surface — 9 task(s) — These tasks have no row in the source for this release. The 0 in the share row is a display-stage composition ratio; absence is what the — in the raw row states.
Analyze blueprints and other documentation to prepare time, cost, materials, and labor estimates.
—0—0
Confer with engineers, architects, owners, contractors and subcontractors on changes and adjustments to cost estimates.
—0—0
Prepare estimates for use in selecting vendors or subcontractors.
—0—0
Review material and labor requirements to decide whether it is more cost-effective to produce or purchase components.
—0—0
Prepare cost and expenditure statements and other necessary documentation at regular intervals for the duration of the project.
—0—0
Set up cost monitoring and reporting systems and procedures.
—0—0
Establish and maintain tendering process, and conduct negotiations.
—0—0
Conduct special studies to develop and establish standard hour and related cost data or to effect cost reduction.
—0—0
Visit site and record information about access, drainage and topography, and availability of services such as water and electricity.
—0—0

Data sources & licenses — O*NET®, Anthropic Economic Index, Eloundou et al. (2023): see full notices on the Credits page

Occupation information