Solar Photovoltaic Installers
Construction and Extraction Occupations- Código O*NET-SOC
- 47-2231.00
Assemble, install, or maintain solar photovoltaic (PV) systems on roofs or other structures in compliance with site assessment and schematics. May include measuring, cutting, assembling, and bolting structural framing and solar modules. May perform minor electrical work such as current checks.
- Fonte dos dados: BLSPublicado: 2026-08
Moderado· relativa
BaixoQuatro faixas relativasMuito altoValor por grupo ocupacional
Escala, base e fonte
Quatro faixas relativas (Baixo / Moderado / Alto / Muito alto)
831 ocupações detalhadas da tabela de projeções de emprego do BLS. O valor é atribuído por código da National Employment Matrix (NEM), pelo que as ocupações que partilham um código NEM recebem a mesma banda
- Fonte dos dados: AnthropicPublicado: 2026-03
0,000
0,000Intervalo dos valores aqui apresentados0,745Escala, base e fonte
Índice de exposição observada, 0–1 tal como publicado
Mapeado sobre tarefas O*NET
Publicado por ocupação SOC 2018; toda ocupação O*NET com o mesmo código SOC 2018 recebe este valor
- Fonte dos dados: ILOPublicado: 2025
0,09–0,19· 2 grupos ISCO-08
Escala, base e fonte
Índice de exposição à IA generativa, 0–1 tal como publicado
Publicado por grupo de base ISCO-08. Ligado a esta ocupação, total ou parcialmente, aplicando tal como publicadas as tabelas de correspondência do U.S. Bureau of Labor Statistics (ISCO-08 para SOC 2010, SOC 2010 para SOC 2018)
Que tipo de valor esta fonte publica
A categoria de BLS é uma posição relativa, não um nível absoluto, e também não é uma medição de primeira mão: agrupa em quatro faixas as posições percentis da ocupação em vários estudos publicados. Não é uma previsão de emprego ou de salários, não é uma probabilidade de adoção e não distingue automação de aumento.
Valor ILO de cada grupo ISCO-08 ligado
- ISCO-08 7119Building Frame and Related Trades Workers Not Elsewhere Classified0,09
- ISCO-08 7411Building and Related Electricians0,19
Task-level exposure
Apenas tarefas expostas26 tarefas avaliadas · 6 tarefas com β ≥ 0,5 (23,1%)
β = exposição direta (E1) + 0,5 × exposição com ferramentas disponíveis (E2), segundo a definição do repositório de origem.
- Unidade de origem: tarefas do O*NET 27.2 → código de ocupação do O*NET 31.0
- Todas as tarefas pontuadas constam da lista de tarefas do O*NET 31.0.
- Fonte
- OpenAI "GPTs are GPTs" exposure rubric
- Versão
- gh-main-0471612
- Licença
- MIT License, Copyright (c) 2024 OpenAI
| Task (O*NET 20.1) | Claude.aiRaw / share % |
|---|---|
Identify installation locations with proper orientation, area, solar access, or structural integrity for photovoltaic (PV) arrays.47-2231.00 | 0.004323.0 |
Check electrical installation for proper wiring, polarity, grounding, or integrity of terminations.47-2231.00 | 0.003518.6 |
Determine connection interfaces for additional subpanels or for connecting photovoltaic (PV) systems with utility services or other power generation sources.47-2231.00 | 0.003418.0 |
Determine appropriate sizes, ratings, and locations for all system overcurrent devices, disconnect devices, grounding equipment, and surge suppression equipment.47-2231.00 | 0.003015.8 |
Measure and analyze system performance and operating parameters to assess operating condition of systems or equipment.47-2231.00 | 0.002613.7 |
Determine materials, equipment, and installation sequences necessary to maximize installation efficiency.47-2231.00 | 0.002110.9 |
| Not observed on any surface — 20 task(s) — These tasks have no row in the source for this release. The 0 in the share row is a display-stage composition ratio; absence is what the — in the raw row states. | |
Assemble solar modules, panels, or support structures, as specified. | —0 |
Install active solar systems, including solar collectors, concentrators, pumps, or fans. | —0 |
Install photovoltaic (PV) systems in accordance with codes and standards using drawings, schematics, and instructions. | —0 |
Perform routine photovoltaic (PV) system maintenance on modules, arrays, batteries, power conditioning equipment, safety systems, structural systems, weather sealing, or balance of systems equipment. | —0 |
Activate photovoltaic (PV) systems to verify system functionality and conformity to performance expectations. | —0 |
Apply weather sealing to array, building, or support mechanisms. | —0 |
Determine photovoltaic (PV) system designs or configurations based on factors such as customer needs, expectations, and site conditions. | —0 |
Examine designs to determine current requirements for all parts of the photovoltaic (PV) system electrical circuit. | —0 |
Identify and resolve any deficiencies in photovoltaic (PV) system installation or materials. | —0 |
Identify electrical, environmental, and safety hazards associated with photovoltaic (PV) installations. | —0 |
Identify methods for laying out, orienting, and mounting modules or arrays to ensure efficient installation, electrical configuration, or system maintenance. | —0 |
Install module array interconnect wiring, implementing measures to disable arrays during installation. | —0 |
Install required labels on solar system components and hardware. | —0 |
Program, adjust, or configure inverters and controls for desired set points and operating modes. | —0 |
Test operating voltages to ensure operation within acceptable limits for power conditioning equipment, such as inverters and controllers. | —0 |
Visually inspect and test photovoltaic (PV) modules or systems. | —0 |
Compile or maintain records of system operation, performance, and maintenance. | —0 |
Demonstrate system functionality and performance, including start-up, shut-down, normal operation, and emergency or bypass operations. | —0 |
Diagram layouts and locations for photovoltaic (PV) arrays and equipment, including existing building or site features. | —0 |
Select mechanical designs, installation equipment, or installation plans that conform to environmental, architectural, structural, site, and code requirements. | —0 |
Values in this tab are predicted labels, not observations. Eloundou et al. (2023) published two rating regimes — human raters and GPT-4 — and the β shown here is derived from the GPT-4 rater basis alone; the same task can take a different value under the other regime. The unit and the meaning differ from the observed shares (%) in the other tabs, so do not place them on the same axis.
| Task (O*NET 27.2) | βE1 + 0.5 × E2 |
|---|---|
Determine photovoltaic (PV) system designs or configurations based on factors such as customer needs, expectations, and site conditions.O*NET Task ID 17749 | 0.5 |
Diagram layouts and locations for photovoltaic (PV) arrays and equipment, including existing building or site features.O*NET Task ID 17750 | 0.5 |
Identify installation locations with proper orientation, area, solar access, or structural integrity for photovoltaic (PV) arrays.O*NET Task ID 17754 | 0.5 |
Visually inspect and test photovoltaic (PV) modules or systems.O*NET Task ID 17762 | 0.5 |
Compile or maintain records of system operation, performance, and maintenance.O*NET Task ID 17763 | 0.5 |
Determine materials, equipment, and installation sequences necessary to maximize installation efficiency.O*NET Task ID 17765 | 0.5 |
Assemble solar modules, panels, or support structures, as specified.O*NET Task ID 17740 | 0.0 |
Install active solar systems, including solar collectors, concentrators, pumps, or fans.O*NET Task ID 17741 | 0.0 |
Install photovoltaic (PV) systems in accordance with codes and standards, using drawings, schematics, and instructions.O*NET Task ID 17742 | 0.0 |
Perform routine photovoltaic (PV) system maintenance on modules, arrays, batteries, power conditioning equipment, safety systems, structural systems, weather sealing, or balance of systems equipment.O*NET Task ID 17743 | 0.0 |
Activate photovoltaic (PV) systems to verify system functionality and conformity to performance expectations.O*NET Task ID 17744 | 0.0 |
Apply weather sealing to array, building, or support mechanisms.O*NET Task ID 17745 | 0.0 |
Check electrical installation for proper wiring, polarity, grounding, or integrity of terminations.O*NET Task ID 17746 | 0.0 |
Determine appropriate sizes, ratings, and locations for all system overcurrent devices, disconnect devices, grounding equipment, and surge suppression equipment.O*NET Task ID 17747 | 0.0 |
Determine connection interfaces for additional subpanels or for connecting photovoltaic (PV) systems with utility services or other power generation sources.O*NET Task ID 17748 | 0.0 |
Examine designs to determine current requirements for all parts of the photovoltaic (PV) system electrical circuit.O*NET Task ID 17751 | 0.0 |
Identify and resolve any deficiencies in photovoltaic (PV) system installation or materials.O*NET Task ID 17752 | 0.0 |
Identify electrical, environmental, and safety hazards associated with photovoltaic (PV) installations.O*NET Task ID 17753 | 0.0 |
Identify methods for laying out, orienting, and mounting modules or arrays to ensure efficient installation, electrical configuration, or system maintenance.O*NET Task ID 17755 | 0.0 |
Install module array interconnect wiring, implementing measures to disable arrays during installation.O*NET Task ID 17756 | 0.0 |
Install required labels on solar system components and hardware.O*NET Task ID 17757 | 0.0 |
Measure and analyze system performance and operating parameters to assess operating condition of systems or equipment.O*NET Task ID 17758 | 0.0 |
Program, adjust, or configure inverters and controls for desired set points and operating modes.O*NET Task ID 17759 | 0.0 |
Select mechanical designs, installation equipment, or installation plans that conform to environmental, architectural, structural, site, and code requirements.O*NET Task ID 17760 | 0.0 |
Test operating voltages to ensure operation within acceptable limits for power conditioning equipment, such as inverters and controllers.O*NET Task ID 17761 | 0.0 |
Demonstrate system functionality and performance, including start-up, shut-down, normal operation, and emergency or bypass operations.O*NET Task ID 17764 | 0.0 |
β = E1 + 0.5 × E2 · E1 = tasks where direct LLM access alone cuts time by at least 50%, E2 = tasks where software built on top of an LLM cuts time by at least 50%. Values take only 0 / 0.5 / 1.0.
Data sources & licenses — O*NET®, Anthropic Economic Index, Eloundou et al. (2023): see full notices on the Credits page
Todas as tarefas do O*NET 31.0 (26)
Todas as tarefas do O*NET 31.0 desta ocupação (em inglês, como publicadas; tipo de tarefa principal ou complementar). Os valores de exposição não constam desta lista; estão na tabela acima, ao lado de cada tarefa na redação da versão do O*NET usada por cada fonte.
| Tarefa (O*NET 31.0) | Tipo |
|---|---|
| Assemble solar modules, panels, or support structures, as specified. | Principal |
| Install photovoltaic (PV) systems in accordance with codes and standards, using drawings, schematics, and instructions. | Principal |
| Perform routine photovoltaic (PV) system maintenance on modules, arrays, batteries, power conditioning equipment, safety systems, structural systems, weather sealing, or balance of systems equipment. | Principal |
| Activate photovoltaic (PV) systems to verify system functionality and conformity to performance expectations. | Principal |
| Apply weather sealing to array, building, or support mechanisms. | Principal |
| Check electrical installation for proper wiring, polarity, grounding, or integrity of terminations. | Principal |
| Determine appropriate sizes, ratings, and locations for all system overcurrent devices, disconnect devices, grounding equipment, and surge suppression equipment. | Principal |
| Determine connection interfaces for additional subpanels or for connecting photovoltaic (PV) systems with utility services or other power generation sources. | Principal |
| Determine photovoltaic (PV) system designs or configurations based on factors such as customer needs, expectations, and site conditions. | Principal |
| Diagram layouts and locations for photovoltaic (PV) arrays and equipment, including existing building or site features. | Principal |
| Examine designs to determine current requirements for all parts of the photovoltaic (PV) system electrical circuit. | Principal |
| Identify and resolve any deficiencies in photovoltaic (PV) system installation or materials. | Principal |
| Identify electrical, environmental, and safety hazards associated with photovoltaic (PV) installations. | Principal |
| Identify installation locations with proper orientation, area, solar access, or structural integrity for photovoltaic (PV) arrays. | Principal |
| Identify methods for laying out, orienting, and mounting modules or arrays to ensure efficient installation, electrical configuration, or system maintenance. | Principal |
| Install module array interconnect wiring, implementing measures to disable arrays during installation. | Principal |
| Install required labels on solar system components and hardware. | Principal |
| Measure and analyze system performance and operating parameters to assess operating condition of systems or equipment. | Principal |
| Program, adjust, or configure inverters and controls for desired set points and operating modes. | Principal |
| Select mechanical designs, installation equipment, or installation plans that conform to environmental, architectural, structural, site, and code requirements. | Principal |
| Test operating voltages to ensure operation within acceptable limits for power conditioning equipment, such as inverters and controllers. | Principal |
| Visually inspect and test photovoltaic (PV) modules or systems. | Principal |
| Compile or maintain records of system operation, performance, and maintenance. | Principal |
| Demonstrate system functionality and performance, including start-up, shut-down, normal operation, and emergency or bypass operations. | Principal |
| Determine materials, equipment, and installation sequences necessary to maximize installation efficiency. | Principal |
| Install active solar systems, including solar collectors, concentrators, pumps, or fans. | Complementar |
0,53/ 3· Índice de exposição a robôs
Escala, base e fonte
Cada tarefa física recebe uma nota de 0 a 3 conforme o ambiente em que robôs já implantados, vendidos ou demonstrados poderiam realizá-la (0 nenhum · 1 ambientes feitos para robôs, como uma célula de máquinas cercada ou uma linha de engarrafamento · 2 instalações estruturadas, como uma farmácia hospitalar ou um porto de contêineres · 3 ambientes não estruturados, como uma residência particular ou um canteiro de obras), e as notas são promediadas pela parcela do tempo de trabalho
Tarefas físicas entre as tarefas O*NET 29.3 desta ocupação
A Anthropic estimou as notas e as parcelas de tempo com o Claude Opus 5 usando pesquisa na web (situação em 2026).
O índice de exposição a robôs é uma medida diferente dos números de exposição à IA deste site e não pode ser somado a eles nem comparado com eles. Não mede a adoção real nem o custo, e 0 também abrange ocupações sem tarefas físicas.
Nota de cada tarefa física
Níveis de ambiente robótico (E0–E3)
E0 nenhumDetalhes
Avaliada como não realizável por robôs que foram implantados, vendidos ou demonstrados, nem mesmo em um ambiente feito para robôs
E1 ambientes feitos para robôsDetalhes
Avaliada como realizável em um ambiente construído em torno da máquina, como uma célula de máquinas cercada ou uma linha de engarrafamento
E2 instalações estruturadasDetalhes
Avaliada como realizável em uma instalação de trabalho de pessoas que uma instituição mantém em um padrão de trabalho, como uma farmácia hospitalar ou um porto de contêineres
E3 ambientes não estruturadosDetalhes
Avaliada como realizável em um ambiente que nenhuma instituição mantém em um padrão de trabalho, como uma residência particular ou um canteiro de obras
Apenas as tarefas classificadas como físicas são listadas; as demais tarefas não têm nível na fonte.
| Tarefa (O*NET 29.3) | Nível de ambiente robótico |
|---|---|
| Assemble solar modules, panels, or support structures, as specified. | E1 ambientes feitos para robôs |
| Install photovoltaic (PV) systems in accordance with codes and standards, using drawings, schematics, and instructions. | E0 nenhum |
| Perform routine photovoltaic (PV) system maintenance on modules, arrays, batteries, power conditioning equipment, safety systems, structural systems, weather sealing, or balance of systems equipment. | E0 nenhum |
| Activate photovoltaic (PV) systems to verify system functionality and conformity to performance expectations. | E1 ambientes feitos para robôs |
| Apply weather sealing to array, building, or support mechanisms. | E0 nenhum |
| Check electrical installation for proper wiring, polarity, grounding, or integrity of terminations. | E1 ambientes feitos para robôs |
| Identify and resolve any deficiencies in photovoltaic (PV) system installation or materials. | E0 nenhum |
| Identify installation locations with proper orientation, area, solar access, or structural integrity for photovoltaic (PV) arrays. | E3 ambientes não estruturados |
| Install module array interconnect wiring, implementing measures to disable arrays during installation. | E1 ambientes feitos para robôs |
| Install required labels on solar system components and hardware. | E1 ambientes feitos para robôs |
| Measure and analyze system performance and operating parameters to assess operating condition of systems or equipment. | E1 ambientes feitos para robôs |
| Test operating voltages to ensure operation within acceptable limits for power conditioning equipment, such as inverters and controllers. | E1 ambientes feitos para robôs |
| Visually inspect and test photovoltaic (PV) modules or systems. | E1 ambientes feitos para robôs |
| Demonstrate system functionality and performance, including start-up, shut-down, normal operation, and emergency or bypass operations. | E1 ambientes feitos para robôs |
| Install active solar systems, including solar collectors, concentrators, pumps, or fans. | E1 ambientes feitos para robôs |
Informação ocupacional
Perspetivas de emprego (BLS)
- Emprego, 2025
- 31K
- Emprego projetado, 2035
- 42K
- Variação (2025–35)
- +36,5%
- Salário anual mediano, 2025
- $53.140
- Escolaridade habitual para ingresso
- High school diploma or equivalent
Ligações à classificação coreana (KSCO)
Ligações da versão atual de Korea Occupation Direct Crosswalk v1.1, elaborado pela AI Changing Work. Os valores de relação são lidos a partir da ocupação O*NET-SOC.
| Código KSCO | Nome KSCO | Relação | Estado |
|---|---|---|---|
| 76225 | 전기기기 설치 및 정비원 | Esta ocupação é mais restrita | confirmado |
| 23750 | 신재생에너지 시험원 | Relacionada, não correspondente | confirmado |
Definições de relação e estado(kr-direct v1.1)
Descrição ocupacional da OIT
A AI Changing Work vincula a esta ocupação os grupos de base da ISCO-08 abaixo aplicando, tal como publicadas, as tabelas de correspondência do Bureau of Labor Statistics dos EUA (BLS) (SOC 2018 para SOC 2010, SOC 2010 para ISCO-08), sem seleção caso a caso; cada vínculo pode ser total ou parcial.
- ISCO-08 7119Building Frame and Related Trades Workers Not Elsewhere Classified
Outros trabalhadores qualificados da construção das estruturas básicas e similares
- ISCO-08 7411Building and Related Electricians
Electricistas da construção e similares
Fonte: European Commission, DG EMPL — ESCO API 2026-08-08 (bridge v1.2.1)
Licença: CC BY 4.0 (EU Reuse Notice)
Fonte: European Commission, DG EMPL — ESCO API 2026-08-08 (bridge v1.2.1)
Licença: CC BY 4.0 (EU Reuse Notice)
Sources: ILO ISCO-08 — details: Credits
Vocabulário ocupacional ESCO
Cada entrada abaixo está associada a esta ocupação no ESCO-O*NET Crosswalk publicado (versão 1, 2022). Os tipos de correspondência são os dessa tabela; a redação é da AI Changing Work.
- Técnico de energia solar/Técnica de energia solarESCO 7411.1.4Mesmo âmbito
Os técnicos de energia solar procedem à instalação e manutenção de sistemas que recolhem energia solar. Preparam os dispositivos necessários, muitas vezes em telhados, instalam painéis solares e ligam-nos a um sistema eletrónico que inclui um inversor para ligar os sistemas de energia solar às linhas elétricas.
Fonte: European Commission, DG EMPL — ESCO API 2026-08-08 (bridge v1.2.1)
Licença: CC BY 4.0 (EU Reuse Notice)
ESCO reuse terms and the modification notice are in Credits.
Ligações à classificação francesa (ROME)
Ligações entre esta ocupação e fichas ROME 4.0, estabelecidas pela AI Changing Work com modelos de IA. As relações leem-se do lado desta ocupação. As ligações marcadas como «provisório» foram adotadas apenas com base nos julgamentos de dois avaliadores da mesma família de modelos (Claude), ou por uma regra do operador aplicada a esses julgamentos, pelo que se apoiam em evidências mais fracas do que as ligações confirmadas.
| Código ROME | Designação ROME (francês) | Relação |
|---|---|---|
| F1610 | Installateur mainteneur / Installatrice mainteneuse en systèmes solaires, thermiques et photovoltaïques | Esta ocupação é mais restrita |
| F1602 | Electricien / Electricienne du bâtiment | Relacionada, não correspondente |
Source: France Travail — Répertoire Opérationnel des Métiers et des Emplois (ROME 4.0), version 61, last updated 15 June 2026 (https://www.data.gouv.fr/datasets/repertoire-operationnel-des-metiers-et-des-emplois-rome). Licence Ouverte 2.0.
ROME codes and titles are reproduced unchanged; the links to O*NET-SOC occupations are AI Changing Work's own judgment and are not a France Travail correspondence.
(AI Changing Work link release: fr-direct v1)
Ligações à classificação espanhola (CNO-11)
Ligações entre esta ocupação e ocupações CNO-11, estabelecidas pela AI Changing Work com modelos de IA. As relações leem-se do lado desta ocupação.
| Código CNO-11 | Designação CNO-11 (espanhol) | Relação |
|---|---|---|
| 7294 | Montadores-instaladores de placas de energía solar | Esta ocupação é mais restrita |
| 7510 | Electricistas de la construcción y afines | Relacionada, não correspondente |
Source: Instituto Nacional de Estadística (INE), National Classification of Occupations 2011 (CNO-11, Royal Decree 1591/2010) — www.ine.es · Licensed CC BY 4.0. CNO-11 codes and Spanish titles are reproduced unchanged; the links to O*NET occupations are AI Changing Work's own judgment and are not an INE correspondence.
(AI Changing Work link release: es-direct v1)
Ligações à classificação alemã (KldB)
Ligações entre esta ocupação e ocupações KldB, estabelecidas pela AI Changing Work com modelos de IA. As relações leem-se do lado desta ocupação.
| Código KldB | Designação KldB (alemão) | Relação |
|---|---|---|
| 26242 | Berufe in der regenerativen Energietechnik - fachlich ausgerichtete Tätigkeiten | Sobrepõem-se, não são iguaisprovisório |
| 26212 | Berufe in der Bauelektrik - fachlich ausgerichtete Tätigkeiten | Relacionada, não correspondenteprovisório |
Source: © Statistik der Bundesagentur für Arbeit — Klassifikation der Berufe 2010 – überarbeitete Fassung 2020, https://statistik.arbeitsagentur.de. KldB codes and titles are reproduced unchanged; the links to O*NET occupations are AI Changing Work's own mapping (eigene Zuordnung) and are not a Bundesagentur für Arbeit correspondence.
(AI Changing Work link release: de-direct v1)
Ligações à classificação japonesa (JSCO)
Ligações entre esta ocupação e ocupações JSCO, estabelecidas pela AI Changing Work com modelos de IA. As relações leem-se do lado desta ocupação.
| Código JSCO | Designação JSCO (japonês) | Relação |
|---|---|---|
| 679 | その他の電気工事従事者 | Relacionada, não correspondente |
Source: Ministry of Internal Affairs and Communications (MIC), Japan Standard Occupational Classification (Dec. 2009, MIC Notification No. 555). JSCO codes and Japanese titles are reproduced unchanged; the links to O*NET occupations are AI Changing Work's own judgment and are not a MIC correspondence.
(AI Changing Work link release: jp-direct v1)
Fontes de dados e licenças desta página, e avisos de modificação e tradução da AI Changing Work: Créditos e fontes