Power-Line Installers and Repairers

Construction, Maintenance & Repair

AI exposure

  • Data source: BLSPublished: 2026-08

    Low· relative

    LowFour relative bandsVery high

    Group-level value

    Scale, basis and source

    Four relative bands (Low / Moderate / High / Very high)

    831 detailed occupations in the BLS Employment Projections table. Assigned per National Employment Matrix (NEM) code, so occupations sharing a NEM code carry the same band

    Source dataset (XLSX download)

  • Data source: AnthropicPublished: 2026-03

    0.000

    0.000Range of values carried here0.745
    Scale, basis and source

    Observed exposure index, 0–1 as published

    Mapped onto O*NET tasks

    Source dataset

  • Data source: ILOPublished: 2025

    0.15

    0.09Range of values carried here0.70

    Group-level value

    Scale, basis and source

    Generative AI exposure index, 0–1 as published

    ISCO-08 unit group — every occupation sharing the code gets this value

    Computed by this site, not published by the ILO: of the 1,012 occupations this site links to the ILO dataset, 92% score at or above this value.

    Source dataset

What kind of figure this source publishes

The BLS category is a relative rank, not an absolute level, and it is not a first-hand measurement: it groups an occupation's percentile ranks across several published studies into four bands. It is not an employment or wage forecast, not a probability of adoption, and it does not separate automation from augmentation.

Task-level exposure

Exposed tasks only
TaskClaude.aiRaw / share %APIRaw / share %
Coordinate work assignment preparation and completion with other workers.

49-9051

0.00000.00.0100100.0
Not observed on any surface — 22 task(s) — These tasks have no row in the source for this release. The 0 in the share row is a display-stage composition ratio; absence is what the — in the raw row states.
Adhere to safety practices and procedures, such as checking equipment regularly and erecting barriers around work areas.
—0—0
Open switches or attach grounding devices to remove electrical hazards from disturbed or fallen lines or to facilitate repairs.
—0—0
Climb poles or use truck-mounted buckets to access equipment.
—0—0
Place insulating or fireproofing materials over conductors and joints.
—0—0
Install, maintain, and repair electrical distribution and transmission systems, including conduits, cables, wires, and related equipment, such as transformers, circuit breakers, and switches.
—0—0
Identify defective sectionalizing devices, circuit breakers, fuses, voltage regulators, transformers, switches, relays, or wiring, using wiring diagrams and electrical-testing instruments.
—0—0
Drive vehicles equipped with tools and materials to job sites.
—0—0
Inspect and test power lines and auxiliary equipment to locate and identify problems, using reading and testing instruments.
—0—0
String wire conductors and cables between poles, towers, trenches, pylons, and buildings, setting lines in place and using winches to adjust tension.
—0—0
Test conductors, according to electrical diagrams and specifications, to identify corresponding conductors and to prevent incorrect connections.
—0—0
Replace or straighten damaged poles.
—0—0
Install watt-hour meters and connect service drops between power lines and consumers' facilities.
—0—0
Attach cross-arms, insulators, and auxiliary equipment to poles prior to installing them.
—0—0
Travel in trucks, helicopters, and airplanes to inspect lines for freedom from obstruction and adequacy of insulation.
—0—0
Dig holes, using augers, and set poles, using cranes and power equipment.
—0—0
Trim trees that could be hazardous to the functioning of cables or wires.
—0—0
Splice or solder cables together or to overhead transmission lines, customer service lines, or street light lines, using hand tools, epoxies, or specialized equipment.
—0—0
Cut and peel lead sheathing and insulation from defective or newly installed cables and conduits prior to splicing.
—0—0
Pull up cable by hand from large reels mounted on trucks.
—0—0
Lay underground cable directly in trenches, or string it through conduit running through the trenches.
—0—0
Cut trenches for laying underground cables, using trenchers and cable plows.
—0—0
Clean, tin, and splice corresponding conductors by twisting ends together or by joining ends with metal clamps and soldering connections.
—0—0

Data sources & licenses — O*NET®, Anthropic Economic Index, Eloundou et al. (2023): see full notices on the Credits page