电工助手
建筑、维护与维修AI暴露度
- 数据来源: BLS发布时间: 2026-08
低· 相对
低四级相对区间很高职业群单位数值
尺度 · 母数 · 来源
四级相对类别(低 / 中等 / 高 / 很高)
以BLS就业预测表中831个细分职业为基数。取值按 NEM(全国就业矩阵)代码给定,因此共用同一 NEM 代码的职业得到相同分档
- 数据来源: Anthropic发布时间: 2026-03
0.000
0.000此处所载数值的范围0.745尺度 · 母数 · 来源
- 数据来源: ILO发布时间: 2025
0.09
0.09此处所载数值的范围0.70职业群单位数值
尺度 · 母数 · 来源
生成式AI暴露度指数,按发布原值0–1
ISCO-08职业小类单位 — 共用同一代码的职业取值相同
本站计算,并非国际劳工组织发布的数值。在本站与 ILO 数据集相连的 1,012 个职业中,达到或高于此值的占 100%。
该来源发布的是什么性质的数值
BLS的类别是相对排位而非绝对水平,也不是一手测量:它把多项已发表研究给出的职业百分位排名归并为四个等级。它不是就业或工资预测,不是采用概率,也不区分自动化与增强。
Task-level exposure
仅显示有暴露的工作Values in this tab are predicted labels, not observations. Eloundou et al. (2023) published two rating regimes — human raters and GPT-4 — and the β shown here is derived from the GPT-4 rater basis alone; the same task can take a different value under the other regime.
| Task | βE1 + 0.5 × E2 |
|---|---|
Requisition materials, using warehouse requisition or release forms.O*NET Task ID 4849 | 1.0 |
Trace out short circuits in wiring, using test meter.O*NET Task ID 4832 | 0.0 |
Measure, cut, and bend wire and conduit, using measuring instruments and hand tools.O*NET Task ID 4833 | 0.0 |
Maintain tools, vehicles, and equipment and keep parts and supplies in order.O*NET Task ID 4834 | 0.0 |
Drill holes and pull or push wiring through openings, using hand and power tools.O*NET Task ID 4835 | 0.0 |
Perform semi-skilled and unskilled laboring duties related to the installation, maintenance and repair of a wide variety of electrical systems and equipment.O*NET Task ID 4836 | 0.0 |
Disassemble defective electrical equipment, replace defective or worn parts, and reassemble equipment, using hand tools.O*NET Task ID 4837 | 0.0 |
Transport tools, materials, equipment, and supplies to work site by hand, handtruck, or heavy, motorized truck.O*NET Task ID 4838 | 0.0 |
Examine electrical units for loose connections and broken insulation and tighten connections, using hand tools.O*NET Task ID 4839 | 0.0 |
Strip insulation from wire ends, using wire stripping pliers, and attach wires to terminals for subsequent soldering.O*NET Task ID 4840 | 0.0 |
Thread conduit ends, connect couplings, and fabricate and secure conduit support brackets, using hand tools.O*NET Task ID 4841 | 0.0 |
Construct controllers and panels, using power drills, drill presses, taps, saws, and punches.O*NET Task ID 4842 | 0.0 |
String transmission lines or cables through ducts or conduits, under the ground, through equipment, or to towers.O*NET Task ID 4843 | 0.0 |
Clean work area and wash parts.O*NET Task ID 4844 | 0.0 |
Erect electrical system components and barricades, and rig scaffolds, hoists, and shoring.O*NET Task ID 4845 | 0.0 |
Install copper-clad ground rods, using a manual post driver.O*NET Task ID 4846 | 0.0 |
Raise, lower, or position equipment, tools, and materials, using hoist, hand line, or block and tackle.O*NET Task ID 4847 | 0.0 |
Dig trenches or holes for installation of conduit or supports.O*NET Task ID 4848 | 0.0 |
Bolt component parts together to form tower assemblies, using hand tools.O*NET Task ID 4850 | 0.0 |
Paint a variety of objects related to electrical functions.O*NET Task ID 4851 | 0.0 |
Operate cutting torches and welding equipment, while working with conduit and metal components to construct devices associated with electrical functions.O*NET Task ID 4852 | 0.0 |
Break up concrete, using airhammer, to facilitate installation, construction, or repair of equipment.O*NET Task ID 4853 | 0.0 |
Solder electrical connections, using soldering iron.O*NET Task ID 4854 | 0.0 |
Trim trees and clear undergrowth along right-of-way.O*NET Task ID 4855 | 0.0 |
β = E1 + 0.5 × E2 · E1 = tasks where direct LLM access alone cuts time by at least 50%, E2 = tasks where software built on top of an LLM cuts time by at least 50%. Values take only 0 / 0.5 / 1.0.
Data sources & licenses — O*NET®, Eloundou et al. (2023): see full notices on the Credits page