地毯安装工

建筑、维护与维修

AI暴露度

  • 数据来源: BLS发布时间: 2026-08

    低· 相对

    低四级相对区间很高

    职业群单位数值

    尺度 · 母数 · 来源

    四级相对类别(低 / 中等 / 高 / 很高)

    以BLS就业预测表中831个细分职业为基数。取值按 NEM(全国就业矩阵)代码给定,因此共用同一 NEM 代码的职业得到相同分档

    来源数据集(XLSX 文件下载)

  • 数据来源: Anthropic发布时间: 2026-03

    0.000

    0.000此处所载数值的范围0.745
    尺度 · 母数 · 来源

    观测暴露度指数,按发布原值0–1

    以O*NET任务映射为基准

    来源数据集

  • 数据来源: ILO发布时间: 2025

    0.10

    0.09此处所载数值的范围0.70

    职业群单位数值

    尺度 · 母数 · 来源

    生成式AI暴露度指数,按发布原值0–1

    ISCO-08职业小类单位 — 共用同一代码的职业取值相同

    本站计算,并非国际劳工组织发布的数值。在本站与 ILO 数据集相连的 1,012 个职业中,达到或高于此值的占 98%。

    来源数据集

该来源发布的是什么性质的数值

BLS的类别是相对排位而非绝对水平,也不是一手测量:它把多项已发表研究给出的职业百分位排名归并为四个等级。它不是就业或工资预测,不是采用概率,也不区分自动化与增强。

Task-level exposure

仅显示有暴露的工作

Values in this tab are predicted labels, not observations. Eloundou et al. (2023) published two rating regimes — human raters and GPT-4 — and the β shown here is derived from the GPT-4 rater basis alone; the same task can take a different value under the other regime. The unit and the meaning differ from the observed shares (%) in the other tabs, so do not place them on the same axis.

TaskβE1 + 0.5 × E2
Take measurements and study floor sketches to calculate the area to be carpeted and the amount of material needed.

O*NET Task ID 2839

0.5
Draw building diagrams and record dimensions.

O*NET Task ID 2845

0.5
Join edges of carpet and seam edges where necessary, by sewing or by using tape with glue and heated carpet iron.

O*NET Task ID 2833

0.0
Cut and trim carpet to fit along wall edges, openings, and projections, finishing the edges with a wall trimmer.

O*NET Task ID 2834

0.0
Inspect the surface to be covered to determine its condition, and correct any imperfections that might show through carpet or cause carpet to wear unevenly.

O*NET Task ID 2835

0.0
Roll out, measure, mark, and cut carpeting to size with a carpet knife, following floor sketches and allowing extra carpet for final fitting.

O*NET Task ID 2836

0.0
Plan the layout of the carpet, allowing for expected traffic patterns and placing seams for best appearance and longest wear.

O*NET Task ID 2837

0.0
Stretch carpet to align with walls and ensure a smooth surface, and press carpet in place over tack strips or use staples, tape, tacks or glue to hold carpet in place.

O*NET Task ID 2838

0.0
Cut carpet padding to size and install padding, following prescribed method.

O*NET Task ID 2840

0.0
Install carpet on some floors using adhesive, following prescribed method.

O*NET Task ID 2841

0.0
Nail tack strips around area to be carpeted or use old strips to attach edges of new carpet.

O*NET Task ID 2842

0.0
Fasten metal treads across door openings or where carpet meets flooring to hold carpet in place.

O*NET Task ID 2843

0.0
Measure, cut and install tackless strips along the baseboard or wall.

O*NET Task ID 2844

0.0
Move furniture from area to be carpeted and remove old carpet and padding.

O*NET Task ID 2846

0.0
Cut and bind material.

O*NET Task ID 2847

0.0
Clean up before and after installation, including vacuuming carpet and discarding remnant pieces.

O*NET Task ID 20142

0.0

β = E1 + 0.5 × E2 · E1 = tasks where direct LLM access alone cuts time by at least 50%, E2 = tasks where software built on top of an LLM cuts time by at least 50%. Values take only 0 / 0.5 / 1.0.

Data sources & licenses — O*NET®, Eloundou et al. (2023): see full notices on the Credits page

职业信息