Production Designers
Arts, Design, Entertainment & MediaAI exposure
- Data source: BLSPublished: 2026-08
High· relative
LowFour relative bandsVery highGroup-level value
Scale, basis and source
Four relative bands (Low / Moderate / High / Very high)
831 detailed occupations in the BLS Employment Projections table. Assigned per National Employment Matrix (NEM) code, so occupations sharing a NEM code carry the same band
- Data source: AnthropicPublished: 2026-03
0.000
0.000Range of values carried here0.745Scale, basis and source
- Data source: ILOPublished: 2025
0.37
0.09Range of values carried here0.70Group-level value
Scale, basis and source
Generative AI exposure index, 0–1 as published
ISCO-08 unit group — every occupation sharing the code gets this value
Computed by this site, not published by the ILO: of the 1,012 occupations this site links to the ILO dataset, 53% score at or above this value.
What kind of figure this source publishes
The BLS category is a relative rank, not an absolute level, and it is not a first-hand measurement: it groups an occupation's percentile ranks across several published studies into four bands. It is not an employment or wage forecast, not a probability of adoption, and it does not separate automation from augmentation.
Task-level exposure
Exposed tasks onlyValues in this tab are predicted labels, not observations. Eloundou et al. (2023) published two rating regimes — human raters and GPT-4 — and the β shown here is derived from the GPT-4 rater basis alone; the same task can take a different value under the other regime. The unit and the meaning differ from the observed shares (%) in the other tabs, so do not place them on the same axis.
| Task | βE1 + 0.5 × E2 |
|---|---|
Examine objects to be included in exhibits to plan where and how to display them.O*NET Task ID 9284 | 0.5 |
Acquire, or arrange for acquisition of, specimens or graphics required to complete exhibits.O*NET Task ID 9285 | 0.5 |
Prepare rough drafts and scale working drawings of sets, including floor plans, scenery, and properties to be constructed.O*NET Task ID 9286 | 0.5 |
Estimate set- or exhibit-related costs, including materials, construction, and rental of props or locations.O*NET Task ID 9288 | 0.5 |
Develop set designs, based on evaluation of scripts, budgets, research information, and available locations.O*NET Task ID 9289 | 0.5 |
Direct and coordinate construction, erection, or decoration activities to ensure that sets or exhibits meet design, budget, and schedule requirements.O*NET Task ID 9290 | 0.5 |
Plan for location-specific issues, such as space limitations, traffic flow patterns, and safety concerns.O*NET Task ID 9292 | 0.5 |
Submit plans for approval, and adapt plans to serve intended purposes, or to conform to budget or fabrication restrictions.O*NET Task ID 9293 | 0.5 |
Prepare preliminary renderings of proposed exhibits, including detailed construction, layout, and material specifications, and diagrams relating to aspects such as special effects or lighting.O*NET Task ID 9294 | 0.5 |
Collaborate with those in charge of lighting and sound so that those production aspects can be coordinated with set designs or exhibit layouts.O*NET Task ID 9296 | 0.5 |
Confer with clients and staff to gather information about exhibit space, proposed themes and content, timelines, budgets, materials, or promotion requirements.O*NET Task ID 9287 | 0.0 |
Inspect installed exhibits for conformance to specifications and satisfactory operation of special-effects components.O*NET Task ID 9291 | 0.0 |
Select and purchase lumber and hardware necessary for set construction.O*NET Task ID 9295 | 0.0 |
Coordinate the removal of sets, props, and exhibits after productions or events are complete.O*NET Task ID 9299 | 0.0 |
Attend rehearsals and production meetings to obtain and share information related to sets.O*NET Task ID 9306 | 0.0 |
Arrange for outside contractors to construct exhibit structures.O*NET Task ID 9307 | 0.0 |
Coordinate the transportation of sets that are built off-site, and coordinate their setup at the site of use.O*NET Task ID 9310 | 0.0 |
β = E1 + 0.5 × E2 · E1 = tasks where direct LLM access alone cuts time by at least 50%, E2 = tasks where software built on top of an LLM cuts time by at least 50%. Values take only 0 / 0.5 / 1.0.
Data sources & licenses — O*NET®, Eloundou et al. (2023): see full notices on the Credits page