Electrical and Electronics Drafters
Architecture and Engineering Occupations- Código O*NET-SOC
- 17-3012.00
Prepare wiring diagrams, circuit board assembly diagrams, and layout drawings used for the manufacture, installation, or repair of electrical equipment.
- Fuente de datos: BLSPublicado: 2026-08
Muy alto· relativa
BajoCuatro bandas relativasMuy altoValor por grupo ocupacional
Escala, base y fuente
Cuatro bandas relativas (Bajo / Moderado / Alto / Muy alto)
831 ocupaciones detalladas de la tabla de proyecciones de empleo de BLS. El valor se asigna por código de la National Employment Matrix (NEM), de modo que las ocupaciones que comparten un código NEM reciben la misma banda
- Fuente de datos: AnthropicPublicado: 2026-03
0,089
0,000Rango de los valores aquí recogidos0,745Escala, base y fuente
Índice de exposición observada, 0–1 tal como se publica
Mapeado sobre tareas de O*NET
Publicado por ocupación SOC 2018; toda ocupación O*NET con el mismo código SOC 2018 recibe este valor
- Fuente de datos: ILOPublicado: 2025
0,35
0,09Rango de los valores aquí recogidos0,70Valor por grupo ocupacional
Escala, base y fuente
Índice de exposición a la IA generativa, 0–1 tal como se publica
Publicado por grupo primario ISCO-08. Vinculado a esta ocupación, total o parcialmente, aplicando tal como se publicaron las tablas de correspondencia de la U.S. Bureau of Labor Statistics (ISCO-08 a SOC 2010, SOC 2010 a SOC 2018)
Qué tipo de cifra publica esta fuente
La categoría de BLS es un rango relativo, no un nivel absoluto, y tampoco es una medición de primera mano: agrupa en cuatro bandas los rangos percentiles de la ocupación en varios estudios publicados. No es una previsión de empleo ni de salarios, no es una probabilidad de adopción y no distingue entre automatización y aumento.
Task-level exposure
Solo tareas expuestas30 tareas evaluadas · 28 tareas con β ≥ 0,5 (93,3%)
β = exposición directa (E1) + 0,5 × exposición con herramientas disponibles (E2), según la definición del repositorio de origen.
- Unidad de origen: tareas de O*NET 27.2 → código de ocupación de O*NET 31.0
- Todas las tareas puntuadas figuran en la lista de tareas de O*NET 31.0.
- Fuente
- OpenAI "GPTs are GPTs" exposure rubric
- Versión
- gh-main-0471612
- Licencia
- MIT License, Copyright (c) 2024 OpenAI
Tareas de las ocupaciones O*NET-SOC 2010 17-3012.01 Electronic Drafters; 17-3012.02 Electrical Drafters, que hemos vinculado a esta ocupación mediante la tabla de correspondencia oficial O*NET-SOC 2010 a 2019
| Task (O*NET 20.1) | Claude.aiRaw / share % | APIRaw / share % |
|---|---|---|
Key and program specified commands and engineering specifications into computer system to change functions and test final layout.17-3012.01 | 0.026072.5 | 0.073689.3 |
Review completed construction drawings and cost estimates for accuracy and conformity to standards and regulations.17-3012.02 | 0.004111.6 | 0.00263.2 |
Locate files relating to specified design project in database library, load program into computer, and record completed job data.17-3012.01 | 0.00246.6 | 0.00617.5 |
Assemble documentation packages and produce drawing sets which are checked by an engineer or an architect.17-3012.02 | 0.00184.9 | —0 |
Study work order requests to determine type of service, such as lighting or power, demanded by installation.17-3012.02 | 0.00164.3 | —0 |
| Not observed on any surface — 25 task(s) — These tasks have no row in the source for this release. The 0 in the share row is a display-stage composition ratio; absence is what the — in the raw row states. | ||
Draft detail and assembly drawings of design components, circuitry and printed circuit boards, using computer-assisted equipment or standard drafting techniques and devices. | —0 | —0 |
Consult with engineers to discuss and interpret design concepts, and determine requirements of detailed working drawings. | —0 | —0 |
Examine electronic schematics and supporting documents to develop, compute, and verify specifications for drafting data, such as configuration of parts, dimensions, and tolerances. | —0 | —0 |
Review work orders and procedural manuals and confer with vendors and design staff to resolve problems and modify design. | —0 | —0 |
Supervise and coordinate work activities of workers engaged in drafting, designing layouts, assembling, and testing printed circuit boards. | —0 | —0 |
Compare logic element configuration on display screen with engineering schematics and calculate figures to convert, redesign, and modify element. | —0 | —0 |
Review blueprints to determine customer requirements and consult with assembler regarding schematics, wiring procedures, and conductor paths. | —0 | —0 |
Train students to use drafting machines and to prepare schematic diagrams, block diagrams, control drawings, logic diagrams, integrated circuit drawings, and interconnection diagrams. | —0 | —0 |
Generate computer tapes of final layout design to produce layered photo masks and photo plotting design onto film. | —0 | —0 |
Select drill size to drill test head, according to test design and specifications, and submit guide layout to designated department. | —0 | —0 |
Copy drawings of printed circuit board fabrication using print machine or blueprinting procedure. | —0 | —0 |
Plot electrical test points on layout sheets and draw schematics for wiring test fixture heads to frames. | —0 | —0 |
Use computer-aided drafting equipment or conventional drafting stations, technical handbooks, tables, calculators, and traditional drafting tools, such as boards, pencils, protractors, and T-squares. | —0 | —0 |
Confer with engineering staff and other personnel to resolve problems. | —0 | —0 |
Draft working drawings, wiring diagrams, wiring connection specifications or cross-sections of underground cables, as required for instructions to installation crew. | —0 | —0 |
Draw master sketches to scale showing relation of proposed installations to existing facilities and exact specifications and dimensions. | —0 | —0 |
Measure factors that affect installation and arrangement of equipment, such as distances to be spanned by wire and cable. | —0 | —0 |
Explain drawings to production or construction teams and provide adjustments as necessary. | —0 | —0 |
Reproduce working drawings on copy machines or trace drawings in ink. | —0 | —0 |
Design electrical systems, such as lighting systems. | —0 | —0 |
Prepare and interpret specifications, calculating weights, volumes, and stress factors. | —0 | —0 |
Supervise and train other technologists, technicians and drafters. | —0 | —0 |
Visit proposed installation sites and draw rough sketches of location. | —0 | —0 |
Determine the order of work and the method of presentation, such as orthographic or isometric drawing. | —0 | —0 |
Write technical reports and draw charts that display statistics and data. | —0 | —0 |
Values in this tab are predicted labels, not observations. Eloundou et al. (2023) published two rating regimes — human raters and GPT-4 — and the β shown here is derived from the GPT-4 rater basis alone; the same task can take a different value under the other regime. The unit and the meaning differ from the observed shares (%) in the other tabs, so do not place them on the same axis.
| Task (O*NET 27.2) | βE1 + 0.5 × E2 |
|---|---|
Confer with engineering staff and other personnel to resolve problems.O*NET Task ID 21950 | 1.0 |
Study work order requests to determine type of service, such as lighting or power, demanded by installation.O*NET Task ID 21956 | 1.0 |
Key and program specified commands and engineering specifications into computer system to change functions and test final layout.O*NET Task ID 21961 | 1.0 |
Determine the order of work and the method of presentation, such as orthographic or isometric drawing.O*NET Task ID 21964 | 1.0 |
Write technical reports and draw charts that display statistics and data.O*NET Task ID 21969 | 1.0 |
Prepare and interpret specifications, calculating weights, volumes, or stress factors.O*NET Task ID 21972 | 1.0 |
Use computer-aided drafting equipment or conventional drafting stations, technical handbooks, tables, calculators, or traditional drafting tools, such as boards, pencils, protractors, or T-squares.O*NET Task ID 21974 | 1.0 |
Draft working drawings, wiring diagrams, wiring connection specifications, or cross-sections of underground cables, as required for instructions to installation crew.O*NET Task ID 21945 | 0.5 |
Assemble documentation packages and produce drawing sets to be checked by an engineer or an architect.O*NET Task ID 21946 | 0.5 |
Consult with engineers to discuss or interpret design concepts, or determine requirements of detailed working drawings.O*NET Task ID 21947 | 0.5 |
Review completed construction drawings and cost estimates for accuracy and conformity to standards and regulations.O*NET Task ID 21948 | 0.5 |
Examine electronic schematics and supporting documents to develop, compute, and verify specifications for drafting data, such as configuration of parts, dimensions, or tolerances.O*NET Task ID 21949 | 0.5 |
Draft detail and assembly drawings of design components, circuitry or printed circuit boards, using computer-assisted equipment or standard drafting techniques and devices.O*NET Task ID 21951 | 0.5 |
Measure factors that affect installation and arrangement of equipment, such as distances to be spanned by wire and cable.O*NET Task ID 21952 | 0.5 |
Locate files relating to specified design project in database library, load program into computer, and record completed job data.O*NET Task ID 21953 | 0.5 |
Design electrical systems, such as lighting systems.O*NET Task ID 21954 | 0.5 |
Draw master sketches to scale showing relation of proposed installations to existing facilities and exact specifications and dimensions.O*NET Task ID 21955 | 0.5 |
Explain drawings to production or construction teams and provide adjustments, as necessary.O*NET Task ID 21957 | 0.5 |
Review work orders or procedural manuals and confer with vendors or design staff to resolve problems or modify design.O*NET Task ID 21958 | 0.5 |
Reproduce working drawings on copy machines or trace drawings in ink.O*NET Task ID 21959 | 0.5 |
Generate computer tapes of final layout design to produce layered photo masks or photo plotting design onto film.O*NET Task ID 21960 | 0.5 |
Supervise and coordinate work activities of workers engaged in drafting, designing layouts, assembling, or testing printed circuit boards.O*NET Task ID 21962 | 0.5 |
Compare logic element configuration on display screen with engineering schematics and calculate figures to convert, redesign, or modify element.O*NET Task ID 21963 | 0.5 |
Review blueprints to determine customer requirements and consult with assembler regarding schematics, wiring procedures, or conductor paths.O*NET Task ID 21965 | 0.5 |
Visit proposed installation sites and draw rough sketches of location.O*NET Task ID 21966 | 0.5 |
Plot electrical test points on layout sheets and draw schematics for wiring test fixture heads to frames.O*NET Task ID 21968 | 0.5 |
Copy drawings of printed circuit board fabrication using print machine or blueprinting procedure.O*NET Task ID 21970 | 0.5 |
Train students to use drafting machines and to prepare schematic diagrams, block diagrams, control drawings, logic diagrams, integrated circuit drawings, or interconnection diagrams.O*NET Task ID 21971 | 0.5 |
Select drill size to drill test head, according to test design and specifications, and submit guide layout to designated department.O*NET Task ID 21967 | 0.0 |
Supervise or train other technologists, technicians, or drafters.O*NET Task ID 21973 | 0.0 |
β = E1 + 0.5 × E2 · E1 = tasks where direct LLM access alone cuts time by at least 50%, E2 = tasks where software built on top of an LLM cuts time by at least 50%. Values take only 0 / 0.5 / 1.0.
Data sources & licenses — O*NET®, Anthropic Economic Index, Eloundou et al. (2023): see full notices on the Credits page
Todas las tareas de O*NET 31.0 (30)
Todas las tareas de O*NET 31.0 de esta ocupación (en inglés, tal como se publicaron; tipo de tarea principal o complementaria). Los valores de exposición no figuran en esta lista; están en la tabla de arriba, junto a cada tarea con la redacción de la versión de O*NET que usó cada fuente.
| Tarea (O*NET 31.0) | Tipo |
|---|---|
| Draft working drawings, wiring diagrams, wiring connection specifications, or cross-sections of underground cables, as required for instructions to installation crew. | Principal |
| Assemble documentation packages and produce drawing sets to be checked by an engineer or an architect. | Principal |
| Consult with engineers to discuss or interpret design concepts, or determine requirements of detailed working drawings. | Principal |
| Review completed construction drawings and cost estimates for accuracy and conformity to standards and regulations. | Principal |
| Examine electronic schematics and supporting documents to develop, compute, and verify specifications for drafting data, such as configuration of parts, dimensions, or tolerances. | Principal |
| Confer with engineering staff and other personnel to resolve problems. | Principal |
| Draft detail and assembly drawings of design components, circuitry or printed circuit boards, using computer-assisted equipment or standard drafting techniques and devices. | Principal |
| Measure factors that affect installation and arrangement of equipment, such as distances to be spanned by wire and cable. | Principal |
| Locate files relating to specified design project in database library, load program into computer, and record completed job data. | Principal |
| Design electrical systems, such as lighting systems. | Principal |
| Draw master sketches to scale showing relation of proposed installations to existing facilities and exact specifications and dimensions. | Principal |
| Study work order requests to determine type of service, such as lighting or power, demanded by installation. | Principal |
| Explain drawings to production or construction teams and provide adjustments, as necessary. | Principal |
| Review work orders or procedural manuals and confer with vendors or design staff to resolve problems or modify design. | Principal |
| Reproduce working drawings on copy machines or trace drawings in ink. | Principal |
| Compare logic element configuration on display screen with engineering schematics and calculate figures to convert, redesign, or modify element. | Principal |
| Review blueprints to determine customer requirements and consult with assembler regarding schematics, wiring procedures, or conductor paths. | Principal |
| Generate computer tapes of final layout design to produce layered photo masks or photo plotting design onto film. | Complementaria |
| Key and program specified commands and engineering specifications into computer system to change functions and test final layout. | Complementaria |
| Supervise and coordinate work activities of workers engaged in drafting, designing layouts, assembling, or testing printed circuit boards. | Complementaria |
| Determine the order of work and the method of presentation, such as orthographic or isometric drawing. | Complementaria |
| Visit proposed installation sites and draw rough sketches of location. | Complementaria |
| Select drill size to drill test head, according to test design and specifications, and submit guide layout to designated department. | Complementaria |
| Plot electrical test points on layout sheets and draw schematics for wiring test fixture heads to frames. | Complementaria |
| Write technical reports and draw charts that display statistics and data. | Complementaria |
| Copy drawings of printed circuit board fabrication using print machine or blueprinting procedure. | Complementaria |
| Train students to use drafting machines and to prepare schematic diagrams, block diagrams, control drawings, logic diagrams, integrated circuit drawings, or interconnection diagrams. | Complementaria |
| Prepare and interpret specifications, calculating weights, volumes, or stress factors. | — |
| Supervise or train other technologists, technicians, or drafters. | — |
| Use computer-aided drafting equipment or conventional drafting stations, technical handbooks, tables, calculators, or traditional drafting tools, such as boards, pencils, protractors, or T-squares. | — |
0,04/ 3· Índice de exposición a robots
Escala, base y fuente
Cada tarea física se califica de 0 a 3 según el entorno en el que robots ya implantados, vendidos o demostrados podrían realizarla (0 ninguno · 1 entornos diseñados para robots, como una celda de máquinas vallada o una línea de embotellado · 2 instalaciones estructuradas, como una farmacia hospitalaria o un puerto de contenedores · 3 entornos no estructurados, como un hogar particular o una obra de construcción), y las calificaciones se promedian según la proporción del tiempo de trabajo
Tareas físicas entre las tareas O*NET 29.3 de esta ocupación
Anthropic estimó las calificaciones y las proporciones de tiempo con Claude Opus 5 mediante búsqueda web (situación en 2026).
El índice de exposición a robots es una medida distinta de las cifras de exposición a la IA de este sitio y no puede sumarse a ellas ni compararse con ellas. No mide la adopción real ni el coste, y el 0 también incluye ocupaciones sin tareas físicas.
Calificación de cada tarea física
Niveles de entorno robótico (E0–E3)
E0 ningunoDetalles
Calificada como no realizable por robots que se han implantado, vendido o demostrado, ni siquiera en un entorno diseñado para robots
E1 entornos diseñados para robotsDetalles
Calificada como realizable en un entorno construido en torno a la máquina, como una celda de máquinas vallada o una línea de embotellado
E2 instalaciones estructuradasDetalles
Calificada como realizable en una instalación de trabajo de personas que una institución mantiene según un estándar de trabajo, como una farmacia hospitalaria o un puerto de contenedores
E3 entornos no estructuradosDetalles
Calificada como realizable en un entorno que ninguna institución mantiene según un estándar de trabajo, como un hogar particular o una obra de construcción
Solo se enumeran las tareas clasificadas como físicas; las demás tareas no tienen nivel en la fuente.
| Tarea (O*NET 29.3) | Nivel de entorno robótico |
|---|---|
| Reproduce working drawings on copy machines or trace drawings in ink. | E1 entornos diseñados para robots |
| Visit proposed installation sites and draw rough sketches of location. | E2 instalaciones estructuradas |
| Copy drawings of printed circuit board fabrication using print machine or blueprinting procedure. | E2 instalaciones estructuradas |
Información ocupacional
Perspectivas de empleo (BLS)
- Empleo, 2025
- 19K
- Empleo proyectado, 2035
- 18K
- Variación (2025–35)
- -3,4%
- Salario anual mediano, 2025
- $76.870
- Formación habitual para acceder
- Associate's degree
Vínculos con la clasificación coreana (KSCO)
Vínculos de la versión vigente de Korea Occupation Direct Crosswalk v1.1, elaborado por AI Changing Work. Los valores de relación se leen desde la ocupación O*NET-SOC.
| Código KSCO | Nombre KSCO | Relación | Estado |
|---|---|---|---|
| 23954 | 전기 및 전자 장비 제도사 | Mismo alcance | confirmado |
Definiciones de relación y estado(kr-direct v1.1)
Descripción ocupacional de la OIT
AI Changing Work vincula a esta ocupación los grupos primarios de la ISCO-08 que figuran abajo aplicando, tal como se publicaron, las tablas de correspondencia de la Oficina de Estadísticas Laborales de EE. UU. (BLS) (SOC 2018 a SOC 2010, SOC 2010 a ISCO-08), sin selección caso por caso; cada vínculo puede ser total o parcial.
- ISCO-08 3118Draughtspersons
Delineantes y dibujantes técnicos
Sources: ILO ISCO-08 — details: Credits
Vocabulario ocupacional ESCO
Cada entrada de abajo está emparejada con esta ocupación en el ESCO-O*NET Crosswalk publicado (versión 1, 2022). Los tipos de correspondencia son los de esa tabla; la redacción es de AI Changing Work.
- dibujante técnico/dibujante técnicaESCO 3118.3Esta ocupación es más estrecha
Los dibujantes técnicos preparan y crean dibujos técnicos utilizando un programa informático especial o técnicas manuales para mostrar cómo se construye o funciona.
- técnico en diseño de sistemas eléctricos/técnica en diseño de sistemas eléctricosESCO 3118.3.6Esta ocupación es más amplia
Los técnicos en diseño de sistemas eléctricos prestan apoyo a los ingenieros en el diseño y la conceptualización de equipos eléctricos. Esbozan, con el apoyo de programas informáticos especializados, las especificaciones de un número variado de sistemas eléctricos, como los transformadores de tensión, las centrales eléctricas o el suministro de energía en los edificios.
- técnico en diseño electromecánico/técnica en diseño electromecánicoESCO 3118.3.7Esta ocupación es más amplia
Los técnicos en diseño electromecánico diseñan y crean planos junto a los ingenieros electromecánicos. Interpretan las especificaciones y los requisitos que impone el ingeniero y diseñan equipos y componentes electromecánicos.
- técnico en diseño electrónico/técnica en diseño electrónicoESCO 3118.3.8Esta ocupación es más amplia
Los técnicos en diseño electrónico dan apoyo a los ingenieros electrónicos en el diseño y la conceptualización de equipos electrónicos. Redactan planos y diagramas de montaje de sistemas y componentes electrónicos utilizando programas de dibujo técnico.
Fuente: European Commission, DG EMPL — ESCO API 2026-08-08 (bridge v1.2.1)
Licencia: CC BY 4.0 (EU Reuse Notice)
ESCO reuse terms and the modification notice are in Credits.
Vínculos con la clasificación francesa (ROME)
Vínculos entre esta ocupación y fichas ROME 4.0, establecidos por AI Changing Work con modelos de IA. Las relaciones se leen desde el lado de esta ocupación. Los vínculos marcados como «provisional» se adoptaron basándose únicamente en los juicios de dos evaluadores de la misma familia de modelos (Claude), o mediante una regla del operador aplicada a esos juicios, por lo que se sustentan en evidencia más débil que los vínculos confirmados.
| Código ROME | Denominación ROME (francés) | Relación |
|---|---|---|
| H1202 | Dessinateur / Dessinatrice en électricité-électronique | Esta ocupación es más ampliaprovisional |
| H1228 | Chef de groupe projeteur / Cheffe de groupe projeteuse en électricité-électronique | Esta ocupación es más ampliaprovisional |
| H1236 | Dessinateur-projeteur / Dessinatrice-projeteuse en électricité-électronique | Esta ocupación es más ampliaprovisional |
Source: France Travail — Répertoire Opérationnel des Métiers et des Emplois (ROME 4.0), version 61, last updated 15 June 2026 (https://www.data.gouv.fr/datasets/repertoire-operationnel-des-metiers-et-des-emplois-rome). Licence Ouverte 2.0.
ROME codes and titles are reproduced unchanged; the links to O*NET-SOC occupations are AI Changing Work's own judgment and are not a France Travail correspondence.
(AI Changing Work link release: fr-direct v1)
Vínculos con la clasificación española (CNO-11)
Vínculos entre esta ocupación y ocupaciones CNO-11, establecidos por AI Changing Work con modelos de IA. Las relaciones se leen desde el lado de esta ocupación.
| Código CNO-11 | Denominación CNO-11 (español) | Relación |
|---|---|---|
| 3110 | Delineantes y dibujantes técnicos | Esta ocupación es más estrecha |
Source: Instituto Nacional de Estadística (INE), National Classification of Occupations 2011 (CNO-11, Royal Decree 1591/2010) — www.ine.es · Licensed CC BY 4.0. CNO-11 codes and Spanish titles are reproduced unchanged; the links to O*NET occupations are AI Changing Work's own judgment and are not an INE correspondence.
(AI Changing Work link release: es-direct v1)
Vínculos con la clasificación alemana (KldB)
Vínculos entre esta ocupación y ocupaciones KldB, establecidos por AI Changing Work con modelos de IA. Las relaciones se leen desde el lado de esta ocupación.
| Código KldB | Denominación KldB (alemán) | Relación |
|---|---|---|
| 27212 | Technische Zeichner/innen - fachlich ausgerichtete Tätigkeiten | Esta ocupación es más estrechaprovisional |
| 27223 | Berufe in der Konstruktion und im Gerätebau - komplexe Spezialistentätigkeiten | Relacionada, no equivalenteprovisional |
Source: © Statistik der Bundesagentur für Arbeit — Klassifikation der Berufe 2010 – überarbeitete Fassung 2020, https://statistik.arbeitsagentur.de. KldB codes and titles are reproduced unchanged; the links to O*NET occupations are AI Changing Work's own mapping (eigene Zuordnung) and are not a Bundesagentur für Arbeit correspondence.
(AI Changing Work link release: de-direct v1)
Vínculos con la clasificación japonesa (JSCO)
Vínculos entre esta ocupación y ocupaciones JSCO, establecidos por AI Changing Work con modelos de IA. Las relaciones se leen desde el lado de esta ocupación.
| Código JSCO | Denominación JSCO (japonés) | Relación |
|---|---|---|
| 591 | 生産関連作業従事者 | Esta ocupación es más estrechaprovisional |
| 072 | 電気・電子・電気通信技術者(通信ネットワーク技術者を除く)(開発) | Relacionada, no equivalenteprovisional |
Source: Ministry of Internal Affairs and Communications (MIC), Japan Standard Occupational Classification (Dec. 2009, MIC Notification No. 555). JSCO codes and Japanese titles are reproduced unchanged; the links to O*NET occupations are AI Changing Work's own judgment and are not a MIC correspondence.
(AI Changing Work link release: jp-direct v1)
Fuentes de datos y licencias de esta página, y avisos de modificación y traducción de AI Changing Work: Créditos y fuentes