Jobs that follow AI data centers
Jobs come from where the money gathers
Railways made steelworks and engine drivers; power stations made electricians. Today the largest sums go to AI data centers. This page follows where that money flows and what work it creates.
The text on this page was written with AI assistance. AI disclosure
China · AI data centers
How much money, since when, and whereMoney and power: since when, how much
- Tencent capital spending (converted by ACW)
- Alibaba capital spending (fiscal year, converted by ACW)
- Computing center electricity use (right axis, TWh; dashed to the 2030 forecast) [news article republished on a government site]
View as a table
| Year | Tencent capital spending (converted by ACW) (US$ billion) | Alibaba capital spending (fiscal year, converted by ACW) (US$ bn) | Computing center electricity use (right axis, TWh; dashed to the 2030 forecast) [news article republished on a government site] (TWh) |
|---|---|---|---|
| 2019 | 4.7 | 4.7 | – |
| 2020 | 4.9 | 6.0 | – |
| 2021 | 5.2 | 8.3 | – |
| 2022 | 2.7 | 5.1 | – |
| 2023 | 3.4 | 4.5 | – |
| 2024 | 10.7 | 11.9 | – |
| 2025 | 11.0 | 17.5 | 170.0 |
| 2030 | – | – | 800.0 |
As of 2025 results · electricity use 2026-05-29
Bars are Tencent's annual capital spending (results announcements); the teal line is Alibaba's fiscal-year capital spending. Yuan amounts are converted at each year's average Federal Reserve rate (ACW conversion). Alibaba's year ends in March, so each value is placed in the year its fiscal year starts. Tencent's definition note changed in the 2024 annual results and again in 2025; the 2023 value is the same under both. Both are whole-company values, not data centers alone (Alibaba includes logistics, offices and land use rights; Tencent includes intangibles and land use rights). Tencent · Alibaba · Federal Reserve H.10
The only stated future amount is Alibaba's "at least CNY 380 billion over three years" (2025-02), so no future bars are drawn. No data center construction series was found. For "East Data, West Computing" there are only two point values with different scopes: total project investment above CNY 400 billion (2022-08) and direct investment above CNY 43.5 billion (2024-06) [news article republished on a government site]. Baidu is left out because only 2023–2025 is available (CNY 12.1 billion in 2025). Alibaba · NDRC · Xinhua article republished on gov.cn
The blue line is computing center electricity use as reported by People's Daily Overseas Edition from a National Energy Administration statement: two points, 2025 actual and 2030 forecast. People's Daily Overseas Edition article republished by the NEA
Where they are being built
- Filled circle: 5 AI data centers, Epoch AI estimate (size = planned maximum facility power); coordinates are city centres (GeoNames)
- Dashed circle: 10 national data center clusters ("East Data, West Computing"); coordinates are city centres (GeoNames)
As of clusters 2022-02 · Epoch site list 2026-11-18, power timelines 2026-11-19 (update date of each file)
| Hub | Cluster | Character (classified for this table) |
|---|---|---|
| Beijing–Tianjin–Hebei | Zhangjiakou | Eastern demand |
| Yangtze River Delta | Delta demonstration zone · Wuhu | Eastern demand |
| Guangdong–Hong Kong–Macao | Shaoguan | Eastern demand |
| Chengdu–Chongqing | Tianfu · Chongqing | Western demand |
| Inner Mongolia | Horinger | Western supply |
| Guizhou | Gui'an | Western supply |
| Gansu | Qingyang | Western supply |
| Ningxia | Zhongwei | Western supply |
Source: the 8 hubs and 10 clusters in the NDRC's "East Data, West Computing" Q&A (2022-02) and 5 Chinese sites in the Epoch AI dataset (estimates, facility power). Cluster coordinates are city-level; three (Delta demonstration zone, Tianfu, Gui'an) are representative points. Nationally there were more than 9.0 million standard racks and 280 EFLOPS at the end of 2024 (National Data Administration). Outlines are from Natural Earth. Boundary lines do not imply any position on sovereignty. NDRC · gov.cn · National Data Administration · Epoch AI
China · Power
How much is needed, what supplies it, and where the bottleneck isAll power: capacity and peak load (no official document stating a year of shortfall was found within what was collected)
- Installed capacity (year-end, nameplate)
- Annual peak load
View as a table
| Year | Installed capacity (year-end, nameplate) (GW) | Annual peak load (GW) |
|---|---|---|
| 2019 | 2,010.7 | – |
| 2020 | 2,200.6 | – |
| 2021 | 2,376.9 | – |
| 2022 | 2,564.1 | – |
| 2023 | 2,919.7 | – |
| 2024 | 3,348.6 | 1,451.0 |
| 2025 | 3,891.3 | 1,508.0 |
| 2026 | – | 1,553.0 |
As of capacity end-2025 · peak load 2026-07-30
Source: capacity from the National Bureau of Statistics, peak load from the National Energy Administration. No shortfall year is marked, and there are no reserve margin or effective capacity data to draw a required line as for the United States or Korea. Capacity is nameplate and 47% of it is solar and wind (ACW calculation), so the gap to peak load cannot be read as spare capacity. Only three peak load points, 2024–2026, were confirmed. The 2026 value is the highest up to the 2026-07-30 announcement, not a final annual figure. National Bureau of Statistics · National Energy Administration
| Area | What the official document says | Source |
|---|---|---|
| National balance | "全国电力供需总体平衡" (national supply and demand broadly balanced): a forecast assuming prolonged heat over wide areas in summer 2026. No planned outages in summer 2025 | National Energy Administration (2026-07) |
| East | "在东部大规模发展数据中心难以为继" (large-scale data center growth in the east is hard to sustain) | NDRC (2022-02) |
| West-to-east transmission | Capacity above 340 GW (2026); above 420 GW planned for 2030. 46 ultra-high-voltage lines in operation | National Energy Administration · NDRC and NEA, 15th Five-Year Plan for the New Power System (2026-08, PDF) |
| New data centers in hubs | More than 80% green power; national average PUE at or below 1.5 (end-2025 target) | NDRC and others (2024-07) |
| Grid investment | More than CNY 5 trillion of grid fixed-asset investment forecast for 2026–2030 | National Energy Administration press conference (2026-10-30) |
The official documents collected describe the bottleneck as a matter of location rather than quantity: generation is in the west and demand in the east, so policy moves data centers west and adds transmission.
Data centers within that: how much they use and what supplies it
[news article republished on a government site]
- Thermal (incl. biomass)6,327.2 TWh · 60%
- Hydro1,461.7 TWh · 14%
- Solar1,173.2 TWh · 11%
- Wind1,127.9 TWh · 11%
- Nuclear485.2 TWh · 5%
As of use 2026-05-29 · generation 2025
Use: values reported by People's Daily Overseas Edition as stated by the National Energy Administration at a meeting on 26 May 2026. The source is that article, republished on the administration's site; the administration's own item on the meeting that we found does not contain these figures. The wording differs by year (2025: total electricity used by computing centers; 2030: electricity used for computing). 170 TWh in 2025 is 1.6% of all electricity use; the 2030 forecast of 800 TWh is about 6%. The China Academy of Information and Communications Technology gave 166 TWh for 2024. People's Daily Overseas Edition article republished by the NEA · CAICT white paper
Fuel mix: generation in the National Bureau of Statistics' 2025 communiqué, preliminary. Thermal includes biomass (source note). The source table states no scope. It is read as national because it exceeds the same agency's industrial generation above designated size (9,715.9 TWh) and matches national hydro, wind and solar generation given by the National Energy Administration. The five sources and the total differ by 0.04 TWh. Unlike the U.S. sheet this is the whole country, not data center contracts. Solar and wind are 47% of 3,891 GW of installed capacity but 21.8% of generation (ACW calculation). The chart in ③ uses nameplate capacity. Wind and solar capacity rose from 415 GW in 2019 to 1,842 GW in 2025. National Bureau of Statistics
Timeline: AI data centers and power side by side
- 2026-11
- 2026-07
- 2026-05Power
Energy administration: computing centers used 170 TWh in 2025; 800 TWh forecast for 2030 [news article republished on a government site]
- 2026-01
- 2025-12
- 2025-10
- 2025-09
- 2025-08AI data centers
State Council opinions on deepening the "AI Plus" initiative
- 2025-07
- 2025-06
- 2025-05
- 2025-03
- 2025-02
- 2025-01AI data centers
- 2024-12
- 2024-08AI data centers
"East Data, West Computing": eight hubs exceed CNY 43.5 billion direct investment and 1.95 million racks [news article republished on a government site]
- 2024-07
- 2023-12
- 2023-10
- 2022-10
- 2022-09
- 2022-02
Selected from 30 collected events, newest first. Grey bands are policy or regulation. Titles link to the source. The notices of the three Chinese measures do not cite U.S. export controls as the reason. Figures we could confirm only in news articles, because no agency release was found, are marked as news articles republished on a government site. Three of the ultra-high-voltage items are State Grid texts posted on the State-owned Assets Supervision and Administration Commission site.
Common · How to read this
Indicators that share a name but differ by sheetIndicators defined differently by country
The sheets place charts with the same names in the same positions, but the available data differ by country and so do the definitions. Comparisons between sheets (the United States is about 8 times South Korea and 44 times Japan in 2026Q3; ACW calculation) carry these differences.
| Indicator | United States | South Korea | China | Japan |
|---|---|---|---|---|
| ① Capital spending bars (scope and accounting) | Five hyperscalers. Cash purchases of property and equipment in filings, excluding finance leases. Oracle's quarter runs June–August. Whole company | Property and equipment purchases in eight companies' consolidated cash flow statements. Two chip makers are 94% of 2026Q3. KT includes investment property. Whole company | Tencent (annual bars, includes intangibles and land use rights) and Alibaba (fiscal-year line, includes logistics and offices). Not quarterly. Whole company | "Capital investment" disclosed by four telecom and internet companies. KDDI on a payment basis, SoftBank on an acceptance basis (including lease accounting and rental handsets), IIJ cash payments plus finance leases. Whole company |
| ① Construction line | Private data center construction spending (dollars, work done that month). Quarterly sum drawn at 10× | New floor area started in "broadcasting and telecommunications facilities" (public included, stations and studios included, whole area counted at start). 4-quarter average | No line (no data center construction series was found) | Floor area started for buildings used by the information and communications industry (exchanges, stations and offices included). 4-quarter average |
| ① Power line | Facility power capacity estimated by Epoch (77 sites, cumulative, GW) | Data center peak power in the 11th Basic Plan (national, demand, GW), inside baseline demand before demand management | Computing center electricity use (TWh): two points, 2025 actual and 2030 forecast | Forecast peak power added by new and expanded sites (the added part only, GW) |
| ③ Test for the year of shortfall | One area, PJM: the year the anticipated margin falls below the reference (2029). Summer peak; the required line is an ACW calculation | National: the year confirmed capacity falls below target (2031). The plan fills it with new construction. Summer peak | No official document states a year of shortfall (within what was collected). Only nameplate capacity and peak load are drawn | Years in which expected unserved energy exceeds the target (from FY2028). The national test uses values read from a published chart. Demand is the August three-day peak average |
| ④ Fuel mix | Announced capacity in a sample of data center contracts (GW), not the national mix | National generation (TWh), utilities only, excluding self-generation | National generation (TWh, 2025 preliminary). Thermal includes biomass. The source states no scope | National generation (TWh), utilities plus self-generation |
Common · Companies and occupations
Wherever they are built, the same supply chain and occupations followWhere the $37.9 billion for a 1 GW data center goes
Annual operating cost of a 1 GW data center (Epoch AI model estimate; bar lengths are an ACW calculation)
Bar lengths show only the relative size of annual operating cost items in the same model (a different basis from the upfront cost above). The largest is electricity. Epoch AI
As of 2026-05-14 (Epoch AI publication)
Source: Epoch AI, cost model of a 1 GW AI data center (CC BY 4.0). A stylized model, not any specific facility; 1 GW here is IT nameplate capacity, a different basis from the facility power on the sheets above. Percentages are ACW calculations, not source values. Dashed chips are roles not found as a separate occupation in official classifications (searched: O*NET, apprenticeship bulletin titles, the Korean Standard Classification of Occupations handbook). This model is Epoch AI's estimate, not an official statistic. According to the source, its inputs include a BCG analysis for staffing, Glassdoor for wages, SemiAnalysis estimates for server and network costs, and a Turner & Townsend index for facility costs. Epoch AI
Related companies
How the 33 companies were chosen: their filings or company materials describe products, demand or business related to AI, data center or cloud infrastructure (see the evidence link on each row). For 12 of them (§) we found no separate data center figure in the results documents we looked at. Rows marked as not yet checked against the source have not been confirmed. Selection is not an assessment. Rows are ordered by supply chain type.
| Type | Company | Market cap (mixed definitions and dates) | Operating income | Net income | Evidence |
|---|---|---|---|---|---|
| Chips and servers | NVIDIA | 4,000.0† | 130.4 | 120.1 | Source |
| Chips and servers | AMD | 232.3† | 3.7 | 4.3 | Source |
| Chips and servers | Broadcom | 939.2† | 25.5 | 23.1 | Source |
| Chips and servers | Marvell | 64.1† | 1.3 | 2.7 | Source |
| Chips and servers | Super Micro Computer § | 15.1† | 2.8 | 2.2 | Source |
| Chips and servers | Dell Technologies | 39.2† | 8.1 | 5.9 | Source |
| Chips and servers | Foxconn | 106.0 | 8.3 | 6.0 | Source |
| Foundry and equipment | TSMC | 1,885.8 | 61.7 | 54.8 | Source [not yet checked against source] |
| Foundry and equipment | ASML § | 612.2 | 13.3 | 11.3 | Source |
| Memory | SK hynix § | 287.4‡ | 32.7 | 29.7 | Source |
| Memory | Samsung Electronics | 492.2‡ | 30.2 | 30.7 | Source |
| Memory | Micron | 368.1† | 99.3 | 85.0 | Source |
| Networking and optics | Arista Networks § | 105.6† | 3.9 | 3.5 | Source |
| Networking and optics | Amphenol | 106.0† | 5.9 | 4.3 | Source |
| Networking and optics | Lumentum § | 16.5† | 0.5 | −6.9 | Source |
| Networking and optics | Coherent | 34.5† | – | 0.8 | Source |
| Networking and optics | Corning | 45.0† | 2.3 | 1.6 | Source |
| Electrical equipment | Vertiv § | 48.2† | 1.8 | 1.3 | Source |
| Electrical equipment | Eaton | 139.0† | – | 4.1 | Source |
| Electrical equipment | Schneider Electric § | 160.0 | – | 4.9 | Source |
| Electrical equipment | ABB | 134.0 | 6.0 | 4.7 | Source |
| Electrical equipment | Hitachi | 146.7 | – | 5.0 | Source |
| Electrical equipment | HD Hyundai Electric | 20.2‡ | 0.7 | 0.5 | Source |
| Electrical equipment | Hyosung Heavy Industries | 12.1‡ | 0.5 | 0.4 | Source |
| Electrical equipment | LS ELECTRIC | 10.0‡ | 0.3 | 0.2 | Source |
| Power generation | Siemens Energy § | – | – | 4.3 | Source |
| Power generation | GE Vernova | 144.0† | 1.4 | 4.9 | Source |
| Power generation | Bloom Energy § | 3.9† | 0.1 | −0.1 | Source |
| Power generation | Caterpillar | 180.9† | 11.2 | 8.9 | Source |
| Power generation | Cummins | 45.1† | 4.0 | 2.8 | Source |
| Cooling | Mitsubishi Heavy Industries § | 73.1 | – | 2.1 | Source |
| Cooling | Trane Technologies § | 97.2† | 4.0 | 2.9 | Source |
| Construction | Quanta Services § | 55.8† | 1.6 | 1.0 | Source |
As of fiscal years ending 2025-11-02 to 2026-09-30 · market cap 2024-06-28 to 2026-10-30
This table shows where AI data center spending goes. It is not a recommendation to buy or sell any company's shares and is not a basis for investment decisions. Figures are taken from company filings and exchange statistics and differ in fiscal year, definition and date.
US$ billion. Operating and net income are the latest annual results; other currencies are converted at Federal Reserve rates (ACW conversion). Shading in the operating and net income columns uses one colour and shows only larger or smaller within the column (log scale), not better or worse. The market cap column mixes definitions and is not shaded. "−" in red marks a loss and is not shaded. For the 6 companies with "–", we found no operating income line in the filings we checked.
Market values use official routes only, not quote sites, so definitions and dates are mixed. † is the market value held by non-affiliates on the cover of U.S. annual reports, smaller than total market cap (20 companies). ‡ marks 5 Korean companies: shares outstanding times the average price for December 2025 in the same annual report (ACW calculation). The 7 unmarked values are exchange statistics or company reports. Siemens Energy (1): blank because no official value was obtained.
Which occupations
Jobs supported by the same $1 million (United States, 2025)
BLS employment requirements. Applies only to what is produced in the United States; industry averages. BLS
56% of the money goes to servers, but the same amount supports 1.6 times as many jobs in construction as in semiconductors (ACW calculation). Chips and memory made outside the United States do not appear in U.S. employment statistics.
According to an industry statement, one building takes 12 to 18 months and about 1,500 people work at the peak of construction. Once built, about 50 remain, roughly half of them direct employees.
Industry statement reported by the Virginia legislature's audit body (JLARC), 2024. JLARC
| Occupation | Main industry | Employment 2025 | 2025→2035 (BLS projection) |
|---|---|---|---|
| Electricians | Electrical contractors | 545,000 | +11.4% |
| HVAC and refrigeration mechanics | Plumbing and HVAC contractors | 298,800 | +13.5% |
| Plumbers, pipefitters and steamfitters | Plumbing and HVAC contractors | 332,300 | +8.1% |
| Power-line installers | Electric power industry | 62,900 | +15.3% |
| Powerhouse, substation and relay repairers | Electric power industry | 13,000 | +12.9% |
| Semiconductor processing technicians | Semiconductor manufacturing | 27,700 | +8.9% |
| Power plant operators | Electric power industry | 19,800 | −6.4% |
BLS Employment Projections 2025–35, United States. Employment within that industry; not the data center share alone. Each occupation links to its page. BLS
Emerging roles
| Role | Current status |
|---|---|
| Data center technician | Listed as an apprenticeable occupation by the U.S. Labor Department on 2026-11-18. Installs servers and cables and checks redundant power |
| Commissioning engineer | Not found as a separate occupation (searched: O*NET 31.0, apprenticeship bulletin titles). Listed as one title of energy engineers |
| Liquid cooling maintenance | Not found within the search (O*NET, apprenticeship bulletin titles, Korean Standard Classification of Occupations handbook) |
| Critical facilities operation | Not found within the search (O*NET, apprenticeship bulletin titles, Korean Standard Classification of Occupations handbook) |
| Status in South Korea | "Data center" has 0 hits in classification and unit names on the official NCS site (control word "cloud" in classification names: 115). Not in the 2024 and 2025 announcements of new Dictionary of Occupations entries either (within the search). Adjacent units cover server and storage management and internet service infrastructure NCS · Ministry of Employment and Labor (2024-06) · Ministry of Employment and Labor (2025-07) |
As of searched 2026-11-26
How many jobs one gigawatt supports
ACW calculation, not a source value
| Where the money goes | Amount (Epoch model) | U.S. production share (ACW calculation) | Job-years (ACW calculation) | Calculable |
|---|---|---|---|---|
| Facility (construction) | $11.4B | 100% | 65,900 | Yes (upper bound) |
| Servers | $21.2B | 5~42% | 3,200~26,200 | 8× range |
| Network | $4.9B | 36~42% | 4,000~4,800 | Partly |
| Utility works | $0.16B | 52~100% | 400~900 | Partly |
| Land | $0.17B | – | – | Not applicable |
| Total (excluding land) | $37.7B | 73,500~97,800 |
As of cost model 2026-05 · employment coefficients 2025
Calculated by ACW; not a value from the sources. 1 GW is IT nameplate capacity. Epoch AI cost items × import shares of investment goods in BEA input-output tables × BLS employment requirements (2025). A job-year is one job supported for one year across the supply chain. Servers receive 56% of the money but support only 4–27% of the jobs, while the facility receives 30% and supports 67–90%. No official source gives the current U.S. production share of AI servers (BEA tables end in 2023), so read the server range as an order of magnitude only. Jobs outside the United States are not in this calculation.
Occupations on the power supply side
| Occupation (United States) | 2025→2035 (BLS projection) |
|---|---|
| Solar photovoltaic installers | +36.5% |
| Wind turbine technicians | +29.5% |
| Power-line installers (all industries) | +10.3% |
| Electrical engineers | +9.9% |
| Substation and relay repairers | +9.7% |
| Power plant operators (all industries) | −5.1% |
| Nuclear reactor operators | −5.9% |
| Source | Permanent on-site jobs per GW |
|---|---|
| Large nuclear | about 500 |
| Small modular reactor (estimate) | 237 |
| Coal | 107 |
| Wind | 80 |
| Solar | 36 |
| Gas | 30 |
As of BLS 2025–35 · U.S. DOE 2024-10
Left: BLS Employment Projections 2025–35, all industries. Right: U.S. Department of Energy (2024), a single source. All are figures for the whole power sector; no official source separating data center supply was found (within what was collected). The two agencies point in different directions on nuclear: BLS projects −5.2% employment in nuclear generation (operation) to 2035, while DOE sees about 375,000 more workers needed for 200 GW of new plants by 2050 (about 275,000 of them in construction and manufacturing). Periods and scopes differ, so they cannot be set against each other directly. DOE states that data centers are causing shortages in skilled electrical trades, and 36% of transmission and distribution companies named line workers as the hardest job to fill. The Labor Department issued seven power apprenticeship bulletins (eight occupational standards) in 2025–26. South Korea aims to train 4,500 nuclear specialists by 2030; no NCS unit for small modular reactors was found (within the search). U.S. DOE · BLS · Industry ministry (2023-05)
Sources and terms
Sources, licences and modifications for this section are listed in Credits & Data Sources.