电力线路安装和维修工

建筑、维护与维修

AI暴露度

  • 数据来源: BLS发布时间: 2026-08

    低· 相对

    低四级相对区间很高

    职业群单位数值

    尺度 · 母数 · 来源

    四级相对类别(低 / 中等 / 高 / 很高)

    以BLS就业预测表中831个细分职业为基数。取值按 NEM(全国就业矩阵)代码给定,因此共用同一 NEM 代码的职业得到相同分档

    来源数据集(XLSX 文件下载)

  • 数据来源: Anthropic发布时间: 2026-03

    0.000

    0.000此处所载数值的范围0.745
    尺度 · 母数 · 来源

    观测暴露度指数,按发布原值0–1

    以O*NET任务映射为基准

    来源数据集

  • 数据来源: ILO发布时间: 2025

    0.15

    0.09此处所载数值的范围0.70

    职业群单位数值

    尺度 · 母数 · 来源

    生成式AI暴露度指数,按发布原值0–1

    ISCO-08职业小类单位 — 共用同一代码的职业取值相同

    本站计算,并非国际劳工组织发布的数值。在本站与 ILO 数据集相连的 1,012 个职业中,达到或高于此值的占 92%。

    来源数据集

该来源发布的是什么性质的数值

BLS的类别是相对排位而非绝对水平,也不是一手测量:它把多项已发表研究给出的职业百分位排名归并为四个等级。它不是就业或工资预测,不是采用概率,也不区分自动化与增强。

Task-level exposure

Values in this tab are predicted labels, not observations. Eloundou et al. (2023) published two rating regimes — human raters and GPT-4 — and the β shown here is derived from the GPT-4 rater basis alone; the same task can take a different value under the other regime. The unit and the meaning differ from the observed shares (%) in the other tabs, so do not place them on the same axis.

TaskβE1 + 0.5 × E2
Adhere to safety practices and procedures, such as checking equipment regularly and erecting barriers around work areas.

O*NET Task ID 8412

0.0
Open switches or attach grounding devices to remove electrical hazards from disturbed or fallen lines or to facilitate repairs.

O*NET Task ID 8413

0.0
Climb poles or use truck-mounted buckets to access equipment.

O*NET Task ID 8414

0.0
Place insulating or fireproofing materials over conductors and joints.

O*NET Task ID 8415

0.0
Install, maintain, and repair electrical distribution and transmission systems, including conduits, cables, wires, and related equipment, such as transformers, circuit breakers, and switches.

O*NET Task ID 8416

0.0
Identify defective sectionalizing devices, circuit breakers, fuses, voltage regulators, transformers, switches, relays, or wiring, using wiring diagrams and electrical-testing instruments.

O*NET Task ID 8417

0.0
Drive vehicles equipped with tools and materials to job sites.

O*NET Task ID 8418

0.0
Coordinate work assignment preparation and completion with other workers.

O*NET Task ID 8419

0.0
Inspect and test power lines and auxiliary equipment to locate and identify problems, using reading and testing instruments.

O*NET Task ID 8420

0.0
String wire conductors and cables between poles, towers, trenches, pylons, and buildings, setting lines in place and using winches to adjust tension.

O*NET Task ID 8421

0.0
Test conductors, according to electrical diagrams and specifications, to identify corresponding conductors and to prevent incorrect connections.

O*NET Task ID 8422

0.0
Replace or straighten damaged poles.

O*NET Task ID 8423

0.0
Install watt-hour meters and connect service drops between power lines and consumers' facilities.

O*NET Task ID 8424

0.0
Attach cross-arms, insulators, and auxiliary equipment to poles prior to installing them.

O*NET Task ID 8425

0.0
Travel in trucks, helicopters, and airplanes to inspect lines for freedom from obstruction and adequacy of insulation.

O*NET Task ID 8426

0.0
Dig holes, using augers, and set poles, using cranes and power equipment.

O*NET Task ID 8427

0.0
Trim trees that could be hazardous to the functioning of cables or wires.

O*NET Task ID 8428

0.0
Splice or solder cables together or to overhead transmission lines, customer service lines, or street light lines, using hand tools, epoxies, or specialized equipment.

O*NET Task ID 8429

0.0
Cut and peel lead sheathing and insulation from defective or newly installed cables and conduits prior to splicing.

O*NET Task ID 8430

0.0
Clean, tin, and splice corresponding conductors by twisting ends together or by joining ends with metal clamps and soldering connections.

O*NET Task ID 8431

0.0
Pull up cable by hand from large reels mounted on trucks.

O*NET Task ID 8432

0.0
Lay underground cable directly in trenches, or string it through conduit running through the trenches.

O*NET Task ID 8433

0.0
Cut trenches for laying underground cables, using trenchers and cable plows.

O*NET Task ID 8434

0.0

β = E1 + 0.5 × E2 · E1 = tasks where direct LLM access alone cuts time by at least 50%, E2 = tasks where software built on top of an LLM cuts time by at least 50%. Values take only 0 / 0.5 / 1.0.

Data sources & licenses — O*NET®, Eloundou et al. (2023): see full notices on the Credits page

职业信息