Jobs that follow AI data centers
Jobs come from where the money gathers
Railways made steelworks and engine drivers; power stations made electricians. Today the largest sums go to AI data centers. This page follows where that money flows and what work it creates.
The text on this page was written with AI assistance. AI disclosure
South Korea · AI data centers
How much money, since when, and whereMoney and power: since when, how much
- Capital spending, eight Korean companies (2 chip makers + 6 platform, telecom and IT)
- Government AI budget (annual amount divided by 4 — ACW calculation. 2026 is the government proposal, not spending. Not to be added to capital spending)
- Broadcasting and telecom building starts, floor area (includes data centers; 4-quarter average. Read the end value; the line has no axis)
- Data center peak power (right axis, GW; only 2023 is actual, dashed = planned)
View as a table
| Quarter | Capital spending, eight Korean companies (2 chip makers + 6 platform, telecom and IT) (US$ billion) | Government AI budget (annual amount divided by 4 — ACW calculation. 2026 is the government proposal, not spending. Not to be added to capital spending) | Broadcasting and telecom building starts, floor area (includes data centers; 4-quarter average. Read the end value; the line has no axis) (km²) | Data center peak power (right axis, GW; only 2023 is actual, dashed = planned) (GW) |
|---|---|---|---|---|
| 2019Q1 | 9.4 | – | 0.02 | – |
| 2019Q2 | 11.1 | – | 0.02 | – |
| 2019Q3 | 10.3 | – | 0.02 | – |
| 2019Q4 | 11.4 | – | 0.03 | – |
| 2020Q1 | 11.9 | – | 0.04 | – |
| 2020Q2 | 11.8 | – | 0.04 | – |
| 2020Q3 | 11.6 | – | 0.03 | – |
| 2020Q4 | 14.3 | – | 0.04 | – |
| 2021Q1 | 14.9 | – | 0.06 | – |
| 2021Q2 | 16.5 | – | 0.07 | – |
| 2021Q3 | 14.4 | – | 0.10 | – |
| 2021Q4 | 14.9 | – | 0.12 | – |
| 2022Q1 | 13.7 | – | 0.13 | – |
| 2022Q2 | 14.5 | – | 0.11 | – |
| 2022Q3 | 15.0 | – | 0.11 | – |
| 2022Q4 | 17.7 | – | 0.11 | – |
| 2023Q1 | 15.0 | – | 0.08 | – |
| 2023Q2 | 15.5 | – | 0.12 | – |
| 2023Q3 | 13.0 | – | 0.13 | – |
| 2023Q4 | 15.3 | – | 0.12 | 0.6 |
| 2024Q1 | 13.8 | – | 0.11 | – |
| 2024Q2 | 11.8 | – | 0.07 | – |
| 2024Q3 | 12.2 | – | 0.07 | – |
| 2024Q4 | 17.9 | – | 0.10 | – |
| 2025Q1 | 14.5 | 0.58 | 0.14 | – |
| 2025Q2 | 13.6 | 0.58 | 0.18 | – |
| 2025Q3 | 13.1 | 0.58 | 0.19 | – |
| 2025Q4 | 18.2 | 0.58 | 0.16 | 1.2 |
| 2026Q1 | 18.2 | 1.73 | 0.17 | – |
| 2026Q2 | 17.9 | 1.73 | 0.21 | – |
| 2026Q3 | 29.8 | 1.73 | 0.24 | – |
| 2026Q4 | – | 1.73 | – | – |
| 2027Q4 | – | – | – | 2.3 |
| 2030Q4 | – | – | – | 3.3 |
As of 2026Q3
Bars add purchases of property and equipment by Samsung Electronics, SK hynix, Naver, Kakao, SK Telecom, KT, LG Uplus and Samsung SDS (consolidated cash flow statements in the Financial Supervisory Service bulk files, whole company). KT includes investment property. Amounts are converted to dollars at the quarterly average of Federal Reserve daily rates (ACW calculation) and rounded once, at the eight-company total. OpenDART · Federal Reserve H.10 · KOSIS
Of $29.8 billion in 2026Q3, the two chip makers spent $27.9 billion and the other six $1.9 billion. In 2026Q3 the five U.S. companies spent $230.4 billion, about 8 times the Korean eight in the same quarter (ACW calculation). The two totals group different industries under different accounting (see "Indicators defined differently by country" below). The chip makers' spending is mostly chip plants and equipment, not data center construction: read it as spending by the side that makes the memory going into AI data centers.
The dark green line is new floor area started in the "broadcasting and telecommunications facilities" category of the Land Ministry's building start statistics, by quarter, averaged over four quarters (ACW calculation). Quarterly values swing widely (0.38 km², then 0.25 km²). It is not the same measure as the teal line on the U.S. sheet, so it has a different colour: it is area, not money; it mixes broadcasting stations, telephone exchanges and studios with data centers; and the whole area is counted when work starts. Data centers joined the category in March 2019. Annual totals: 0.489 km² in 2021, 0.648 km² in 2025, 0.831 km² in the first 9 months of 2026 (preliminary). Korea has no official construction statistic for data centers alone. No estimated spending line is drawn because there is no quarterly power capacity plan as in the United States.
Plans announced by companies: Samsung Electronics KRW 84.4 trillion of facility investment in 2026 (KRW 76.8 trillion of it chips), Samsung SDS Gumi KRW 427.3 billion, Kakao Namyangju about KRW 600 billion, Naver GAK Sejong expansion $10 billion. The blue line is data center peak power in the 11th Basic Plan for Electricity; only 2023 is actual, the rest are planned values. 11th Basic Plan
Purple is the central government's AI budget: KRW 3.3 trillion in 2025 (including the supplementary budget, about $2.3 billion) and KRW 10.1 trillion in the 2026 government proposal (about $6.9 billion at the average rate of the first 9 months), each divided by four and placed on the quarterly bars. Budgets are annual, so the quarterly split is only for drawing, and quarters without actual spending show the budget alone. A budget is not spending and differs in nature from company capital spending: although stacked, it is not a value to add. The 2026 figure is the proposal because no enacted total was found. The definition of the government AI budget changed three times, so it cannot be joined to years before 2024, and Finance Ministry documents give no total for 2023 or 2024. The 2027 proposal of KRW 21.3 trillion is a different grouping that includes chips and is not drawn. The one programme that continues across three years is GPU purchases: KRW 1.46 trillion in the 2025 supplementary budget, 2.08 trillion in 2026 and 3.85 trillion in the 2027 proposal. korea.kr
Where they are being built
- Hollow circle: AI data center targeting 1 GW or more (planned); inner circle: part contracted or started
- Light fill: part under construction
- Square: nuclear plants in the power timeline (not data center contracts; smallest square where capacity was not collected, 1)
- Blue background: Democratic Party of Korea (12, at election in June 2026)
- Red background: People Power Party (4, at election in June 2026)
As of 2026-11-28
The background shows the party of each metropolitan mayor or provincial governor at the time of election in the June 2026 local elections (National Election Commission list of elected candidates). Later changes of party are not reflected. They are shown because they hold powers over building approval for large data centers and over applications for distributed energy zones. In special and metropolitan cities the mayor permits buildings of 21 or more storeys or 100,000 m² or more in total floor area; in provinces the governor must approve the same size before a city or county issues the permit (Building Act, Article 11; exceptions apply). Permits for smaller buildings belong to cities, counties and districts, grid impact assessment belongs to the minister, and transmission and electricity rates are not within their powers. Special rules for self-governing cities and provinces and for the merged special city were not checked. The colours do not imply any causal link or judgement about parties and data center locations and are unrelated to the party colours on the U.S. map. Gwangju and South Jeolla have merged into one special city with a single head. National Election Commission · Building Act, Article 11 Province boundaries are Statistics Korea's 2013 boundaries (southkorea-maps) and do not reflect later changes, such as Gunwi joining Daegu.
| Project | Target GW (planned) | Stage |
|---|---|---|
GS Donghae Phase 1 of 1.2 GW started (2026-11). Site and permits settled; operation targeted for 2029 Not in the source: investment, power source, customer | 2.4 | Construction started |
SK Ulsan Only 0.1 GW started. Operation targeted for late 2027, supplied by LNG cogeneration Not in the source: schedule and investment for the expansion to 1.0 GW | 1.0 | Partly started |
SK Yeongnam (includes Ulsan) KRW 140 trillion, "including attracting capital" (2026-07) Not in the source: sites outside Ulsan, power, schedule | 2.0 | Agreement (MOU) |
SK Southwest KRW 470 trillion, including two chip plants (2026-06) Not in the source: site, power, schedule, data center share | 1.0 | Agreement (MOU) |
SK–OpenAI Southwest Joint project in South Jeolla (2025-10) Not in the source: capacity, site. Whether it is the same project as the one above is not confirmed | – | Agreement (MOU) |
SK Telecom–NVIDIA First operation in Korea planned for 2027 (2026-07) Not in the source: site, investment, power | up to 2.0 | Agreement (MOU) |
SK Telecom–Anthropic "to be pursued" (2026-07) Not in the source: capacity, site, investment, schedule | GW-scale | Agreed to pursue |
| GW-scale | Agreed to pursue | |
Naver (megaproject) Several regions, based in Sejong (2026-06) Not in the source: schedule, investment, power | 1.0 | Plan announced |
Naver–NVIDIA The contract covers 0.2 GW at GAK Sejong: $10 billion, 0.06 GW operating in the first half of 2027 Not in the source: schedule at GW scale. Whether it is the same project as the 1.0 GW above is not confirmed | GW-scale | Partly contracted |
Solaseado AI Supercluster Target of KRW 15 trillion in private capital (2025-02) Not in the source: investors, power. Two substations requested from the government | at least 3.0 | Agreement (MOU) |
Solaseado Data Center Park Agreement for a 154 kV substation in 2028 (2023-08) Not in the source: confirmed investors, schedule | 1.0 | Agreement (MOU) |
As of 2026-11-28
Only the 12 projects stating GW scale are shown (including one with no capacity in the source and three described only as "GW-scale"; 26 sites were collected separately). Naver's 1.0 GW is not one site but several regions based in Sejong. Sources are company releases and filings and government briefings. Capacities overlap and must not be added. The government's "three megaprojects" of 8.4 GW (18.4 GW by 2035) combine SK 5 GW, GS 2.4 GW and Naver 1 GW, and within SK's 5 GW only Ulsan has a confirmed site. The map shows only the four disclosed locations (Donghae, Ulsan, Sejong, Haenam), at city or county centre points. Of 12 projects, the source names the power supply for two and a customer for one. Solaseado is a plan in a provincial release; the investment agreement itself was not confirmed.
National figures come from different dates: 147 sites and 1.8 GW at end-2022; 732 notices for 49.4 GW submitted to KEPCO through 2029 (requests); grid impact assessment pilot totals of 1.9 GW in the capital area and 7 GW elsewhere (the source does not say whether requested or approved). Circles and squares use the same scale as the U.S. map. Industry ministry · Climate ministry · korea.kr
Why so many are still agreements or plans
| Obstacle | What is confirmed | Source |
|---|---|---|
| Announcements are recent | Nine of 12 targets were announced between 8 June and 25 July 2026. From announcement to construction start took 70 days in Ulsan, 152 in Donghae, 298 in Gumi and 558 in Haenam | ACW calculation, not a source value |
| Power | Of 601 sites requesting power in the capital area, 40 (6.7%, 2023 data) could be supplied on time. The minister called supplying power on time "the most important task" | Industry ministry (2023) · Climate ministry (2026-05) |
| Requests without real demand | Requests include "demand whose construction is undecided". In November 2026 rules were added against speculative applicants filing assessments or reserving exemptions | Industry ministry (2023) · Science ministry (2026-11) · Climate ministry (2026-11) |
| Assessment and permits | GW-scale projects mostly fall outside the exemption (50 MW or less). Assessment usually takes about five months. With permits split across agencies there are "voices saying investment is being delayed". The act addressing this takes effect on 10 March 2027 | korea.kr (2025-05) · Science ministry (2026-11) · law.go.kr |
| Funding and customers | The three companies' KRW 550 trillion "includes attracting investment". SK Telecom writes that it "will review" sites, power and anchor tenants | Government (2026-06) · SK Telecom notice |
As of 2026-11-28
This table contains only what official documents describe as obstacles and what is calculated from collected data. No official document names the cause of delay of an individual project. Whether each project passed a grid impact assessment, has a supply contract, or is bound by its investment agreement could not be confirmed.
Announced amounts per 1 GW — ACW calculation, not a source value
| Project | Announced amount | Target GW | US$ billion per GW (ACW calculation) | What the amount includes |
|---|---|---|---|---|
| Three megaprojects, phase 1 (to 2029) | KRW 550 trillion | 8.4 | 44.8 | Appears to include servers (ACW inference, not the source's words). "Includes attracting foreign investment" |
| SK Yeongnam | KRW 140 trillion | 2.0 | 47.9 | "Partnerships with foreign operators, attracting capital and so on" |
| Naver GAK Sejong expansion | $10 billion | 0.2 | 50.0 | Contract amount. Brookfield up to $9 billion, NVIDIA $1 billion |
| SK Southwest | KRW 470 trillion | 1.0 | – | Includes two memory chip plants. The data center share is not in the source |
| LG Uplus Paju phases 1–3 | KRW 2.75 trillion | 0.2 | 9.4 | Approved ceiling in facility investment filings (about 130% of expected cost). Buildings and equipment |
| Solaseado Data Center Park | up to KRW 10 trillion | 1.0 | 6.8 | Park development and attracting data centers |
| Samsung SDS Gumi | KRW 427.3 billion | 0.06 | 4.9 | New construction |
| Solaseado AI Supercluster | KRW 15 trillion | at least 3.0 | at most 3.4 | Private capital target |
| Epoch model: total including servers | – | 1.0 | 37.9 | servers 21.2 · facility 11.4 · network 4.9 |
| Epoch model: facility only | – | 1.0 | 11.4 | buildings, power, cooling |
As of 2026-11-28
ACW calculation: announced amounts converted at the 2026 average rate (1,461 won per dollar) and divided by target capacity. The sources do not break the amounts down into servers, buildings, power equipment and land. Announced amounts are planned totals that include capital still to be raised, not committed investment. Many target capacities do not say whether they mean facility or IT power, while Epoch's model 1 GW is IT capacity; the bases differ, so compare only roughly.
South Korea · Power
How much is needed, what supplies it, and when it falls shortAll power: when it falls short
- Confirmed capacity (planned)
- With new construction (planned)
- Required capacity (target demand + reference margin, planned)
- Target demand (forecast)
View as a table
| Year | Confirmed capacity (planned) (GW) | With new construction (planned) (GW) | Required capacity (target demand + reference margin, planned) (GW) | Target demand (forecast) (GW) |
|---|---|---|---|---|
| 2024 | 121.7 | 121.7 | 121.2 | 101.0 |
| 2025 | 125.5 | 125.5 | 123.0 | 102.5 |
| 2026 | 128.7 | 128.7 | 125.0 | 104.2 |
| 2027 | 132.1 | 132.1 | 127.4 | 106.2 |
| 2028 | 133.5 | 133.5 | 129.3 | 107.8 |
| 2029 | 134.5 | 134.5 | 132.3 | 109.3 |
| 2030 | 135.6 | 135.6 | 134.8 | 111.4 |
| 2031 | 137.0 | 137.2 | 137.2 | 113.4 |
| 2032 | 137.8 | 140.0 | 140.0 | 115.7 |
| 2033 | 140.4 | 144.0 | 144.0 | 118.0 |
| 2034 | 143.1 | 146.8 | 146.8 | 120.3 |
| 2035 | 145.1 | 150.2 | 150.2 | 123.1 |
| 2036 | 146.6 | 152.5 | 152.5 | 125.0 |
| 2037 | 147.6 | 155.1 | 155.1 | 127.1 |
| 2038 | 147.5 | 157.8 | 157.8 | 129.3 |
As of 11th Basic Plan for Electricity (2025-02-21)
Source: annual tables of the 11th Basic Plan for Electricity. The plan says "capacity shortfall from 2031; new capacity must be built" (2031: confirmed 137.0 GW, target 137.2 GW). The gap widens to 10.3 GW in 2038, and the plan is built to fill it with new plants, so from 2031 the line with new construction overlaps the required line. Data center demand (planned: 1.2 GW in 2025, 3.3 GW in 2030, 6.2 GW in 2038) is inside baseline demand before demand management; the data center share of target demand is not in the source. The difference in 2031 is 0.2 GW, and the vertical axis does not start at zero. The test differs from the U.S. sheet (see "Indicators defined differently by country" below). Korea Power Exchange
| Area | What the official document says | Source |
|---|---|---|
| Nationwide | Capacity shortfall from 2031 (planned). 10.3 GW of new capacity needed by 2038 | 11th Basic Plan (2025-02) |
| Capital area | 33% of 27 approved grid impact assessments are in the capital area; 42% for data centers alone | Industry ministry (2025-08) |
| Jeonnam, Jeju, Busan, Gyeonggi | Designated as distributed energy zones | Climate ministry (2025-11) |
| National transmission | 99 transmission and substation projects designated as national grid projects | National grid expansion committee (2025-10) |
South Korea has one national grid, so there is no regional supply and demand table. At regional level there are only rules and designations.
Data centers within that: how much they use and what supplies it
- Nuclear184.7 TWh · 31%
- Coal (bituminous + anthracite, ACW sum)170.8 TWh · 29%
- LNG162.1 TWh · 27%
- New and renewable68.1 TWh · 11%
- Pumped storage, oil, other7.9 TWh · 1%
- LNG12.1 GW · 28%
- LNG cogeneration2.2 GW · 5%
- Coal replacement (fuel not stated)8.4 GW · 20%
- Large nuclear8.4 GW · 20%
- Small modular reactor0.7 GW · 2%
- Pumped storage5.7 GW · 13%
- Fuel reserved3.1 GW · 7%
- Carbon-free market1.5 GW · 4%
- Not stated0.5 GW · 1%
As of generation 2025 · construction plan 2025-02-21
Use: 11th Basic Plan for Electricity (2025-02). In peak power terms it goes from 0.6 GW in 2023 (actual) to 6.2 GW in 2038 (forecast). Fuel mix: 2025 final values from the Korea Power Exchange (EPSIS), national utility generation excluding self-generation. The U.S. bar covers data center contracts only, so the scope differs. No filing of a power purchase contract dedicated to a data center was confirmed from a primary source in Korea, and only SK Ulsan states on-site or nearby generation (within what was collected). Planned construction: ACW sum of 73 entries in the plan's construction table (excluding renewable additions). Retirements in the same period are 41 units and 20.4 GW, a net addition of 22.2 GW. The table states no fuel for "coal replacement" and "fuel reserved". Planned 2038 generation shares are nuclear 35.2%, renewables 29.2%, LNG 10.6% and coal 10.1%. The 12th plan has no figures yet. EPSIS · 11th Basic Plan
Timeline: AI data centers and power side by side
- 2026-11
- 2026-08
- 2026-07
- 2026-06
- 2026-03
- 2026-02
- 2026-01AI data centers
- 2025-11
- 2025-10
- 2025-08
- 2025-06
- 2025-02
- 2025-01
- 2024-09
- 2024-06
- 2024-05
- 2023-11AI data centers
- 2023-09
- 2023-08AI data centers
- 2023-03
- 2023-01
- 2022-11
Selected from collected events, newest first. Supercomputers are left out because their purpose differs. Grey bands are policy. Titles link to the source. In Korea most power-side events are changes in rules rather than company announcements.
South Korea · Annex
A table that supplements the main textAnnex: what can be tracked
| Indicator | Latest value | How the next value arrives |
|---|---|---|
| Company capital spending (8 companies) | 2026Q3 $29.8 billion | Automatic: FSS bulk filing files, quarterly |
| Government AI budget and GPU budget | 2026 KRW 10.1 trillion · GPUs KRW 2.08 trillion (2027 proposal 3.85 trillion) | Manual: September proposal, December adoption, supplementary budgets |
| Facility investment filings for data centers | 5 since 2019, KRW 3.2 trillion. Latest: KRW 789 billion (2026-11-19). The three LG Uplus filings are approved ceilings (about 130% of expected cost) | Manual: filing list automatic, text checked by a person |
| GPUs secured by the government | 35,000 of a 50,000 target (2026-07) 13,000 in 2025-12 (spoken answer at a briefing) | Manual: ministry briefings |
| Grid impact assessment pilot totals (approval not stated in the source) | Capital area 28 cases, 1.9 GW; elsewhere 64 cases, 7 GW (2026-11) | Not possible: values cannot be read from KEPCO's page |
| Number and capacity of data centers nationwide | 147 sites, 1.8 GW (2022-12; the source does not say whether contracted or peak) | Not possible: no later release |
| Electricity sold to data centers | None | Not possible: no such category in KEPCO statistics |
Only 13 of 2,068 listed filings, chosen by company name, were opened, so builders, REITs and unlisted companies are missing. Korea has no equivalent of U.S. Census construction spending or Epoch's site timelines.
Common · How to read this
Indicators that share a name but differ by sheetIndicators defined differently by country
The sheets place charts with the same names in the same positions, but the available data differ by country and so do the definitions. Comparisons between sheets (the United States is about 8 times South Korea and 44 times Japan in 2026Q3; ACW calculation) carry these differences.
| Indicator | United States | South Korea | China | Japan |
|---|---|---|---|---|
| ① Capital spending bars (scope and accounting) | Five hyperscalers. Cash purchases of property and equipment in filings, excluding finance leases. Oracle's quarter runs June–August. Whole company | Property and equipment purchases in eight companies' consolidated cash flow statements. Two chip makers are 94% of 2026Q3. KT includes investment property. Whole company | Tencent (annual bars, includes intangibles and land use rights) and Alibaba (fiscal-year line, includes logistics and offices). Not quarterly. Whole company | "Capital investment" disclosed by four telecom and internet companies. KDDI on a payment basis, SoftBank on an acceptance basis (including lease accounting and rental handsets), IIJ cash payments plus finance leases. Whole company |
| ① Construction line | Private data center construction spending (dollars, work done that month). Quarterly sum drawn at 10× | New floor area started in "broadcasting and telecommunications facilities" (public included, stations and studios included, whole area counted at start). 4-quarter average | No line (no data center construction series was found) | Floor area started for buildings used by the information and communications industry (exchanges, stations and offices included). 4-quarter average |
| ① Power line | Facility power capacity estimated by Epoch (77 sites, cumulative, GW) | Data center peak power in the 11th Basic Plan (national, demand, GW), inside baseline demand before demand management | Computing center electricity use (TWh): two points, 2025 actual and 2030 forecast | Forecast peak power added by new and expanded sites (the added part only, GW) |
| ③ Test for the year of shortfall | One area, PJM: the year the anticipated margin falls below the reference (2029). Summer peak; the required line is an ACW calculation | National: the year confirmed capacity falls below target (2031). The plan fills it with new construction. Summer peak | No official document states a year of shortfall (within what was collected). Only nameplate capacity and peak load are drawn | Years in which expected unserved energy exceeds the target (from FY2028). The national test uses values read from a published chart. Demand is the August three-day peak average |
| ④ Fuel mix | Announced capacity in a sample of data center contracts (GW), not the national mix | National generation (TWh), utilities only, excluding self-generation | National generation (TWh, 2025 preliminary). Thermal includes biomass. The source states no scope | National generation (TWh), utilities plus self-generation |
Common · Companies and occupations
Wherever they are built, the same supply chain and occupations followWhere the $37.9 billion for a 1 GW data center goes
Annual operating cost of a 1 GW data center (Epoch AI model estimate; bar lengths are an ACW calculation)
Bar lengths show only the relative size of annual operating cost items in the same model (a different basis from the upfront cost above). The largest is electricity. Epoch AI
As of 2026-05-14 (Epoch AI publication)
Source: Epoch AI, cost model of a 1 GW AI data center (CC BY 4.0). A stylized model, not any specific facility; 1 GW here is IT nameplate capacity, a different basis from the facility power on the sheets above. Percentages are ACW calculations, not source values. Dashed chips are roles not found as a separate occupation in official classifications (searched: O*NET, apprenticeship bulletin titles, the Korean Standard Classification of Occupations handbook). This model is Epoch AI's estimate, not an official statistic. According to the source, its inputs include a BCG analysis for staffing, Glassdoor for wages, SemiAnalysis estimates for server and network costs, and a Turner & Townsend index for facility costs. Epoch AI
Related companies
How the 33 companies were chosen: their filings or company materials describe products, demand or business related to AI, data center or cloud infrastructure (see the evidence link on each row). For 12 of them (§) we found no separate data center figure in the results documents we looked at. Rows marked as not yet checked against the source have not been confirmed. Selection is not an assessment. Rows are ordered by supply chain type.
| Type | Company | Market cap (mixed definitions and dates) | Operating income | Net income | Evidence |
|---|---|---|---|---|---|
| Chips and servers | NVIDIA | 4,000.0† | 130.4 | 120.1 | Source |
| Chips and servers | AMD | 232.3† | 3.7 | 4.3 | Source |
| Chips and servers | Broadcom | 939.2† | 25.5 | 23.1 | Source |
| Chips and servers | Marvell | 64.1† | 1.3 | 2.7 | Source |
| Chips and servers | Super Micro Computer § | 15.1† | 2.8 | 2.2 | Source |
| Chips and servers | Dell Technologies | 39.2† | 8.1 | 5.9 | Source |
| Chips and servers | Foxconn | 106.0 | 8.3 | 6.0 | Source |
| Foundry and equipment | TSMC | 1,885.8 | 61.7 | 54.8 | Source [not yet checked against source] |
| Foundry and equipment | ASML § | 612.2 | 13.3 | 11.3 | Source |
| Memory | SK hynix § | 287.4‡ | 32.7 | 29.7 | Source |
| Memory | Samsung Electronics | 492.2‡ | 30.2 | 30.7 | Source |
| Memory | Micron | 368.1† | 99.3 | 85.0 | Source |
| Networking and optics | Arista Networks § | 105.6† | 3.9 | 3.5 | Source |
| Networking and optics | Amphenol | 106.0† | 5.9 | 4.3 | Source |
| Networking and optics | Lumentum § | 16.5† | 0.5 | −6.9 | Source |
| Networking and optics | Coherent | 34.5† | – | 0.8 | Source |
| Networking and optics | Corning | 45.0† | 2.3 | 1.6 | Source |
| Electrical equipment | Vertiv § | 48.2† | 1.8 | 1.3 | Source |
| Electrical equipment | Eaton | 139.0† | – | 4.1 | Source |
| Electrical equipment | Schneider Electric § | 160.0 | – | 4.9 | Source |
| Electrical equipment | ABB | 134.0 | 6.0 | 4.7 | Source |
| Electrical equipment | Hitachi | 146.7 | – | 5.0 | Source |
| Electrical equipment | HD Hyundai Electric | 20.2‡ | 0.7 | 0.5 | Source |
| Electrical equipment | Hyosung Heavy Industries | 12.1‡ | 0.5 | 0.4 | Source |
| Electrical equipment | LS ELECTRIC | 10.0‡ | 0.3 | 0.2 | Source |
| Power generation | Siemens Energy § | – | – | 4.3 | Source |
| Power generation | GE Vernova | 144.0† | 1.4 | 4.9 | Source |
| Power generation | Bloom Energy § | 3.9† | 0.1 | −0.1 | Source |
| Power generation | Caterpillar | 180.9† | 11.2 | 8.9 | Source |
| Power generation | Cummins | 45.1† | 4.0 | 2.8 | Source |
| Cooling | Mitsubishi Heavy Industries § | 73.1 | – | 2.1 | Source |
| Cooling | Trane Technologies § | 97.2† | 4.0 | 2.9 | Source |
| Construction | Quanta Services § | 55.8† | 1.6 | 1.0 | Source |
As of fiscal years ending 2025-11-02 to 2026-09-30 · market cap 2024-06-28 to 2026-10-30
This table shows where AI data center spending goes. It is not a recommendation to buy or sell any company's shares and is not a basis for investment decisions. Figures are taken from company filings and exchange statistics and differ in fiscal year, definition and date.
US$ billion. Operating and net income are the latest annual results; other currencies are converted at Federal Reserve rates (ACW conversion). Shading in the operating and net income columns uses one colour and shows only larger or smaller within the column (log scale), not better or worse. The market cap column mixes definitions and is not shaded. "−" in red marks a loss and is not shaded. For the 6 companies with "–", we found no operating income line in the filings we checked.
Market values use official routes only, not quote sites, so definitions and dates are mixed. † is the market value held by non-affiliates on the cover of U.S. annual reports, smaller than total market cap (20 companies). ‡ marks 5 Korean companies: shares outstanding times the average price for December 2025 in the same annual report (ACW calculation). The 7 unmarked values are exchange statistics or company reports. Siemens Energy (1): blank because no official value was obtained.
Which occupations
Jobs supported by the same $1 million (United States, 2025)
BLS employment requirements. Applies only to what is produced in the United States; industry averages. BLS
56% of the money goes to servers, but the same amount supports 1.6 times as many jobs in construction as in semiconductors (ACW calculation). Chips and memory made outside the United States do not appear in U.S. employment statistics.
According to an industry statement, one building takes 12 to 18 months and about 1,500 people work at the peak of construction. Once built, about 50 remain, roughly half of them direct employees.
Industry statement reported by the Virginia legislature's audit body (JLARC), 2024. JLARC
| Occupation | Main industry | Employment 2025 | 2025→2035 (BLS projection) |
|---|---|---|---|
| Electricians | Electrical contractors | 545,000 | +11.4% |
| HVAC and refrigeration mechanics | Plumbing and HVAC contractors | 298,800 | +13.5% |
| Plumbers, pipefitters and steamfitters | Plumbing and HVAC contractors | 332,300 | +8.1% |
| Power-line installers | Electric power industry | 62,900 | +15.3% |
| Powerhouse, substation and relay repairers | Electric power industry | 13,000 | +12.9% |
| Semiconductor processing technicians | Semiconductor manufacturing | 27,700 | +8.9% |
| Power plant operators | Electric power industry | 19,800 | −6.4% |
BLS Employment Projections 2025–35, United States. Employment within that industry; not the data center share alone. Each occupation links to its page. BLS
Emerging roles
| Role | Current status |
|---|---|
| Data center technician | Listed as an apprenticeable occupation by the U.S. Labor Department on 2026-11-18. Installs servers and cables and checks redundant power |
| Commissioning engineer | Not found as a separate occupation (searched: O*NET 31.0, apprenticeship bulletin titles). Listed as one title of energy engineers |
| Liquid cooling maintenance | Not found within the search (O*NET, apprenticeship bulletin titles, Korean Standard Classification of Occupations handbook) |
| Critical facilities operation | Not found within the search (O*NET, apprenticeship bulletin titles, Korean Standard Classification of Occupations handbook) |
| Status in South Korea | "Data center" has 0 hits in classification and unit names on the official NCS site (control word "cloud" in classification names: 115). Not in the 2024 and 2025 announcements of new Dictionary of Occupations entries either (within the search). Adjacent units cover server and storage management and internet service infrastructure NCS · Ministry of Employment and Labor (2024-06) · Ministry of Employment and Labor (2025-07) |
As of searched 2026-11-26
How many jobs one gigawatt supports
ACW calculation, not a source value
| Where the money goes | Amount (Epoch model) | U.S. production share (ACW calculation) | Job-years (ACW calculation) | Calculable |
|---|---|---|---|---|
| Facility (construction) | $11.4B | 100% | 65,900 | Yes (upper bound) |
| Servers | $21.2B | 5~42% | 3,200~26,200 | 8× range |
| Network | $4.9B | 36~42% | 4,000~4,800 | Partly |
| Utility works | $0.16B | 52~100% | 400~900 | Partly |
| Land | $0.17B | – | – | Not applicable |
| Total (excluding land) | $37.7B | 73,500~97,800 |
As of cost model 2026-05 · employment coefficients 2025
Calculated by ACW; not a value from the sources. 1 GW is IT nameplate capacity. Epoch AI cost items × import shares of investment goods in BEA input-output tables × BLS employment requirements (2025). A job-year is one job supported for one year across the supply chain. Servers receive 56% of the money but support only 4–27% of the jobs, while the facility receives 30% and supports 67–90%. No official source gives the current U.S. production share of AI servers (BEA tables end in 2023), so read the server range as an order of magnitude only. Jobs outside the United States are not in this calculation.
Occupations on the power supply side
| Occupation (United States) | 2025→2035 (BLS projection) |
|---|---|
| Solar photovoltaic installers | +36.5% |
| Wind turbine technicians | +29.5% |
| Power-line installers (all industries) | +10.3% |
| Electrical engineers | +9.9% |
| Substation and relay repairers | +9.7% |
| Power plant operators (all industries) | −5.1% |
| Nuclear reactor operators | −5.9% |
| Source | Permanent on-site jobs per GW |
|---|---|
| Large nuclear | about 500 |
| Small modular reactor (estimate) | 237 |
| Coal | 107 |
| Wind | 80 |
| Solar | 36 |
| Gas | 30 |
As of BLS 2025–35 · U.S. DOE 2024-10
Left: BLS Employment Projections 2025–35, all industries. Right: U.S. Department of Energy (2024), a single source. All are figures for the whole power sector; no official source separating data center supply was found (within what was collected). The two agencies point in different directions on nuclear: BLS projects −5.2% employment in nuclear generation (operation) to 2035, while DOE sees about 375,000 more workers needed for 200 GW of new plants by 2050 (about 275,000 of them in construction and manufacturing). Periods and scopes differ, so they cannot be set against each other directly. DOE states that data centers are causing shortages in skilled electrical trades, and 36% of transmission and distribution companies named line workers as the hardest job to fill. The Labor Department issued seven power apprenticeship bulletins (eight occupational standards) in 2025–26. South Korea aims to train 4,500 nuclear specialists by 2030; no NCS unit for small modular reactors was found (within the search). U.S. DOE · BLS · Industry ministry (2023-05)
Sources and terms
Sources, licences and modifications for this section are listed in Credits & Data Sources.