变革管理顾问

管理

AI暴露度

  • 数据来源: BLS发布时间: 2026-08

    很高· 相对

    低四级相对区间很高

    职业群单位数值

    尺度 · 母数 · 来源

    四级相对类别(低 / 中等 / 高 / 很高)

    以BLS就业预测表中831个细分职业为基数。取值按 NEM(全国就业矩阵)代码给定,因此共用同一 NEM 代码的职业得到相同分档

    来源数据集(XLSX 文件下载)

  • 数据来源: Anthropic发布时间: 2026-03

    0.243

    0.000此处所载数值的范围0.745
    尺度 · 母数 · 来源

    观测暴露度指数,按发布原值0–1

    以O*NET任务映射为基准

    来源数据集

  • 数据来源: ILO发布时间: 2025

    0.46

    0.09此处所载数值的范围0.70

    职业群单位数值

    尺度 · 母数 · 来源

    生成式AI暴露度指数,按发布原值0–1

    ISCO-08职业小类单位 — 共用同一代码的职业取值相同

    本站计算,并非国际劳工组织发布的数值。在本站与 ILO 数据集相连的 1,012 个职业中,达到或高于此值的占 24%。

    来源数据集

该来源发布的是什么性质的数值

BLS的类别是相对排位而非绝对水平,也不是一手测量:它把多项已发表研究给出的职业百分位排名归并为四个等级。它不是就业或工资预测,不是采用概率,也不区分自动化与增强。

Task-level exposure

仅显示有暴露的工作

Values in this tab are predicted labels, not observations. Eloundou et al. (2023) published two rating regimes — human raters and GPT-4 — and the β shown here is derived from the GPT-4 rater basis alone; the same task can take a different value under the other regime. The unit and the meaning differ from the observed shares (%) in the other tabs, so do not place them on the same axis.

TaskβE1 + 0.5 × E2
Design, evaluate, recommend, and approve changes of forms and reports.

O*NET Task ID 7284

1.0
Gather and organize information on problems or procedures.

O*NET Task ID 7276

0.5
Analyze data gathered and develop solutions or alternative methods of proceeding.

O*NET Task ID 7277

0.5
Develop and implement records management program for filing, protection, and retrieval of records, and assure compliance with program.

O*NET Task ID 7279

0.5
Review forms and reports and confer with management and users about format, distribution, and purpose, identifying problems and improvements.

O*NET Task ID 7280

0.5
Document findings of study and prepare recommendations for implementation of new systems, procedures, or organizational changes.

O*NET Task ID 7282

0.5
Plan study of work problems and procedures, such as organizational change, communications, information flow, integrated production methods, inventory control, or cost analysis.

O*NET Task ID 7285

0.5
Recommend purchase of storage equipment and design area layout to locate equipment in space available.

O*NET Task ID 7286

0.5
Confer with personnel concerned to ensure successful functioning of newly implemented systems or procedures.

O*NET Task ID 7278

0.0
Interview personnel and conduct on-site observation to ascertain unit functions, work performed, and methods, equipment, and personnel used.

O*NET Task ID 7281

0.0
Prepare manuals and train workers in use of new forms, reports, procedures or equipment, according to organizational policy.

O*NET Task ID 7283

0.0

β = E1 + 0.5 × E2 · E1 = tasks where direct LLM access alone cuts time by at least 50%, E2 = tasks where software built on top of an LLM cuts time by at least 50%. Values take only 0 / 0.5 / 1.0.

Data sources & licenses — O*NET®, Eloundou et al. (2023): see full notices on the Credits page

职业信息