Electrical and Electronics Drafters
Architecture and Engineering Occupations- Código O*NET-SOC
- 17-3012.00
Prepare wiring diagrams, circuit board assembly diagrams, and layout drawings used for the manufacture, installation, or repair of electrical equipment.
- Fonte dos dados: BLSPublicado: 2026-08
Muito alto· relativa
BaixoQuatro faixas relativasMuito altoValor por grupo ocupacional
Escala, base e fonte
Quatro faixas relativas (Baixo / Moderado / Alto / Muito alto)
831 ocupações detalhadas da tabela de projeções de emprego do BLS. O valor é atribuído por código da National Employment Matrix (NEM), pelo que as ocupações que partilham um código NEM recebem a mesma banda
- Fonte dos dados: AnthropicPublicado: 2026-03
0,089
0,000Intervalo dos valores aqui apresentados0,745Escala, base e fonte
Índice de exposição observada, 0–1 tal como publicado
Mapeado sobre tarefas O*NET
Publicado por ocupação SOC 2018; toda ocupação O*NET com o mesmo código SOC 2018 recebe este valor
- Fonte dos dados: ILOPublicado: 2025
0,35
0,09Intervalo dos valores aqui apresentados0,70Valor por grupo ocupacional
Escala, base e fonte
Índice de exposição à IA generativa, 0–1 tal como publicado
Publicado por grupo de base ISCO-08. Ligado a esta ocupação, total ou parcialmente, aplicando tal como publicadas as tabelas de correspondência do U.S. Bureau of Labor Statistics (ISCO-08 para SOC 2010, SOC 2010 para SOC 2018)
Que tipo de valor esta fonte publica
A categoria de BLS é uma posição relativa, não um nível absoluto, e também não é uma medição de primeira mão: agrupa em quatro faixas as posições percentis da ocupação em vários estudos publicados. Não é uma previsão de emprego ou de salários, não é uma probabilidade de adoção e não distingue automação de aumento.
Task-level exposure
Apenas tarefas expostas30 tarefas avaliadas · 28 tarefas com β ≥ 0,5 (93,3%)
β = exposição direta (E1) + 0,5 × exposição com ferramentas disponíveis (E2), segundo a definição do repositório de origem.
- Unidade de origem: tarefas do O*NET 27.2 → código de ocupação do O*NET 31.0
- Todas as tarefas pontuadas constam da lista de tarefas do O*NET 31.0.
- Fonte
- OpenAI "GPTs are GPTs" exposure rubric
- Versão
- gh-main-0471612
- Licença
- MIT License, Copyright (c) 2024 OpenAI
Tarefas das ocupações O*NET-SOC 2010 17-3012.01 Electronic Drafters; 17-3012.02 Electrical Drafters, que vinculamos a esta ocupação por meio da tabela de correspondência oficial O*NET-SOC 2010 para 2019
| Task (O*NET 20.1) | Claude.aiRaw / share % |
|---|---|
Key and program specified commands and engineering specifications into computer system to change functions and test final layout.17-3012.01 | 0.036637.6 |
Review completed construction drawings and cost estimates for accuracy and conformity to standards and regulations.17-3012.02 | 0.026627.3 |
Review work orders and procedural manuals and confer with vendors and design staff to resolve problems and modify design.17-3012.01 | 0.010811.1 |
Explain drawings to production or construction teams and provide adjustments as necessary.17-3012.02 | 0.00899.1 |
Study work order requests to determine type of service, such as lighting or power, demanded by installation.17-3012.02 | 0.00464.7 |
Prepare and interpret specifications, calculating weights, volumes, and stress factors.17-3012.02 | 0.00292.9 |
Draft detail and assembly drawings of design components, circuitry and printed circuit boards, using computer-assisted equipment or standard drafting techniques and devices.17-3012.01 | 0.00272.8 |
Consult with engineers to discuss and interpret design concepts, and determine requirements of detailed working drawings.17-3012.01 | 0.00232.4 |
Write technical reports and draw charts that display statistics and data.17-3012.02 | 0.00212.1 |
| Not observed on any surface — 21 task(s) — These tasks have no row in the source for this release. The 0 in the share row is a display-stage composition ratio; absence is what the — in the raw row states. | |
Locate files relating to specified design project in database library, load program into computer, and record completed job data. | —0 |
Examine electronic schematics and supporting documents to develop, compute, and verify specifications for drafting data, such as configuration of parts, dimensions, and tolerances. | —0 |
Supervise and coordinate work activities of workers engaged in drafting, designing layouts, assembling, and testing printed circuit boards. | —0 |
Compare logic element configuration on display screen with engineering schematics and calculate figures to convert, redesign, and modify element. | —0 |
Review blueprints to determine customer requirements and consult with assembler regarding schematics, wiring procedures, and conductor paths. | —0 |
Train students to use drafting machines and to prepare schematic diagrams, block diagrams, control drawings, logic diagrams, integrated circuit drawings, and interconnection diagrams. | —0 |
Generate computer tapes of final layout design to produce layered photo masks and photo plotting design onto film. | —0 |
Select drill size to drill test head, according to test design and specifications, and submit guide layout to designated department. | —0 |
Copy drawings of printed circuit board fabrication using print machine or blueprinting procedure. | —0 |
Plot electrical test points on layout sheets and draw schematics for wiring test fixture heads to frames. | —0 |
Use computer-aided drafting equipment or conventional drafting stations, technical handbooks, tables, calculators, and traditional drafting tools, such as boards, pencils, protractors, and T-squares. | —0 |
Confer with engineering staff and other personnel to resolve problems. | —0 |
Draft working drawings, wiring diagrams, wiring connection specifications or cross-sections of underground cables, as required for instructions to installation crew. | —0 |
Draw master sketches to scale showing relation of proposed installations to existing facilities and exact specifications and dimensions. | —0 |
Measure factors that affect installation and arrangement of equipment, such as distances to be spanned by wire and cable. | —0 |
Assemble documentation packages and produce drawing sets which are checked by an engineer or an architect. | —0 |
Reproduce working drawings on copy machines or trace drawings in ink. | —0 |
Design electrical systems, such as lighting systems. | —0 |
Supervise and train other technologists, technicians and drafters. | —0 |
Visit proposed installation sites and draw rough sketches of location. | —0 |
Determine the order of work and the method of presentation, such as orthographic or isometric drawing. | —0 |
Values in this tab are predicted labels, not observations. Eloundou et al. (2023) published two rating regimes — human raters and GPT-4 — and the β shown here is derived from the GPT-4 rater basis alone; the same task can take a different value under the other regime. The unit and the meaning differ from the observed shares (%) in the other tabs, so do not place them on the same axis.
| Task (O*NET 27.2) | βE1 + 0.5 × E2 |
|---|---|
Confer with engineering staff and other personnel to resolve problems.O*NET Task ID 21950 | 1.0 |
Study work order requests to determine type of service, such as lighting or power, demanded by installation.O*NET Task ID 21956 | 1.0 |
Key and program specified commands and engineering specifications into computer system to change functions and test final layout.O*NET Task ID 21961 | 1.0 |
Determine the order of work and the method of presentation, such as orthographic or isometric drawing.O*NET Task ID 21964 | 1.0 |
Write technical reports and draw charts that display statistics and data.O*NET Task ID 21969 | 1.0 |
Prepare and interpret specifications, calculating weights, volumes, or stress factors.O*NET Task ID 21972 | 1.0 |
Use computer-aided drafting equipment or conventional drafting stations, technical handbooks, tables, calculators, or traditional drafting tools, such as boards, pencils, protractors, or T-squares.O*NET Task ID 21974 | 1.0 |
Draft working drawings, wiring diagrams, wiring connection specifications, or cross-sections of underground cables, as required for instructions to installation crew.O*NET Task ID 21945 | 0.5 |
Assemble documentation packages and produce drawing sets to be checked by an engineer or an architect.O*NET Task ID 21946 | 0.5 |
Consult with engineers to discuss or interpret design concepts, or determine requirements of detailed working drawings.O*NET Task ID 21947 | 0.5 |
Review completed construction drawings and cost estimates for accuracy and conformity to standards and regulations.O*NET Task ID 21948 | 0.5 |
Examine electronic schematics and supporting documents to develop, compute, and verify specifications for drafting data, such as configuration of parts, dimensions, or tolerances.O*NET Task ID 21949 | 0.5 |
Draft detail and assembly drawings of design components, circuitry or printed circuit boards, using computer-assisted equipment or standard drafting techniques and devices.O*NET Task ID 21951 | 0.5 |
Measure factors that affect installation and arrangement of equipment, such as distances to be spanned by wire and cable.O*NET Task ID 21952 | 0.5 |
Locate files relating to specified design project in database library, load program into computer, and record completed job data.O*NET Task ID 21953 | 0.5 |
Design electrical systems, such as lighting systems.O*NET Task ID 21954 | 0.5 |
Draw master sketches to scale showing relation of proposed installations to existing facilities and exact specifications and dimensions.O*NET Task ID 21955 | 0.5 |
Explain drawings to production or construction teams and provide adjustments, as necessary.O*NET Task ID 21957 | 0.5 |
Review work orders or procedural manuals and confer with vendors or design staff to resolve problems or modify design.O*NET Task ID 21958 | 0.5 |
Reproduce working drawings on copy machines or trace drawings in ink.O*NET Task ID 21959 | 0.5 |
Generate computer tapes of final layout design to produce layered photo masks or photo plotting design onto film.O*NET Task ID 21960 | 0.5 |
Supervise and coordinate work activities of workers engaged in drafting, designing layouts, assembling, or testing printed circuit boards.O*NET Task ID 21962 | 0.5 |
Compare logic element configuration on display screen with engineering schematics and calculate figures to convert, redesign, or modify element.O*NET Task ID 21963 | 0.5 |
Review blueprints to determine customer requirements and consult with assembler regarding schematics, wiring procedures, or conductor paths.O*NET Task ID 21965 | 0.5 |
Visit proposed installation sites and draw rough sketches of location.O*NET Task ID 21966 | 0.5 |
Plot electrical test points on layout sheets and draw schematics for wiring test fixture heads to frames.O*NET Task ID 21968 | 0.5 |
Copy drawings of printed circuit board fabrication using print machine or blueprinting procedure.O*NET Task ID 21970 | 0.5 |
Train students to use drafting machines and to prepare schematic diagrams, block diagrams, control drawings, logic diagrams, integrated circuit drawings, or interconnection diagrams.O*NET Task ID 21971 | 0.5 |
Select drill size to drill test head, according to test design and specifications, and submit guide layout to designated department.O*NET Task ID 21967 | 0.0 |
Supervise or train other technologists, technicians, or drafters.O*NET Task ID 21973 | 0.0 |
β = E1 + 0.5 × E2 · E1 = tasks where direct LLM access alone cuts time by at least 50%, E2 = tasks where software built on top of an LLM cuts time by at least 50%. Values take only 0 / 0.5 / 1.0.
Data sources & licenses — O*NET®, Anthropic Economic Index, Eloundou et al. (2023): see full notices on the Credits page
Todas as tarefas do O*NET 31.0 (30)
Todas as tarefas do O*NET 31.0 desta ocupação (em inglês, como publicadas; tipo de tarefa principal ou complementar). Os valores de exposição não constam desta lista; estão na tabela acima, ao lado de cada tarefa na redação da versão do O*NET usada por cada fonte.
| Tarefa (O*NET 31.0) | Tipo |
|---|---|
| Draft working drawings, wiring diagrams, wiring connection specifications, or cross-sections of underground cables, as required for instructions to installation crew. | Principal |
| Assemble documentation packages and produce drawing sets to be checked by an engineer or an architect. | Principal |
| Consult with engineers to discuss or interpret design concepts, or determine requirements of detailed working drawings. | Principal |
| Review completed construction drawings and cost estimates for accuracy and conformity to standards and regulations. | Principal |
| Examine electronic schematics and supporting documents to develop, compute, and verify specifications for drafting data, such as configuration of parts, dimensions, or tolerances. | Principal |
| Confer with engineering staff and other personnel to resolve problems. | Principal |
| Draft detail and assembly drawings of design components, circuitry or printed circuit boards, using computer-assisted equipment or standard drafting techniques and devices. | Principal |
| Measure factors that affect installation and arrangement of equipment, such as distances to be spanned by wire and cable. | Principal |
| Locate files relating to specified design project in database library, load program into computer, and record completed job data. | Principal |
| Design electrical systems, such as lighting systems. | Principal |
| Draw master sketches to scale showing relation of proposed installations to existing facilities and exact specifications and dimensions. | Principal |
| Study work order requests to determine type of service, such as lighting or power, demanded by installation. | Principal |
| Explain drawings to production or construction teams and provide adjustments, as necessary. | Principal |
| Review work orders or procedural manuals and confer with vendors or design staff to resolve problems or modify design. | Principal |
| Reproduce working drawings on copy machines or trace drawings in ink. | Principal |
| Compare logic element configuration on display screen with engineering schematics and calculate figures to convert, redesign, or modify element. | Principal |
| Review blueprints to determine customer requirements and consult with assembler regarding schematics, wiring procedures, or conductor paths. | Principal |
| Generate computer tapes of final layout design to produce layered photo masks or photo plotting design onto film. | Complementar |
| Key and program specified commands and engineering specifications into computer system to change functions and test final layout. | Complementar |
| Supervise and coordinate work activities of workers engaged in drafting, designing layouts, assembling, or testing printed circuit boards. | Complementar |
| Determine the order of work and the method of presentation, such as orthographic or isometric drawing. | Complementar |
| Visit proposed installation sites and draw rough sketches of location. | Complementar |
| Select drill size to drill test head, according to test design and specifications, and submit guide layout to designated department. | Complementar |
| Plot electrical test points on layout sheets and draw schematics for wiring test fixture heads to frames. | Complementar |
| Write technical reports and draw charts that display statistics and data. | Complementar |
| Copy drawings of printed circuit board fabrication using print machine or blueprinting procedure. | Complementar |
| Train students to use drafting machines and to prepare schematic diagrams, block diagrams, control drawings, logic diagrams, integrated circuit drawings, or interconnection diagrams. | Complementar |
| Prepare and interpret specifications, calculating weights, volumes, or stress factors. | — |
| Supervise or train other technologists, technicians, or drafters. | — |
| Use computer-aided drafting equipment or conventional drafting stations, technical handbooks, tables, calculators, or traditional drafting tools, such as boards, pencils, protractors, or T-squares. | — |
0,04/ 3· Índice de exposição a robôs
Escala, base e fonte
Cada tarefa física recebe uma nota de 0 a 3 conforme o ambiente em que robôs já implantados, vendidos ou demonstrados poderiam realizá-la (0 nenhum · 1 ambientes feitos para robôs, como uma célula de máquinas cercada ou uma linha de engarrafamento · 2 instalações estruturadas, como uma farmácia hospitalar ou um porto de contêineres · 3 ambientes não estruturados, como uma residência particular ou um canteiro de obras), e as notas são promediadas pela parcela do tempo de trabalho
Tarefas físicas entre as tarefas O*NET 29.3 desta ocupação
A Anthropic estimou as notas e as parcelas de tempo com o Claude Opus 5 usando pesquisa na web (situação em 2026).
O índice de exposição a robôs é uma medida diferente dos números de exposição à IA deste site e não pode ser somado a eles nem comparado com eles. Não mede a adoção real nem o custo, e 0 também abrange ocupações sem tarefas físicas.
Nota de cada tarefa física
Níveis de ambiente robótico (E0–E3)
E0 nenhumDetalhes
Avaliada como não realizável por robôs que foram implantados, vendidos ou demonstrados, nem mesmo em um ambiente feito para robôs
E1 ambientes feitos para robôsDetalhes
Avaliada como realizável em um ambiente construído em torno da máquina, como uma célula de máquinas cercada ou uma linha de engarrafamento
E2 instalações estruturadasDetalhes
Avaliada como realizável em uma instalação de trabalho de pessoas que uma instituição mantém em um padrão de trabalho, como uma farmácia hospitalar ou um porto de contêineres
E3 ambientes não estruturadosDetalhes
Avaliada como realizável em um ambiente que nenhuma instituição mantém em um padrão de trabalho, como uma residência particular ou um canteiro de obras
Apenas as tarefas classificadas como físicas são listadas; as demais tarefas não têm nível na fonte.
| Tarefa (O*NET 29.3) | Nível de ambiente robótico |
|---|---|
| Reproduce working drawings on copy machines or trace drawings in ink. | E1 ambientes feitos para robôs |
| Visit proposed installation sites and draw rough sketches of location. | E2 instalações estruturadas |
| Copy drawings of printed circuit board fabrication using print machine or blueprinting procedure. | E2 instalações estruturadas |
Informação ocupacional
Perspetivas de emprego (BLS)
- Emprego, 2025
- 19K
- Emprego projetado, 2035
- 18K
- Variação (2025–35)
- -3,4%
- Salário anual mediano, 2025
- $76.870
- Escolaridade habitual para ingresso
- Associate's degree
Ligações à classificação coreana (KSCO)
Ligações da versão atual de Korea Occupation Direct Crosswalk v1.1, elaborado pela AI Changing Work. Os valores de relação são lidos a partir da ocupação O*NET-SOC.
| Código KSCO | Nome KSCO | Relação | Estado |
|---|---|---|---|
| 23954 | 전기 및 전자 장비 제도사 | Mesmo âmbito | confirmado |
Definições de relação e estado(kr-direct v1.1)
Descrição ocupacional da OIT
A AI Changing Work vincula a esta ocupação os grupos de base da ISCO-08 abaixo aplicando, tal como publicadas, as tabelas de correspondência do Bureau of Labor Statistics dos EUA (BLS) (SOC 2018 para SOC 2010, SOC 2010 para ISCO-08), sem seleção caso a caso; cada vínculo pode ser total ou parcial.
- ISCO-08 3118Draughtspersons
Desenhadores
Fonte: European Commission, DG EMPL — ESCO API 2026-08-08 (bridge v1.2.1)
Licença: CC BY 4.0 (EU Reuse Notice)
Sources: ILO ISCO-08 — details: Credits
Vocabulário ocupacional ESCO
Cada entrada abaixo está associada a esta ocupação no ESCO-O*NET Crosswalk publicado (versão 1, 2022). Os tipos de correspondência são os dessa tabela; a redação é da AI Changing Work.
- ProjetistaESCO 3118.3Esta ocupação é mais restrita
Os projetistas preparam e criam desenhos técnicos utilizando um software especial ou técnicas manuais para mostrar como algo é construído ou como funciona.
- Projetista de eletrónicaESCO 3118.3.8Esta ocupação é mais ampla
Os projetistas de eletrónica prestam apoio aos engenheiros eletrónicos na conceção e conceptualização de equipamentos eletrónicos. Elaboram planos técnicos e diagramas de montagem de sistemas e componentes eletrónicos utilizando software de desenho técnico.
- Projetista de equipamento elétricoESCO 3118.3.6Esta ocupação é mais ampla
Os projetistas de equipamento elétrico prestam apoio aos engenheiros na conceção e conceptualização de equipamento elétrico. Elaboram, com o apoio de software especializado, as especificações de um número variado de sistemas elétricos, como transformadores de tensão e centrais elétricas, ou do fornecimento de energia em edifícios.
- Projetista eletromecânico/Projetista eletromecânicaESCO 3118.3.7Esta ocupação é mais ampla
Os projetistas eletromecânicos desenham e criam planos técnicos em conjunto com engenheiros eletromecânicos. Interpretam as especificações e os requisitos do engenheiro e desenham equipamentos e componentes eletromecânicos.
Fonte: European Commission, DG EMPL — ESCO API 2026-08-08 (bridge v1.2.1)
Licença: CC BY 4.0 (EU Reuse Notice)
ESCO reuse terms and the modification notice are in Credits.
Ligações à classificação francesa (ROME)
Ligações entre esta ocupação e fichas ROME 4.0, estabelecidas pela AI Changing Work com modelos de IA. As relações leem-se do lado desta ocupação. As ligações marcadas como «provisório» foram adotadas apenas com base nos julgamentos de dois avaliadores da mesma família de modelos (Claude), ou por uma regra do operador aplicada a esses julgamentos, pelo que se apoiam em evidências mais fracas do que as ligações confirmadas.
| Código ROME | Designação ROME (francês) | Relação |
|---|---|---|
| H1202 | Dessinateur / Dessinatrice en électricité-électronique | Esta ocupação é mais amplaprovisório |
| H1228 | Chef de groupe projeteur / Cheffe de groupe projeteuse en électricité-électronique | Esta ocupação é mais amplaprovisório |
| H1236 | Dessinateur-projeteur / Dessinatrice-projeteuse en électricité-électronique | Esta ocupação é mais amplaprovisório |
Source: France Travail — Répertoire Opérationnel des Métiers et des Emplois (ROME 4.0), version 61, last updated 15 June 2026 (https://www.data.gouv.fr/datasets/repertoire-operationnel-des-metiers-et-des-emplois-rome). Licence Ouverte 2.0.
ROME codes and titles are reproduced unchanged; the links to O*NET-SOC occupations are AI Changing Work's own judgment and are not a France Travail correspondence.
(AI Changing Work link release: fr-direct v1)
Ligações à classificação espanhola (CNO-11)
Ligações entre esta ocupação e ocupações CNO-11, estabelecidas pela AI Changing Work com modelos de IA. As relações leem-se do lado desta ocupação.
| Código CNO-11 | Designação CNO-11 (espanhol) | Relação |
|---|---|---|
| 3110 | Delineantes y dibujantes técnicos | Esta ocupação é mais restrita |
Source: Instituto Nacional de Estadística (INE), National Classification of Occupations 2011 (CNO-11, Royal Decree 1591/2010) — www.ine.es · Licensed CC BY 4.0. CNO-11 codes and Spanish titles are reproduced unchanged; the links to O*NET occupations are AI Changing Work's own judgment and are not an INE correspondence.
(AI Changing Work link release: es-direct v1)
Ligações à classificação alemã (KldB)
Ligações entre esta ocupação e ocupações KldB, estabelecidas pela AI Changing Work com modelos de IA. As relações leem-se do lado desta ocupação.
| Código KldB | Designação KldB (alemão) | Relação |
|---|---|---|
| 27212 | Technische Zeichner/innen - fachlich ausgerichtete Tätigkeiten | Esta ocupação é mais restritaprovisório |
| 27223 | Berufe in der Konstruktion und im Gerätebau - komplexe Spezialistentätigkeiten | Relacionada, não correspondenteprovisório |
Source: © Statistik der Bundesagentur für Arbeit — Klassifikation der Berufe 2010 – überarbeitete Fassung 2020, https://statistik.arbeitsagentur.de. KldB codes and titles are reproduced unchanged; the links to O*NET occupations are AI Changing Work's own mapping (eigene Zuordnung) and are not a Bundesagentur für Arbeit correspondence.
(AI Changing Work link release: de-direct v1)
Ligações à classificação japonesa (JSCO)
Ligações entre esta ocupação e ocupações JSCO, estabelecidas pela AI Changing Work com modelos de IA. As relações leem-se do lado desta ocupação.
| Código JSCO | Designação JSCO (japonês) | Relação |
|---|---|---|
| 591 | 生産関連作業従事者 | Esta ocupação é mais restritaprovisório |
| 072 | 電気・電子・電気通信技術者(通信ネットワーク技術者を除く)(開発) | Relacionada, não correspondenteprovisório |
Source: Ministry of Internal Affairs and Communications (MIC), Japan Standard Occupational Classification (Dec. 2009, MIC Notification No. 555). JSCO codes and Japanese titles are reproduced unchanged; the links to O*NET occupations are AI Changing Work's own judgment and are not a MIC correspondence.
(AI Changing Work link release: jp-direct v1)
Fontes de dados e licenças desta página, e avisos de modificação e tradução da AI Changing Work: Créditos e fontes