Jobs that follow AI data centers

Jobs come from where the money gathers

Railways made steelworks and engine drivers; power stations made electricians. Today the largest sums go to AI data centers. This page follows where that money flows and what work it creates.

The text on this page was written with AI assistance. AI disclosure

$230.4 billionQuarterly capital spending of five big tech companies (whole company, Q3 2026, ACW sum). 6 times the same quarter three years earlier
$8.5 billionU.S. data center construction spending in 2026-09. 66% of the office category, which includes data centers; preliminary
2026-11-18U.S. Labor Department lists Data Center Technician as a new apprenticeable occupation

Japan · AI data centers

How much money, since when, and where

Money and power: since when, how much

Four Japanese telecom and internet companies' capital spending, information industry building starts, forecast peak power from new data centers (quarterly)
planned / forecast →0030.961.892.7123.6US$ billionGW5.20.12 km²ChatGPT 2022-110.61.01.72.43.3'19'20'21'22'23'24'25'26'27'28'29'30
  • Capital spending of NTT, KDDI, SoftBank and IIJ (whole company, converted by ACW)
  • NTT, KDDI and IIJ only (quarters without SoftBank values)
  • Floor area started for information industry buildings (not data centers alone; 4-quarter average, read the end value)
  • Peak power added by new and expanded data centers (right axis, GW, all forecast)
View as a table
QuarterCapital spending of NTT, KDDI, SoftBank and IIJ (whole company, converted by ACW) (US$ billion)NTT, KDDI and IIJ only (quarters without SoftBank values)Floor area started for information industry buildings (not data centers alone; 4-quarter average, read the end value) (km²)Peak power added by new and expanded data centers (right axis, GW, all forecast) (GW)
2019Q1––––
2019Q2––––
2019Q3––––
2019Q4––0.10–
2020Q1––0.11–
2020Q2––0.10–
2020Q3––0.10–
2020Q4––0.12–
2021Q1––0.11–
2021Q2–5.20.17–
2021Q3–5.00.17–
2021Q4–5.00.14–
2022Q1–5.90.16–
2022Q2–4.30.09–
2022Q3–3.50.10–
2022Q4–4.00.13–
2023Q1–6.80.12–
2023Q2–3.50.12–
2023Q3–4.70.13–
2023Q4–4.40.11–
2024Q1–6.80.11–
2024Q24.7–0.09–
2024Q34.9–0.09–
2024Q46.1–0.09–
2025Q18.6–0.09–
2025Q25.6–0.10–
2025Q35.2–0.10–
2025Q46.6–0.10–
2026Q17.6–0.12–
2026Q26.3–0.13–
2026Q35.2–0.12–
2026Q4–––0.6
2027Q4–––1.0
2028Q4–––1.7
2029Q4–––2.4
2030Q4–––3.3

As of 2026Q3 · peak power forecast 2026-01-21

Bars add the capital investment of NTT, KDDI, SoftBank Corp. and IIJ (quarterly values in each company's results, whole company), converted at quarterly average Federal Reserve rates (ACW conversion). 2026Q3 is $5.2 billion (NTT JPY 547.7 billion, SoftBank 170.4, KDDI 107.1, IIJ 8.3; 159.2 yen per dollar). In 2026Q3 the five U.S. companies spent $230.4 billion, about 44 times the Japanese four in the same quarter, and the Korean eight $29.8 billion, about 6 times (ACW calculation). The groups differ in industry and accounting (see "Indicators defined differently by country" below). NTT · KDDI · SoftBank · IIJ · Federal Reserve H.10

The four companies' spending is whole-company, including networks, real estate and overseas business, not data centers alone. Bases differ: KDDI counts payments, SoftBank acceptance, IIJ cash payments plus finance leases. SoftBank's total includes lease accounting effects and rental handsets. Only the 10 quarters with all four companies (2024Q2–2026Q3) are filled bars; earlier dashed bars cover NTT, KDDI and IIJ only and cannot be compared in height. Quarters without NTT values are not drawn.

The dark green line is floor area started for buildings used by the information and communications industry in the Land Ministry's building start statistics, by quarter, averaged over four quarters (ACW calculation). Quarterly values swing widely (0.152 km², then 0.094 km²; 0.387 km² in Q2 2021). It is area, not money, and mixes exchanges, stations and offices with data centers. Whether leased data centers built under real estate companies' names fall in this category could not be confirmed. Fiscal years: 0.639 km² in FY2021, 0.358 km² in FY2024, 0.475 km² in FY2025. No start statistic for data centers alone and no series of start amounts was found (within what was collected). e-Stat

The blue dashed line is peak power that OCCTO's FY2026 demand assumption adds for new and expanded data centers. All of it is forecast, and it is the added part, not all data centers: 0.6 GW in FY2026 and, beyond the chart, 6.6 GW in FY2035. Fiscal-year values are placed at the fourth quarter for drawing. No estimated spending line is drawn. NTT expects whole-company investment of JPY 2.47 trillion in FY2026. Government support is in the tables below, not stacked on the bars. OCCTO

Quarterly investment split out for data centers and AI (part of the bars above, JPY billion)

QuarterNTT data center business (Global Solutions segment)US$ billion (converted by ACW)SoftBank "AI-related"
2025Q271.70.53.4
2025Q368.80.512.8
2025Q4110.40.71.9
2026Q1127.10.88.9
2026Q2101.20.610.3
2026Q3115.40.716.3

As of 2026Q3

NTT values cover only the Global Solutions segment of its data center business; overseas sites are included and Japan cannot be separated. They are unaudited internal figures (source note). The latest 6 of 14 quarters are shown. SoftBank began reporting "AI-related" separately in Q2 2025. Its FY2026 expectation is JPY 160.0 billion, far above the first-half actual of JPY 26.6 billion. NTT · SoftBank

SAKURA internet's GPU investment for generative AI (JPY 100 million, by service start)

Show details
Service startItemAmount (JPY 100 million)Type
2024-01H100 etc.34Actual
2024-06H100 etc.81Actual
2024-12H100 etc.50Actual
2025-04H100 etc.2Actual
2025-06H200 etc.79Actual
2025-06Container data center no. 130Actual
2025-08B200 etc.53Actual
2026-02B200 etc.135Actual
2026-02Container data center no. 248Actual
FY2025 (other)Other (added cooling for H100 etc.)7Actual
FY2026 (planned)Generator building etc.44Planned
FY2026 (planned)Rubin etc.260Planned
under reviewContainer data center no. 365Planned
Total of 10 actual items (calculated)519

Source: SAKURA internet results material. Dates are when service started, not when money was spent, so they are not joined into a quarterly line. Amounts drop fractions below JPY 100 million: the 10 items add to JPY 51.9 billion while the company's cumulative figure is JPY 52.1 billion (end-March 2026). The total plan is JPY 113.0 billion; the 3 planned items (JPY 36.9 billion) are part of the remainder. SAKURA internet

Investment in Japan announced by companies (periods and scopes differ; do not add)

Show details
CompanyAnnouncedPeriodAmountUS$ billion (yen amounts converted by ACW)Nature
Microsoft
Expansion of hyperscale cloud and AI infrastructure in Japan
2024-04-10two years from announcement$2.9 billion2.9Announced (plan or pledge)
Microsoft
AI infrastructure, cybersecurity and training combined; no data center share
2026-04-032026~2029$10.0 billion10.0Announced (plan or pledge)
Amazon Web Services
Cloud infrastructure in Tokyo and Osaka; the plan does not say whether operation and maintenance are included
2024-01-192023~2027JPY 2.26 trillion15.2Announced (plan or pledge)
Amazon Web Services
Data center construction, network, operation and maintenance in Japan
2024-01-192011~2022JPY 1.51 trillion10.2Cumulative actual (company statement)
Google
Network infrastructure in Japan (Inzai data center and the Topaz cable); not data centers alone
2022-10-072021~2024JPY 100 billion0.71Announced (plan or pledge)
NTT
Data center expansion and upgrades; worldwide, overseas included
2023-05-12FY2023~FY2027JPY 1.5 trillion or more10.9Announced (plan or pledge)
NTT
Cumulative data center investment, overseas included
2025-09-26FY2023~2025-03$5.4 billion5.4Cumulative actual (company statement)
Mitsui Fudosan
Cumulative data center investment (Tokyo area plus newly decided Kansai sites)
2025-08-01start not stated (as of 2025-08)about JPY 300 billion2.0Cumulative (includes decided projects)
Mitsui Fudosan
Cumulative data center development target
2026-07-23~2035more than JPY 600 billion3.8Target (cumulative)
SoftBank Corp.
Land and buildings for the Sakai AI data center; construction and equipment are separate
2025-03-14single itemabout JPY 100 billion0.66Acquisition price (contract)
SoftBank Corp.
Tomakomai data center, Hokkaido (METI regional subsidy project)
2025-11single itemmore than JPY 65 billion0.42Project cost (subsidised project)
GMO Internet Group
GPU servers for a GPU cloud (about 800 H200)
2024-04-19single itemabout JPY 10 billion0.06Announced (plan or pledge)
GMO Internet
Additional GPU cloud investment (256 H200, due Q4 2025)
2025-05-14single itemabout JPY 1.5 billion0.01Announced (plan or pledge)

Source: company releases, briefing materials and METI documents, ranging from single items to 12-year totals. AWS's 2011–2022 actual includes operation and maintenance, and NTT includes overseas data centers. Microsoft's 2026 announcement must not be added to its 2024 one. Mitsui Fudosan's total includes projects only decided. Dollar values use the average Federal Reserve rate of the quarter of announcement and are approximate; do not mix them with the quarterly bars above. Oracle's Japan announcement and the Kansai Electric–CyrusOne plan are not included because the originals were not obtained.

Government supply: computing (GPU) plans certified by METI (maximum subsidy by operator, JPY 100 million)

Show details
OperatorCertified FY2023Certified FY2024Total (calculated)US$ billion (converted by ACW)
SAKURA internet
certified 2023-06-16 · 2024-04-15
685015690.37
SoftBank Corp.
certified 2023-07-07 · 2024-05-10
534214740.31
KDDI
certified 2024-04-19
–102.4102.40.07
HIGHRESO and HIGHRESO Kagawa (joint)
certified 2024-04-19
–77770.05
RUTILEA and AI Fukushima (joint)
certified 2024-04-19
–25.625.60.02
GMO Internet Group
certified 2024-04-15
–19.319.30.01
Xeureka
certified 2023-11-02
11–110.01
Total (calculated)1321,146.31,278.30.83

Government support: regional data center programmes (JPY 100 million; stages differ, do not add)

Show details

Source: METI's certification page (Economic Security Promotion Act, cloud programs) and MIC and METI budget documents. Korea's government buys GPUs and allocates them; Japan subsidises private operators' GPU build-out. Maximum subsidies are ceilings, not spending. Years follow certification dates; yearly totals (JPY 13.2 billion in FY2023, JPY 114.6 billion in FY2024) and operator totals are sums of individual values, not source figures. METI's page lists no certification after 10 May 2024. Quantum cloud and technology development certifications are excluded. MIC's fund includes cable landing stations. METI's "AI and semiconductor" budgets and the support framework to FY2030 are mostly semiconductors and are not in the table. METI

Where they are being built

0.1GW0.3GW1.0GWTomakomai >0.3 GW (future)Inzai, Shiroi 0.2 GWYokohamaSakai 0.15 GWIshikariAkitaTomiyaYaitaJoso, TsukubaNantoKagawaKitakyushuSatsumasendai
  • Light fill: under construction (announced value)
  • Hollow circle: planned (announced value)
  • Solid dot: operating, capacity not disclosed
  • Dashed circle: 10 government-certified "GW-scale clusters" and one study memorandum (capacity not disclosed)

As of 2026-09-11

Hide or show details
ProjectAnnounced capacity (GW)Stage
SoftBank Tomakomai
Groundbreaking in April 2025. Phase 1 differs by source: 50 MW (company, 2023-11) and 10 MW receiving capacity (METI, 2025-11). Opening targeted in FY2026
Not in the source: investment
>0.3Under construction
SoftBank Sakai
Former Sharp plant acquired for about JPY 100 billion (2025-03). Operation targeted during 2026, eventually above 250 MW. Receiving capacity
Not in the source: total investment; no notice of operation was found
0.15Planned
NTT Tokyo TKY12 (Inzai, Shiroi)
IT capacity. Service from 2030 or later (2026-04)
Not in the source: investment; the release does not say AI-only
0.2Planned
NTT Tochigi TCG11
IT power capacity at full build-out. Completion planned for 2029
Not in the source: city (so not on the map), construction start, investment
0.1Planned
NTT group total in Japan
From about 300 MW to about 1 GW by FY2033 (2026-04). Overlaps the two above
Not in the source: breakdown by site, investment
1.0Group target
KDDI Osaka Sakai
Operating since January 2026. A separate facility on the same former Sharp site
Not in the source: power capacity, investment
–Operating
SAKURA internet Ishikari
Container type operating since June 2025. About 3.5 MVA and 1,000 GPUs
Not in the source: capacity in MW
–Operating
GX strategic areas, 10 sites
Local plans for GW-scale clusters within about ten years, certified by the government (2026-09): Ishikari, Tomakomai, Akita, Tomiya, Yaita, Joso and Tsukuba, Nanto, Kagawa, Kitakyushu area, Satsumasendai
Not in the source: capacity, operators, start dates ("plan outlines to be published later")
GW-scaleGovernment-certified
Inside JERA's Yokohama thermal plant
Study of a data center connected directly to the plant (2025-10)
Not in the source: capacity, timing, tenants
–Study memorandum

As of 2026-09-11

Sources are company releases and results and announcements by METI and Yokohama City. 16 sites with coordinates are on the map, at city centres; three (Joso and Tsukuba, Kagawa, Kitakyushu) span several municipalities and use one representative point. Only 5 state a capacity, on mixed bases: SoftBank's two are receiving capacity, NTT's are IT capacity. The NTT group target overlaps TKY12 and TCG11 and must not be added. At 1 GW or more there are only the government-certified "GW-scale clusters" and the NTT group target. The 10 sites are areas whose local plans were certified, not individual data centers, and certification carries conditions. Circles use the same scale as the U.S. map. No party colours are drawn: in the MIC survey (as of 31 December 2025) 44 of 46 governors were independents, so colour would carry no information. No power contracts for data centers were found (within what was collected), so no plants are drawn. Outlines are from Natural Earth. Boundary lines do not imply any position on sovereignty. MIC survey (2025-12-31)

Japan · Power

How much is needed, what supplies it, and when it falls short

All power: when it falls short

Japan: supply capability and demand (GW, August three-day peak average, supply plan)
1401601802002026202720282029203020312032203320342035192.5164.6FY2028: supply falls 10.3 GW; unserved energy above targetGW
  • Supply capability (10 areas, planned)
  • Demand (10 areas, forecast)
  • Part of demand from new and expanded data centers (forecast; lower edge is an ACW calculation)
  • Years in which expected unserved energy exceeds the target (9 areas, read from a published chart, FY2028–2035)
View as a table
YearSupply capability (10 areas, planned) (GW)Demand (10 areas, forecast) (GW)
2026187.3159.6
2027188.7160.0
2028178.4160.5
2029179.9161.5
2030182.5162.4
2031187.6163.1
2032190.6163.7
2033191.0164.2
2034192.1164.4
2035192.5164.6

As of FY2026 supply plan summary (2026-03)

Source: annual tables in the annex of OCCTO's FY2026 supply plan summary. Demand is the August three-day peak average (sending end) and supply is capability that can be relied on at that time. Both add values reported by 10 areas, before adjustment over interconnections. Japan judges reliability by expected unserved energy over the 8,760 hours of a year, not by reserve margin. Supply falls from 188.7 GW in FY2027 to 178.4 GW in FY2028, down 10.3 GW. The source attributes the excess from that year to "suspension and retirement of power sources and so on" and does not name data center demand. In that year expected unserved energy is 0.179, 3.3 times the target of 0.054 (read from a chart). OCCTO

The August reserve margin is 11.2% even in the lowest year, so the two lines alone do not look short: the test covers a whole year including maintenance, not one August snapshot. The margin is calculated as (supply − demand) ÷ demand because the source has no table. The national test reads the nine-area row of a chart, not a sentence. The vertical axis does not start at zero. The actual August 2025 margin of 12.1% is not joined because its basis could not be confirmed.

National values by year (August; demand, supply and new data centers in GW)

YearDemand (forecast)Supply (planned)Margin % (ACW calculation)Expected unserved energy (read from a chart)Target (read from a chart)Result (ACW)New data centers (forecast)
FY2026159.6187.317.30.0240.058–0.64
FY2027160.0188.718.00.0100.059–1.04
FY2028160.5178.411.20.1790.054Below criterion1.66
FY2029161.5179.911.40.1530.038Below criterion2.41
FY2030162.4182.512.30.1490.038Below criterion3.28
FY2031163.1187.615.00.0760.041Below criterion4.14
FY2032163.7190.616.40.0550.041Below criterion4.92
FY2033164.2191.016.30.0580.041Below criterion5.61
FY2034164.4192.116.80.0540.040Below criterion6.15
FY2035164.6192.516.90.0520.039Below criterion6.61

As of 2026-03

Demand and supply are the source's 10 MW values divided by 100 (GW). Unserved energy is in kWh/kW·year for nine areas excluding Okinawa. "Below criterion" marks years in which expected unserved energy exceeds the target.

Data centers within that: how much they use and what supplies it

Electricity use added by new and expanded data centers (TWh, all forecast)
FY2026 forecast 4.8FY2035 forecast 49.4015304560
Fuel mix of 991.1 TWh generated in FY2024
  • Natural gas319.4 TWh · 32%
  • Coal278.5 TWh · 28%
  • Solar98.1 TWh · 10%
  • Nuclear93.5 TWh · 9%
  • Hydro73.5 TWh · 7%
  • Oil etc.71.1 TWh · 7%
  • Wind and geothermal15.6 TWh · 2%
  • Other (remainder, ACW calculation)41.4 TWh · 4%
Fuel mix of 33.8 GW planned by the end of FY2035 (rated output, planned)
  • Nuclear10.2 GW · 30%
  • LNG10.0 GW · 30%
  • Thermal other than LNG0.1 GW · 0%
  • Wind5.7 GW · 17%
  • Batteries5.2 GW · 15%
  • Solar1.8 GW · 5%
  • Other (remainder, ACW calculation)0.9 GW · 3%

As of use 2026-01-21 · generation FY2024 · plans 2026-03

Use: OCCTO's FY2026 demand assumption. It is the part added by new and expanded data centers, not all data center use; existing sites are not included. In peak power it goes from 0.6 GW to 6.6 GW (forecast). No official statistic of actual data center electricity use was found (within what was collected), so unlike the U.S. and Korean sheets the first part of the bar is also a forecast. With chip plants the FY2035 peak is +7.6 GW, 4.6% of national peak demand (ACW calculation). Fuel mix: generation in the Agency for Natural Resources and Energy's FY2024 final energy statistics, national, utilities plus self-generation. Fossil fuels are 67.5%. "Other" is the remainder after the listed sources because the biomass row was not extracted. Plans: reported by generators in the FY2026 supply plan, rated output rather than effective capability. Planned retirements are 9.4 GW (coal 4.8 GW), a net addition of 24.5 GW (ACW calculation). The Seventh Strategic Energy Plan (2025-02) foresees 40–50% renewables, about 20% nuclear and 30–40% thermal in FY2040. OCCTO · Agency for Natural Resources and Energy · Supply plan

Timeline: AI data centers and power side by side

  1. 2026-10
  2. 2026-09
  3. 2026-08
  4. 2026-07
  5. 2026-04
  6. 2026-03
  7. 2026-01
  8. 2025-10
  9. 2025-09
  10. 2025-08
  11. 2025-07
  12. 2025-06
  13. 2025-03
  14. 2025-02
  15. 2024-06
  16. 2024-05
  17. 2024-04
  18. 2024-01
  19. 2023-11
  20. 2023-06
  21. 2023-05

Selected from 25 collected events plus dated entries in the announced investment and government certification tables above, newest first. Supercomputers are left out. Grey bands are policy or outlooks. Titles link to the source.

Japan · Annex

Tables that supplement the main text
Annex: what can be tracked
IndicatorLatest valueHow the next value arrives
Company capital spending (4 companies)2026Q3 $5.2 billionAutomatic: company results files, quarterly
NTT data center investment2026Q3 JPY 115.4 billion (overseas included)Automatic: results supplement, quarterly
Information industry building starts2026-09 0.059 km²Automatic: e-Stat, monthly
SAKURA internet cumulative investmentJPY 52.1 billion (end-March 2026; plan 113.0)Manual: results material, quarterly
Peak power forecast for new data centers6.6 GW in FY2035 (2026-01-21)Manual: demand assumption, every January
Fuel mix (fossil share)67.5% in FY2024Manual: energy statistics, final in April
Long-term decarbonised auction contracts4.3 GWManual: auction results, yearly
Certified GX strategic sites10 (2026-09)Manual: METI page, on each certification
MIC digital infrastructure fundJPY 72.0 billion (cables included)Manual: supplementary budgets
Actual use, number and capacity of data centers nationwideNoneNot possible: no official statistic found (others not checked)
Annex: years below criterion by area
Area2026202720282029203020312032203320342035
Hokkaido––––––––––
Tohoku––BelowBelow––––––
TokyoBelow–BelowBelowBelowBelow––––
Chubu to Shikoku––BelowBelowBelow–––––
Kyushu––BelowBelowBelowBelowBelowBelowBelowBelow
Okinawa––––––––BelowBelow

As of 2026-03

Source: OCCTO FY2026 supply plan summary. "Below" marks areas and years the source describes as exceeding the target; "–" marks those not named in its sentences. The stated causes are "suspension, retirement and maintenance of power sources" for Tokyo in FY2026 and "suspension and retirement of power sources" from FY2028; data center demand is not named as a cause. FY2026 in Tokyo is a short-term snapshot of one area, and FY2028 is the first year that includes Tohoku, Tokyo, Chubu to Shikoku and Kyushu together, so it is this sheet's reference year. "Chubu to Shikoku" follows the source and groups several areas. OCCTO

ItemWhat the official document saysSource
National demandAugust three-day peak average: 158.8 GW in FY2025 (actual); 162.4 GW in FY2030, 164.6 GW in FY2035 (forecast)OCCTO
Data centers and chip plants+7.6 GW of peak demand by FY2035 (forecast). Data centers are below the previous assumption because of "postponed or delayed construction"OCCTO

Common · How to read this

Indicators that share a name but differ by sheet

Indicators defined differently by country

The sheets place charts with the same names in the same positions, but the available data differ by country and so do the definitions. Comparisons between sheets (the United States is about 8 times South Korea and 44 times Japan in 2026Q3; ACW calculation) carry these differences.

IndicatorUnited StatesSouth KoreaChinaJapan
① Capital spending bars (scope and accounting)Five hyperscalers. Cash purchases of property and equipment in filings, excluding finance leases. Oracle's quarter runs June–August. Whole companyProperty and equipment purchases in eight companies' consolidated cash flow statements. Two chip makers are 94% of 2026Q3. KT includes investment property. Whole companyTencent (annual bars, includes intangibles and land use rights) and Alibaba (fiscal-year line, includes logistics and offices). Not quarterly. Whole company"Capital investment" disclosed by four telecom and internet companies. KDDI on a payment basis, SoftBank on an acceptance basis (including lease accounting and rental handsets), IIJ cash payments plus finance leases. Whole company
① Construction linePrivate data center construction spending (dollars, work done that month). Quarterly sum drawn at 10×New floor area started in "broadcasting and telecommunications facilities" (public included, stations and studios included, whole area counted at start). 4-quarter averageNo line (no data center construction series was found)Floor area started for buildings used by the information and communications industry (exchanges, stations and offices included). 4-quarter average
① Power lineFacility power capacity estimated by Epoch (77 sites, cumulative, GW)Data center peak power in the 11th Basic Plan (national, demand, GW), inside baseline demand before demand managementComputing center electricity use (TWh): two points, 2025 actual and 2030 forecastForecast peak power added by new and expanded sites (the added part only, GW)
③ Test for the year of shortfallOne area, PJM: the year the anticipated margin falls below the reference (2029). Summer peak; the required line is an ACW calculationNational: the year confirmed capacity falls below target (2031). The plan fills it with new construction. Summer peakNo official document states a year of shortfall (within what was collected). Only nameplate capacity and peak load are drawnYears in which expected unserved energy exceeds the target (from FY2028). The national test uses values read from a published chart. Demand is the August three-day peak average
④ Fuel mixAnnounced capacity in a sample of data center contracts (GW), not the national mixNational generation (TWh), utilities only, excluding self-generationNational generation (TWh, 2025 preliminary). Thermal includes biomass. The source states no scopeNational generation (TWh), utilities plus self-generation

Common · Companies and occupations

Wherever they are built, the same supply chain and occupations follow

Where the $37.9 billion for a 1 GW data center goes

Servers $21.2B · chips, memory, racks
Facility $11.4B · buildings, power, cooling
Network $4.9B · switches, fiber
Operation (per year)

Annual operating cost of a 1 GW data center (Epoch AI model estimate; bar lengths are an ACW calculation)

electricitytaxesmaintenancelaborwater

Bar lengths show only the relative size of annual operating cost items in the same model (a different basis from the upfront cost above). The largest is electricity. Epoch AI

As of 2026-05-14 (Epoch AI publication)

Source: Epoch AI, cost model of a 1 GW AI data center (CC BY 4.0). A stylized model, not any specific facility; 1 GW here is IT nameplate capacity, a different basis from the facility power on the sheets above. Percentages are ACW calculations, not source values. Dashed chips are roles not found as a separate occupation in official classifications (searched: O*NET, apprenticeship bulletin titles, the Korean Standard Classification of Occupations handbook). This model is Epoch AI's estimate, not an official statistic. According to the source, its inputs include a BCG analysis for staffing, Glassdoor for wages, SemiAnalysis estimates for server and network costs, and a Turner & Townsend index for facility costs. Epoch AI

Related companies

How the 33 companies were chosen: their filings or company materials describe products, demand or business related to AI, data center or cloud infrastructure (see the evidence link on each row). For 12 of them (§) we found no separate data center figure in the results documents we looked at. Rows marked as not yet checked against the source have not been confirmed. Selection is not an assessment. Rows are ordered by supply chain type.

TypeCompanyMarket cap (mixed definitions and dates)Operating incomeNet incomeEvidence
Chips and serversNVIDIA4,000.0†130.4120.1Source
Chips and serversAMD232.3†3.74.3Source
Chips and serversBroadcom939.2†25.523.1Source
Chips and serversMarvell64.1†1.32.7Source
Chips and serversSuper Micro Computer §15.1†2.82.2Source
Chips and serversDell Technologies39.2†8.15.9Source
Chips and serversFoxconn106.08.36.0Source
Foundry and equipmentTSMC1,885.861.754.8Source [not yet checked against source]
Foundry and equipmentASML §612.213.311.3Source
MemorySK hynix §287.4‡32.729.7Source
MemorySamsung Electronics492.2‡30.230.7Source
MemoryMicron368.1†99.385.0Source
Networking and opticsArista Networks §105.6†3.93.5Source
Networking and opticsAmphenol106.0†5.94.3Source
Networking and opticsLumentum §16.5†0.5−6.9Source
Networking and opticsCoherent34.5†–0.8Source
Networking and opticsCorning45.0†2.31.6Source
Electrical equipmentVertiv §48.2†1.81.3Source
Electrical equipmentEaton139.0†–4.1Source
Electrical equipmentSchneider Electric §160.0–4.9Source
Electrical equipmentABB134.06.04.7Source
Electrical equipmentHitachi146.7–5.0Source
Electrical equipmentHD Hyundai Electric20.2‡0.70.5Source
Electrical equipmentHyosung Heavy Industries12.1‡0.50.4Source
Electrical equipmentLS ELECTRIC10.0‡0.30.2Source
Power generationSiemens Energy §––4.3Source
Power generationGE Vernova144.0†1.44.9Source
Power generationBloom Energy §3.9†0.1−0.1Source
Power generationCaterpillar180.9†11.28.9Source
Power generationCummins45.1†4.02.8Source
CoolingMitsubishi Heavy Industries §73.1–2.1Source
CoolingTrane Technologies §97.2†4.02.9Source
ConstructionQuanta Services §55.8†1.61.0Source

As of fiscal years ending 2025-11-02 to 2026-09-30 · market cap 2024-06-28 to 2026-10-30

This table shows where AI data center spending goes. It is not a recommendation to buy or sell any company's shares and is not a basis for investment decisions. Figures are taken from company filings and exchange statistics and differ in fiscal year, definition and date.

US$ billion. Operating and net income are the latest annual results; other currencies are converted at Federal Reserve rates (ACW conversion). Shading in the operating and net income columns uses one colour and shows only larger or smaller within the column (log scale), not better or worse. The market cap column mixes definitions and is not shaded. "−" in red marks a loss and is not shaded. For the 6 companies with "–", we found no operating income line in the filings we checked.

Market values use official routes only, not quote sites, so definitions and dates are mixed. † is the market value held by non-affiliates on the cover of U.S. annual reports, smaller than total market cap (20 companies). ‡ marks 5 Korean companies: shares outstanding times the average price for December 2025 in the same annual report (ACW calculation). The 7 unmarked values are exchange statistics or company reports. Siemens Energy (1): blank because no official value was obtained.

Which occupations

Jobs supported by the same $1 million (United States, 2025)

Construction5.76Design and engineering5.25Electrical equipment mfg.4.82Machinery mfg. (incl. cooling)4.19Semiconductor mfg.3.58Data center operation3.33Computer mfg.2.94Power generation and grid2.69Communications equip. mfg.2.30

BLS employment requirements. Applies only to what is produced in the United States; industry averages. BLS

56% of the money goes to servers, but the same amount supports 1.6 times as many jobs in construction as in semiconductors (ACW calculation). Chips and memory made outside the United States do not appear in U.S. employment statistics.

According to an industry statement, one building takes 12 to 18 months and about 1,500 people work at the peak of construction. Once built, about 50 remain, roughly half of them direct employees.

Industry statement reported by the Virginia legislature's audit body (JLARC), 2024. JLARC

OccupationMain industryEmployment 20252025→2035 (BLS projection)
ElectriciansElectrical contractors545,000+11.4%
HVAC and refrigeration mechanicsPlumbing and HVAC contractors298,800+13.5%
Plumbers, pipefitters and steamfittersPlumbing and HVAC contractors332,300+8.1%
Power-line installersElectric power industry62,900+15.3%
Powerhouse, substation and relay repairersElectric power industry13,000+12.9%
Semiconductor processing techniciansSemiconductor manufacturing27,700+8.9%
Power plant operatorsElectric power industry19,800−6.4%

BLS Employment Projections 2025–35, United States. Employment within that industry; not the data center share alone. Each occupation links to its page. BLS

Emerging roles

RoleCurrent status
Data center technicianListed as an apprenticeable occupation by the U.S. Labor Department on 2026-11-18. Installs servers and cables and checks redundant power
Commissioning engineerNot found as a separate occupation (searched: O*NET 31.0, apprenticeship bulletin titles). Listed as one title of energy engineers
Liquid cooling maintenanceNot found within the search (O*NET, apprenticeship bulletin titles, Korean Standard Classification of Occupations handbook)
Critical facilities operationNot found within the search (O*NET, apprenticeship bulletin titles, Korean Standard Classification of Occupations handbook)
Status in South Korea"Data center" has 0 hits in classification and unit names on the official NCS site (control word "cloud" in classification names: 115). Not in the 2024 and 2025 announcements of new Dictionary of Occupations entries either (within the search). Adjacent units cover server and storage management and internet service infrastructure NCS · Ministry of Employment and Labor (2024-06) · Ministry of Employment and Labor (2025-07)

As of searched 2026-11-26

How many jobs one gigawatt supports

ACW calculation, not a source value

Where the money goesAmount (Epoch model)U.S. production share (ACW calculation)Job-years (ACW calculation)Calculable
Facility (construction)$11.4B100%65,900Yes (upper bound)
Servers$21.2B5~42%3,200~26,2008× range
Network$4.9B36~42%4,000~4,800Partly
Utility works$0.16B52~100%400~900Partly
Land$0.17B––Not applicable
Total (excluding land)$37.7B73,500~97,800

As of cost model 2026-05 · employment coefficients 2025

Calculated by ACW; not a value from the sources. 1 GW is IT nameplate capacity. Epoch AI cost items × import shares of investment goods in BEA input-output tables × BLS employment requirements (2025). A job-year is one job supported for one year across the supply chain. Servers receive 56% of the money but support only 4–27% of the jobs, while the facility receives 30% and supports 67–90%. No official source gives the current U.S. production share of AI servers (BEA tables end in 2023), so read the server range as an order of magnitude only. Jobs outside the United States are not in this calculation.

Occupations on the power supply side

SourcePermanent on-site jobs per GW
Large nuclearabout 500
Small modular reactor (estimate)237
Coal107
Wind80
Solar36
Gas30

As of BLS 2025–35 · U.S. DOE 2024-10

Left: BLS Employment Projections 2025–35, all industries. Right: U.S. Department of Energy (2024), a single source. All are figures for the whole power sector; no official source separating data center supply was found (within what was collected). The two agencies point in different directions on nuclear: BLS projects −5.2% employment in nuclear generation (operation) to 2035, while DOE sees about 375,000 more workers needed for 200 GW of new plants by 2050 (about 275,000 of them in construction and manufacturing). Periods and scopes differ, so they cannot be set against each other directly. DOE states that data centers are causing shortages in skilled electrical trades, and 36% of transmission and distribution companies named line workers as the hardest job to fill. The Labor Department issued seven power apprenticeship bulletins (eight occupational standards) in 2025–26. South Korea aims to train 4,500 nuclear specialists by 2030; no NCS unit for small modular reactors was found (within the search). U.S. DOE · BLS · Industry ministry (2023-05)

Sources and terms

Sources, licences and modifications for this section are listed in Credits & Data Sources.